Utility Savings
Building Name
Aug-07
Aug-08
APOLLO MIDDLE 223,200.000 KWH 273,600.000 KWH
ARTHUR ASHE MIDDLE 350,800.000 KWH 323,200.000 KWH
ATLANTIC VOC CENTER 646,010.000 KWH 589,875.000 KWH
ATLANTIC WEST ELEM 169,560.000 KWH 147,480.000 KWH
ATTUCKS MIDDLE 369,127.000 KWH 304,080.000 KWH
BAIR MIDDLE 263,520.000 KWH 204,960.000 KWH
BANYAN ELEM 141,480.000 KWH 121,560.000 KWH
BAYVIEW ELEM 114,360.000 KWH 133,200.000 KWH
BECON 221,720.000 KWH 229,640.000 KWH
BENNETT ELEM 126,000.000 KWH 122,160.000 KWH
BETHUNE ELEM 335,760.000 KWH 235,920.000 KWH
BOULEVARD HEIGHTS ELEM 98,760.000 KWH 158,640.000 KWH
BOYD ANDERSON HIGH 601,583.000 KWH 496,512.000 KWH
BRIGHT HORIZONS CTR 162,960.000 KWH 166,560.000 KWH
BROADVIEW ELEM 164,686.000 KWH 157,372.000 KWH
BROWARD EDUCATION FOUNDATION 19,473.000 KWH .000 KWH
BROWARD ESTATES ELEM 205,498.000 KWH 137,654.000 KWH
BROWARD FIRE ACADEMY 33,360.000 KWH 31,966.000 KWH
CASTLE HILL ELEM 145,440.000 KWH 150,360.000 KWH
CENTRAL AREA ADMINISTRATIVE 39,120.000 KWH .000 KWH
CENTRAL PARK ELEM 175,320.000 KWH 147,720.000 KWH
CHALLENGER ELEMENTARY 175,320.000 KWH 170,760.000 KWH
CHAPEL TRAIL ELEM 240,697.000 KWH 227,113.000 KWH
CHARLES DREW ELEM 115,440.000 KWH 111,000.000 KWH
COCONUT CREEK ELEM 106,177.000 KWH 76,683.000 KWH
COCONUT CREEK HIGH 485,943.000 KWH 330,776.000 KWH
COCONUT PALM ELEMENTARY 190,200.000 KWH 157,920.000 KWH
COLBERT ELEM 158,880.000 KWH 124,320.000 KWH
COLLINS ELEM 108,240.000 KWH 87,360.000 KWH
COOPER CITY COMM 11,008.000 KWH 4,292.000 KWH
COOPER CITY ELEM 168,720.000 KWH 152,160.000 KWH
COOPER CITY HIGH 569,386.000 KWH 581,347.000 KWH
CORAL COVE ELEMENTARY 115,680.000 KWH 123,120.000 KWH
CORAL GLADES HIGH 475,680.000 KWH 504,960.000 KWH
CORAL PARK ELEM 137,160.000 KWH 155,640.000 KWH
CORAL SPRINGS ELEM 142,800.000 KWH 127,440.000 KWH
CORAL SPRINGS COMMUNITY 434,172.000 KWH 439,724.000 KWH
CORAL SPRINGS HIGH 302,040.000 KWH 254,040.000 KWH
CORAL SPRINGS MIDDLE 195,360.000 KWH 152,760.000 KWH
COUNTRY HILLS ELEM 196,560.000 KWH 177,360.000 KWH
COUNTRY ISLES ELEM 132,240.000 KWH 131,640.000 KWH
CRESTHAVEN ELEM 130,935.000 KWH 106,371.000 KWH
CROISSANT PARK ELEM 72,540.000 KWH 75,360.000 KWH
CROSS CREEK 12,862.000 KWH 10,514.000 KWH
CRYSTAL LAKE COMM SCHOOL 372,730.000 KWH 273,118.000 KWH
CRYSTAL LAKE MIDDLE 557,200.000 KWH 489,200.000 KWH
CYPRESS BAY HIGH 279,624.000 KWH 68,640.000 KWH
CYPRESS BAY HIGH ANNEX 135,840.000 KWH 116,640.000 KWH
CYPRESS ELEM 52,348.000 KWH 85,775.000 KWH
CYPRESS RUN ALTERNATIVE 152,914.000 KWH 140,315.000 KWH
DANIA ELEM 122,160.000 KWH 120,720.000 KWH
DAVE THOMAS ED CENTER (WEST) 48,597.000 KWH 47,693.000 KWH
DAVE THOMAS EDUCATION CENTER 150,283.000 KWH 126,555.000 KWH
DAVIE ELEM 201,966.000 KWH 217,080.000 KWH
DEERFIELD BEACH ELEM 501,714.000 KWH 467,663.000 KWH
DEERFIELD BEACH HIGH 372,222.000 KWH 302,489.000 KWH
DEERFIELD BEACH MID 190,200.000 KWH 136,200.000 KWH
DEERFIELD PARK ELEM 175,560.000 KWH 148,680.000 KWH
DILLARD ELEM 5,926.000 KWH 5,491.000 KWH
DILLARD HIGH COMM 787,623.000 KWH 632,556.000 KWH
DILLARD HIGH SCHOOL 118,800.000 KWH 117,360.000 KWH
DOLPHIN BAY ELEMENTARY 95,201.000 KWH 74,435.000 KWH
DREW RESOURCE CTR 114,323.000 KWH 83,362.000 KWH
DRIFTWOOD ELEM 463,234.000 KWH 464,813.000 KWH
DRIFTWOOD MIDDLE 287,280.000 KWH 276,120.000 KWH
EAGLE POINT ELEM 183,480.000 KWH 162,360.000 KWH
EAGLE RIDGE ELEM 42,449.000 KWH 35,183.000 KWH
ECIA SPECIAL PROGRAMS 64,576.000 KWH 51,736.000 KWH
EDGEWOOD CENTER 856,254.000 KWH 790,723.000 KWH
ELY HIGH 106,200.000 KWH 94,680.000 KWH
EMBASSY CREEK ELEM 67,440.000 KWH 82,800.000 KWH
ENDEAVOR LEARNING CENTER 173,678.000 KWH 103,459.000 KWH
EVERGLADES 9TH GRADE ANNEX 229,058.000 KWH 255,627.000 KWH
EVERGLADES ELEMENTARY 720,360.000 KWH 614,040.000 KWH
EVERGLADES HIGH 198,960.000 KWH 173,760.000 KWH
FAIRWAY ELEM 472,480.000 KWH 425,866.000 KWH
FALCON COVE MIDDLE 133,648.000 KWH 160,648.000 KWH
FLAMINGO ELEM 587,946.000 KWH 534,799.000 KWH
FLANAGAN HIGH 163,896.000 KWH 194,856.000 KWH
FLORANADA ELEM 246,951.000 KWH 196,560.000 KWH
FOREST GLEN MIDDLE 133,200.000 KWH 126,960.000 KWH
FOREST HILLS ELEM 490,574.000 KWH 531,054.000 KWH
FORT LAUDERDALE HIGH 174,120.000 KWH 148,320.000 KWH
FORT LAUDERDALE HIGH ANNEX 273,480.000 KWH 290,280.000 KWH
FOX TRAIL ELEMENTARY 152,000.000 KWH 284,800.000 KWH
GATOR RUN ELEMENTARY 124,920.000 KWH 95,880.000 KWH
GLADES MIDDLE 121,800.000 KWH 96,600.000 KWH
GRIFFIN ELEM 220,468.000 KWH 200,789.000 KWH
GULFSTREAM MIDDLE SCHOOL 217,440.000 KWH 163,440.000 KWH
HALLANDALE ADULT CENTER 304,255.000 KWH 295,600.000 KWH
HALLANDALE ELEM 143,136.000 KWH 81,048.000 KWH
HALLANDALE HIGH 179,040.000 KWH 181,461.000 KWH
HARBORDALE ELEM 46,080.000 KWH 41,640.000 KWH
HAWKES BLUFF ELEM 119,280.000 KWH 103,200.000 KWH
HOLLYWOOD CENTRAL AUDITORIUM 4,794.000 KWH 3,635.000 KWH
HOLLYWOOD CENTRAL ELEM 115,800.000 KWH 168,840.000 KWH
HOLLYWOOD HILLS COMMUNITY 434,593.000 KWH 404,246.000 KWH
HOLLYWOOD HILLS ELEMENTARY 95,520.000 KWH 100,800.000 KWH
HOLLYWOOD HILLS HIGH 150,840.000 KWH 114,120.000 KWH
HOLLYWOOD PARK ELEM 85,481.000 KWH 74,206.000 KWH
HORIZON ELEM 314,944.000 KWH 266,196.000 KWH
HORTT ADMIN SITE 162,840.000 KWH 152,400.000 KWH
INDIAN RIDGE MIDDLE 145,320.000 KWH 129,924.000 KWH
INDIAN TRACE ELEM 502,004.000 KWH 460,296.000 KWH
JAMES HUNT ELEMENTARY 201,168.000 KWH 233,160.000 KWH
KATHLEEN WRIGHT ADMIN 132,000.000 KWH 132,000.000 KWH
LAKE FOREST ELEM 98,640.000 KWH 81,600.000 KWH
LAKESIDE ELEMENTARY 160,119.000 KWH 120,341.000 KWH
LANIER JAMES CENTER 227,040.000 KWH 207,840.000 KWH
LARKDALE ELEM 237,600.000 KWH 250,320.000 KWH
LAUDERDALE LAKES MIDDLE 240,600.000 KWH 183,600.000 KWH
LAUDERDALE MANORS ELEM 5,373.000 KWH 4,326.000 KWH
LAUDERHILL MIDDLE 156,720.000 KWH 153,840.000 KWH
LAUDERHILL MIDDLE/COMM 178,560.000 KWH 171,120.000 KWH
LAUDERHILL PT ELEM 129,600.000 KWH 144,480.000 KWH
LIBERTY ELEMENTARY 62,642.000 KWH 90,624.000 KWH
LLOYD ESTATES ELEM 300,720.000 KWH 336,000.000 KWH
LOCKHART STADIUM 174,525.000 KWH 164,386.000 KWH
LYONS CREEK MIDDLE 170,160.000 KWH 139,320.000 KWH
MANATEE BAY ELEMENTARY 179,820.000 KWH 186,120.000 KWH
MAPLEWOOD ELEM 384,077.000 KWH 298,940.000 KWH
MARGATE ELEM 105,990.000 KWH 124,571.000 KWH
MARGATE MIDDLE 195,155.000 KWH 176,998.000 KWH
MARKHAM ELEM 581,086.000 KWH 451,772.000 KWH
MARTIN LUTHER KING ELEM 360,720.000 KWH 330,720.000 KWH
MCARTHUR HIGH 179,169.000 KWH 156,960.000 KWH
MCFATTER VO TECH 339,120.000 KWH 289,200.000 KWH
MCNAB ELEMENTARY 164,625.000 KWH 175,993.000 KWH
MCNICOL MIDDLE 333,360.000 KWH 312,000.000 KWH
MEADOWBROOK ELEM 168,240.000 KWH 160,200.000 KWH
MILLENNIUM MIDDLE 520,585.000 KWH 406,061.000 KWH
MIRAMAR ELEM 95,280.000 KWH 84,480.000 KWH
MIRAMAR HIGH 364,400.000 KWH 406,000.000 KWH
MIRROR LAKE ELEM 127,920.000 KWH 106,800.000 KWH
MONARCH HIGH 29,640.000 KWH 26,760.000 KWH
MORROW ELEM 199,126.000 KWH 214,104.000 KWH
MULTICULTURAL CENTER 264,117.000 KWH 255,467.000 KWH
N ANDREWS GARDENS ELEM 192,744.000 KWH 179,784.000 KWH
NEW RENAISSANCE MIDDLE 284,760.000 KWH 287,280.000 KWH
NEW RIVER MIDDLE SCHOOL 122,040.000 KWH 138,960.000 KWH
NOB HILL ELEM 188,818.000 KWH 218,881.000 KWH
NORCREST ELEM 41,100.000 KWH 38,160.000 KWH
NORTH AREA MAINT/WHSE 8,837.000 KWH .000 KWH
NORTH AREA SUPERINTENDENT 82,710.000 KWH 80,684.000 KWH
NORTH BUS PARKING LOT 114,120.000 KWH 108,300.000 KWH
NORTH CENTRAL SUPERINTENDENT 203,640.000 KWH 181,080.000 KWH
NORTH FORK ELEM 107,760.000 KWH 103,200.000 KWH
NORTH LAUDERDALE ELEM 114,840.000 KWH 123,000.000 KWH
NORTH SIDE ELEMENTARY 326,936.000 KWH 332,753.000 KWH
NORTH WEST TRANSPORTATION 289,200.000 KWH 214,800.000 KWH
NORTHEAST HIGH 12,134.000 KWH 9,118.000 KWH
NOVA BLANCHE FORMAN/EISENHOWER ELEM 5,208.000 KWH 4,773.000 KWH
NOVA EISENHOWER ELEMENTARY 756,800.000 KWH 627,200.000 KWH
NOVA HIGH 3.000 KWH .000 KWH
NOVA HIGH - MECH PLANT 182,040.000 KWH 177,000.000 KWH
NOVA HIGH COMM/GED 174,826.000 KWH 141,419.000 KWH
OAKLAND PARK ELEM 201,240.000 KWH 182,640.000 KWH
OAKRIDGE ELEM 145,640.000 KWH 143,720.000 KWH
OLSEN MIDDLE 329,520.000 KWH 135,840.000 KWH
OLSEN MIDDLE ANNEX 160,800.000 KWH 124,800.000 KWH
ORANGEBROOK ELEM 136,440.000 KWH 130,200.000 KWH
ORIOLE ELEM 226,560.000 KWH 143,760.000 KWH
PALM COVE ELEM 132,000.000 KWH 103,320.000 KWH
PALMVIEW ELEM 258,480.000 KWH 213,840.000 KWH
PANTHER RUN ELEM 39,744.000 KWH 19,528.000 KWH
PARK LAKES ELEMENTARY 146,400.000 KWH 138,720.000 KWH
PARK LAKES ELEMENTARY ANNEX 197,520.000 KWH 162,960.000 KWH
PARK RIDGE ELEM 232,680.000 KWH 211,560.000 KWH
PARK SPRINGS ELEM 170,880.000 KWH 162,960.000 KWH
PARK TRAILS ELEMENTARY 402,726.000 KWH 400,782.000 KWH
PARKSIDE ELEMENTARY 192,182.000 KWH 133,944.000 KWH
PARKWAY MIDDLE 142,800.000 KWH 137,220.000 KWH
PASADENA LAKES ELEM 127,365.000 KWH 138,903.000 KWH
PEMBROKE LAKES ELEM 150,846.000 KWH 146,811.000 KWH
PEMBROKE PINES ELEM 240,960.000 KWH 277,440.000 KWH
PERRY ELEM 122,405.000 KWH 149,901.000 KWH
PERRY MIDDLE 124,440.000 KWH 116,400.000 KWH
PETERS ELEM 104,160.000 KWH 93,360.000 KWH
PHYSICAL PLANT OPERATIONS 188,400.000 KWH 135,000.000 KWH
PINE RIDGE CTR 493,900.000 KWH 206,968.000 KWH
PINES LAKES ELEM 176,400.000 KWH 162,240.000 KWH
PINES MIDDLE 188,817.000 KWH 176,542.000 KWH
PINEWOOD ELEM 31,800.000 KWH 33,480.000 KWH
PIONEER MIDDLE 526,648.000 KWH 480,294.000 KWH
PIONEER MIDDLE ANNEX 248,923.000 KWH 141,704.000 KWH
PIPER HIGH 449,057.000 KWH 381,368.000 KWH
PLANTATION ELEM 205,648.000 KWH 204,106.000 KWH
PLANTATION HIGH 92,589.000 KWH 80,705.000 KWH
PLANTATION MIDDLE 141,240.000 KWH 130,800.000 KWH
PLANTATION PARK ELEM 436,959.000 KWH 368,755.000 KWH
POMPANO BEACH ELEM 305,376.000 KWH 289,488.000 KWH
POMPANO BEACH HIGH 24,859.000 KWH 23,135.000 KWH
POMPANO BEACH MIDDLE 204,900.000 KWH 179,820.000 KWH
PPO ZONE 2 - LEASED 144,240.000 KWH 130,320.000 KWH
QUIET WATERS ELEM 313,680.000 KWH 285,840.000 KWH
RAMBLEWOOD ELEM 200,875.000 KWH 182,793.000 KWH
RAMBLEWOOD MIDDLE 131,400.000 KWH 118,440.000 KWH
RICKARDS MIDDLE 95,040.000 KWH 94,200.000 KWH
RIVERGLADES ELEM 192,480.000 KWH 169,320.000 KWH
RIVERLAND ELEM 109,632.000 KWH 97,992.000 KWH
RIVERSIDE ELEM 186,697.000 KWH 184,466.000 KWH
ROCK ISLAND ADMIN 145,200.000 KWH 120,000.000 KWH
ROYAL PALM ELEMENTARY 226,440.000 KWH 163,200.000 KWH
SAFETY DEPARTMENT 159,240.000 KWH 131,280.000 KWH
SANDERS PARK ELEM 244,680.000 KWH 241,200.000 KWH
SANDPIPER ELEM 129,360.000 KWH 168,480.000 KWH
SAWGRASS ELEM 129,956.000 KWH 127,511.000 KWH
SAWGRASS SPRINGS MIDDLE 289,680.000 KWH 273,120.000 KWH
SEA CASTLE ELEM 116,334.000 KWH 95,766.000 KWH
SEAGULL SCHOOL 147,840.000 KWH 155,040.000 KWH
SEMINOLE MIDDLE 478,080.000 KWH 402,240.000 KWH
SHERIDAN HILLS ELEM 195,240.000 KWH 122,880.000 KWH
SHERIDAN PARK ELEM 231,120.000 KWH 161,880.000 KWH
SHERIDAN VOCATIONAL 214,080.000 KWH 156,120.000 KWH
SILVER LAKES ELEMENTARY 226,080.000 KWH 191,040.000 KWH
SILVER LAKES MIDDLE 217,920.000 KWH 140,040.000 KWH
SILVER PALMS ELEM 293,280.000 KWH 255,600.000 KWH
SILVER RIDGE ELEM 42,730.000 KWH 40,466.000 KWH
SILVER SHORES ELEMENTARY 26,436.000 KWH 24,045.000 KWH
SILVER TRAIL MIDDLE 510,585.000 KWH 517,094.000 KWH
SOUTH AREA BUS PARKING 496,158.000 KWH 438,134.000 KWH
SOUTH AREA MAINTENANCE 2,395.000 KWH 40,485.000 KWH
SOUTH BROWARD HIGH 165,814.000 KWH 202,285.000 KWH
SOUTH PLANTATION HIGH 114,840.000 KWH 128,160.000 KWH
SOUTH WEST BUS LOT 530,000.000 KWH 494,800.000 KWH
STEPHEN FOSTER ELEM 505,937.000 KWH 485,761.000 KWH
STIRLING ELEM 119,040.000 KWH 99,360.000 KWH
STONEMAN DOUGLAS HIGH 279,611.000 KWH 295,933.000 KWH
STRANAHAN HIGH 129,840.000 KWH 122,280.000 KWH
SUNLAND PARK ELEM 164,592.000 KWH 140,352.000 KWH
SUNRISE MIDDLE 150,426.000 KWH 136,024.000 KWH
SUNSET LAKES ELEMENTARY 186,240.000 KWH 164,640.000 KWH
SUNSET SCHOOL 484,931.000 KWH 488,867.000 KWH
SUNSHINE ELEMENTARY 358,800.000 KWH 390,000.000 KWH
TAMARAC ELEM 213,338.000 KWH 175,150.000 KWH
TARAVELLA HIGH 243,720.000 KWH 210,600.000 KWH
TECHNOLOGY AND SUPPORT SERVICE 121,920.000 KWH 111,840.000 KWH
TEDDER ELEMENTARY SCHOOL 101,544.000 KWH 99,504.000 KWH
TEQUESTA TRACE MIDDLE 190,800.000 KWH 214,560.000 KWH
THE QUEST CENTER .000 KWH 13,320.000 KWH
THURGOOD MARSHALL ELEM 157,973.000 KWH 153,665.000 KWH
TRADEWINDS ELEM 73,440.000 KWH 67,200.000 KWH
TROPICAL ELEM 3,871.000 KWH 3,555.000 KWH
TWIN LAKES ANNEX/NEW WHSE 122,519.000 KWH 121,523.000 KWH
TWIN LAKES COMPLEX 97,920.000 KWH 99,120.000 KWH
VEHICLE MAINTENANCE 162,480.000 KWH 182,700.000 KWH
VILLAGE ELEM 150,840.000 KWH 106,680.000 KWH
VIRGINIA YOUNG ELEM 287,559.000 KWH 195,746.000 KWH
WALKER ELEM 448,524.000 KWH 492,166.000 KWH
WALTER C YOUNG MIDDLE 174,840.000 KWH 186,480.000 KWH
WATKINS ELEM 119,880.000 KWH 108,000.000 KWH
WELLEBY ELEM .000 KWH 396,800.000 KWH
WEST CENTRAL BUS COMPLEX 69,354.000 KWH 67,158.000 KWH
WEST HOLLYWOOD ELEM 90,360.000 KWH 99,120.000 KWH
WESTCHESTER ELEMENTARY 157,439.000 KWH 132,551.000 KWH
WESTERN HIGH 534,376.000 KWH 479,732.000 KWH
WESTGLADES MIDDLE 299,280.000 KWH 268,080.000 KWH
WESTPINE MIDDLE 178,080.000 KWH 159,480.000 KWH
WESTWOOD HEIGHTS ELEM 204,412.000 KWH 171,564.000 KWH
WHIDDON-ROGERS ED CENTER 154,400.000 KWH 148,400.000 KWH
WHISPERING PINES 99,360.000 KWH 91,560.000 KWH
WILLIAM DANDY MIDDLE 230,400.000 KWH 185,880.000 KWH
WILTON MANORS ELEM 174,720.000 KWH 161,520.000 KWH
WINGATE OAKS CTR 163,800.000 KWH 122,520.000 KWH
WINSTON PARK ELEM 146,640.000 KWH 168,240.000 KWH