Building |
Aug-08 |
Aug-09 |
| APOLLO MIDDLE |
273,600.000 KWH |
256,560.000 KWH |
| ARTHUR ASHE MIDDLE |
323,200.000 KWH |
284,800.000 KWH |
| ATLANTIC VOC CENTER |
589,875.000 KWH |
584,562.000 KWH |
| ATLANTIC WEST ELEM |
147,480.000 KWH |
120,360.000 KWH |
| ATTUCKS MIDDLE |
304,080.000 KWH |
305,776.000 KWH |
| BAIR MIDDLE |
204,960.000 KWH |
208,320.000 KWH |
| BANYAN ELEM |
121,560.000 KWH |
129,120.000 KWH |
| BAYVIEW ELEM |
133,200.000 KWH |
104,880.000 KWH |
| BECON |
229,640.000 KWH |
170,400.000 KWH |
| BENNETT ELEM |
122,160.000 KWH |
78,000.000 KWH |
| BETHUNE ELEM |
235,920.000 KWH |
213,960.000 KWH |
| BOULEVARD HEIGHTS ELEM |
158,640.000 KWH |
100,080.000 KWH |
| BOYD ANDERSON HIGH |
496,512.000 KWH |
519,416.000 KWH |
| BRIGHT HORIZONS CTR |
166,560.000 KWH |
135,360.000 KWH |
| BROADVIEW ELEM |
157,372.000 KWH |
145,403.000 KWH |
| BROWARD ESTATES ELEM |
137,654.000 KWH |
130,275.000 KWH |
| BROWARD FIRE ACADEMY |
31,966.000 KWH |
38,458.000 KWH |
| CASTLE HILL ELEM |
150,360.000 KWH |
136,320.000 KWH |
| CENTRAL PARK ELEM |
147,720.000 KWH |
78,720.000 KWH |
| CHALLENGER ELEMENTARY |
170,760.000 KWH |
152,280.000 KWH |
| CHAPEL TRAIL ELEM |
227,113.000 KWH |
171,674.000 KWH |
| CHARLES DREW ELEM |
111,000.000 KWH |
119,160.000 KWH |
| COCONUT CREEK ELEM |
76,683.000 KWH |
65,930.000 KWH |
| COCONUT CREEK HIGH |
330,776.000 KWH |
247,754.000 KWH |
| COCONUT PALM ELEMENTARY |
157,920.000 KWH |
115,440.000 KWH |
| COLBERT ELEM |
124,320.000 KWH |
176,880.000 KWH |
| COLLINS ELEM |
87,360.000 KWH |
80,640.000 KWH |
| COMMUNITY SCHOOL NORTH |
30,720.000 KWH |
29,520.000 KWH |
| COMMUNITY SCHOOL SOUTH |
.000 KWH |
12,580.000 KWH |
| COOPER CITY COMM |
4,292.000 KWH |
8,164.000 KWH |
| COOPER CITY ELEM |
152,160.000 KWH |
46,560.000 KWH |
| COOPER CITY HIGH |
581,347.000 KWH |
520,913.000 KWH |
| CORAL COVE ELEMENTARY |
123,120.000 KWH |
99,840.000 KWH |
| CORAL GLADES HIGH |
504,960.000 KWH |
501,360.000 KWH |
| CORAL PARK ELEM |
155,640.000 KWH |
129,960.000 KWH |
| CORAL SPRINGS ELEM |
127,440.000 KWH |
102,000.000 KWH |
| CORAL SPRINGS HIGH |
439,724.000 KWH |
440,664.000 KWH |
| CORAL SPRINGS MIDDLE |
254,040.000 KWH |
219,240.000 KWH |
| COUNTRY HILLS ELEM |
152,760.000 KWH |
168,960.000 KWH |
| COUNTRY ISLES ELEM |
177,360.000 KWH |
203,400.000 KWH |
| CRESTHAVEN ELEM |
131,640.000 KWH |
126,240.000 KWH |
| CROISSANT PARK ELEM |
106,371.000 KWH |
106,911.000 KWH |
| CROSS CREEK |
75,360.000 KWH |
74,340.000 KWH |
| CRYSTAL LAKE COMM SCHOOL |
10,514.000 KWH |
10,801.000 KWH |
| CRYSTAL LAKE MIDDLE |
273,118.000 KWH |
283,665.000 KWH |
| CYPRESS BAY HIGH |
489,200.000 KWH |
446,400.000 KWH |
| CYPRESS BAY HIGH ANNEX |
68,640.000 KWH |
54,000.000 KWH |
| CYPRESS ELEM |
116,640.000 KWH |
111,120.000 KWH |
| CYPRESS RUN ALTERNATIVE |
85,775.000 KWH |
78,283.000 KWH |
| DANIA ELEM |
140,315.000 KWH |
139,431.000 KWH |
| DAVE THOMAS ED CENTER (WEST) |
120,720.000 KWH |
82,560.000 KWH |
| DAVE THOMAS EDUCATION CENTER |
47,693.000 KWH |
46,695.000 KWH |
| DAVIE ELEM |
126,555.000 KWH |
100,126.000 KWH |
| DEERFIELD BEACH ELEM |
217,080.000 KWH |
174,491.000 KWH |
| DEERFIELD BEACH HIGH |
467,663.000 KWH |
430,161.000 KWH |
| DEERFIELD BEACH MID |
302,489.000 KWH |
335,752.000 KWH |
| DEERFIELD PARK ELEM |
136,200.000 KWH |
149,040.000 KWH |
| DILLARD ELEM |
148,680.000 KWH |
112,320.000 KWH |
| DILLARD HIGH COMM |
5,491.000 KWH |
.000 KWH |
| DILLARD HIGH SCHOOL |
632,556.000 KWH |
651,777.000 KWH |
| DISCOVERY ELEMENTARY |
.000 KWH |
248,880.000 KWH |
| DOLPHIN BAY ELEMENTARY |
117,360.000 KWH |
102,480.000 KWH |
| DREW RESOURCE CTR |
74,435.000 KWH |
103,991.000 KWH |
| DRIFTWOOD ELEM |
83,362.000 KWH |
88,660.000 KWH |
| DRIFTWOOD MIDDLE |
464,813.000 KWH |
342,245.000 KWH |
| EAGLE POINT ELEM |
276,120.000 KWH |
245,880.000 KWH |
| EAGLE RIDGE ELEM |
162,360.000 KWH |
133,680.000 KWH |
| ECIA SPECIAL PROGRAMS |
35,183.000 KWH |
33,255.000 KWH |
| EDGEWOOD CENTER |
51,736.000 KWH |
76,456.000 KWH |
| ELY HIGH |
790,723.000 KWH |
653,760.000 KWH |
| EMBASSY CREEK ELEM |
94,680.000 KWH |
107,280.000 KWH |
| ENDEAVOR LEARNING CENTER |
82,800.000 KWH |
69,480.000 KWH |
| EVERGLADES ELEMENTARY |
255,627.000 KWH |
149,324.000 KWH |
| EVERGLADES HIGH |
614,040.000 KWH |
445,080.000 KWH |
| FAIRWAY ELEM |
173,760.000 KWH |
160,680.000 KWH |
| FALCON COVE MIDDLE |
425,866.000 KWH |
286,797.000 KWH |
| FLAMINGO ELEM |
160,648.000 KWH |
111,448.000 KWH |
| FLANAGAN HIGH |
534,799.000 KWH |
515,741.000 KWH |
| FLORANADA ELEM |
194,856.000 KWH |
157,656.000 KWH |
| FOREST GLEN MIDDLE |
196,560.000 KWH |
182,605.000 KWH |
| FOREST HILLS ELEM |
126,960.000 KWH |
139,320.000 KWH |
| FORT LAUDERDALE HIGH |
531,054.000 KWH |
387,589.000 KWH |
| FOX TRAIL ELEMENTARY |
148,320.000 KWH |
135,600.000 KWH |
| GATOR RUN ELEMENTARY |
290,280.000 KWH |
192,720.000 KWH |
| GLADES MIDDLE |
284,800.000 KWH |
265,200.000 KWH |
| GRIFFIN ELEM |
95,880.000 KWH |
83,280.000 KWH |
| GULFSTREAM MIDDLE SCHOOL |
96,600.000 KWH |
110,760.000 KWH |
| HALLANDALE ADULT CENTER |
200,789.000 KWH |
197,505.000 KWH |
| HALLANDALE ELEM |
163,440.000 KWH |
160,560.000 KWH |
| HALLANDALE HIGH |
295,600.000 KWH |
347,735.000 KWH |
| HARBORDALE ELEM |
81,048.000 KWH |
77,688.000 KWH |
| HAWKES BLUFF ELEM |
181,461.000 KWH |
136,323.000 KWH |
| HERON HEIGHTS ELEMENTARY |
.000 KWH |
176,400.000 KWH |
| HOLLYWOOD CENTRAL AUDITORIUM |
41,640.000 KWH |
43,200.000 KWH |
| HOLLYWOOD CENTRAL ELEM |
103,200.000 KWH |
107,880.000 KWH |
| HOLLYWOOD HILLS COMMUNITY |
3,635.000 KWH |
4,691.000 KWH |
| HOLLYWOOD HILLS ELEMENTARY |
168,840.000 KWH |
181,440.000 KWH |
| HOLLYWOOD HILLS HIGH |
404,246.000 KWH |
409,310.000 KWH |
| HOLLYWOOD PARK ELEM |
100,800.000 KWH |
67,200.000 KWH |
| HORIZON ELEM |
114,120.000 KWH |
107,760.000 KWH |
| HORTT ADMIN SITE |
74,206.000 KWH |
60,476.000 KWH |
| INDIAN RIDGE MIDDLE |
266,196.000 KWH |
240,188.000 KWH |
| INDIAN TRACE ELEM |
152,400.000 KWH |
146,160.000 KWH |
| JAMES HUNT ELEMENTARY |
129,924.000 KWH |
111,600.000 KWH |
| KATHLEEN WRIGHT ADMIN |
460,296.000 KWH |
394,978.000 KWH |
| LAKE FOREST ELEM |
233,160.000 KWH |
171,960.000 KWH |
| LAKESIDE ELEMENTARY |
132,000.000 KWH |
102,960.000 KWH |
| LANIER JAMES CENTER |
81,600.000 KWH |
72,240.000 KWH |
| LARKDALE ELEM |
120,341.000 KWH |
97,543.000 KWH |
| LAUDERDALE LAKES MIDDLE |
207,840.000 KWH |
205,106.000 KWH |
| LAUDERDALE MANORS ELEM |
250,320.000 KWH |
141,840.000 KWH |
| LAUDERHILL MIDDLE |
183,600.000 KWH |
164,760.000 KWH |
| LAUDERHILL MIDDLE/COMM |
4,326.000 KWH |
5,408.000 KWH |
| LAUDERHILL PT ELEM |
153,840.000 KWH |
139,320.000 KWH |
| LIBERTY ELEMENTARY |
171,120.000 KWH |
136,320.000 KWH |
| LLOYD ESTATES ELEM |
144,480.000 KWH |
144,960.000 KWH |
| LOCKHART STADIUM |
90,624.000 KWH |
80,482.000 KWH |
| LYONS CREEK MIDDLE |
336,000.000 KWH |
362,400.000 KWH |
| MANATEE BAY ELEMENTARY |
164,386.000 KWH |
145,722.000 KWH |
| MAPLEWOOD ELEM |
139,320.000 KWH |
127,200.000 KWH |
| MARGATE ELEM |
186,120.000 KWH |
154,920.000 KWH |
| MARGATE MIDDLE |
298,940.000 KWH |
223,004.000 KWH |
| MARKHAM ELEM |
124,571.000 KWH |
101,107.000 KWH |
| MARTIN LUTHER KING ELEM |
176,998.000 KWH |
174,480.000 KWH |
| MCARTHUR HIGH |
451,772.000 KWH |
417,122.000 KWH |
| MCFATTER VO TECH |
330,720.000 KWH |
310,320.000 KWH |
| MCNAB ELEMENTARY |
156,960.000 KWH |
147,626.000 KWH |
| MCNICOL MIDDLE |
289,200.000 KWH |
283,680.000 KWH |
| MEADOWBROOK ELEM |
175,993.000 KWH |
171,360.000 KWH |
| MILLENNIUM MIDDLE |
312,000.000 KWH |
316,320.000 KWH |
| MIRAMAR ELEM |
160,200.000 KWH |
154,680.000 KWH |
| MIRAMAR HIGH |
406,061.000 KWH |
333,205.000 KWH |
| MIRROR LAKE ELEM |
84,480.000 KWH |
88,320.000 KWH |
| MONARCH HIGH |
406,000.000 KWH |
310,400.000 KWH |
| MORROW ELEM |
106,800.000 KWH |
77,880.000 KWH |
| MULTICULTURAL CENTER |
26,760.000 KWH |
12,000.000 KWH |
| N ANDREWS GARDENS ELEM |
214,104.000 KWH |
161,544.000 KWH |
| NEW RENAISSANCE MIDDLE |
255,467.000 KWH |
195,494.000 KWH |
| NEW RIVER CIRCLE SITE |
179,784.000 KWH |
38,304.000 KWH |
| NEW RIVER MIDDLE SCHOOL |
287,280.000 KWH |
205,560.000 KWH |
| NOB HILL ELEM |
138,960.000 KWH |
104,520.000 KWH |
| NORCREST ELEM |
218,881.000 KWH |
170,149.000 KWH |
| NORTH AREA MAINT/WHSE |
38,160.000 KWH |
35,700.000 KWH |
| NORTH BUS PARKING LOT |
80,684.000 KWH |
82,933.000 KWH |
| NORTH CENTRAL SUPERINTENDENT |
108,300.000 KWH |
86,760.000 KWH |
| NORTH FORK ELEM |
181,080.000 KWH |
130,080.000 KWH |
| NORTH LAUDERDALE ELEM |
103,200.000 KWH |
85,680.000 KWH |
| NORTH SIDE ELEMENTARY |
123,000.000 KWH |
111,000.000 KWH |
| NORTHEAST HIGH |
332,753.000 KWH |
312,910.000 KWH |
| NOVA BLANCHE FORMAN/EISENHOWER ELEM |
214,800.000 KWH |
212,000.000 KWH |
| NOVA EISENHOWER ELEMENTARY |
9,118.000 KWH |
8,539.000 KWH |
| NOVA HIGH |
4,773.000 KWH |
35,205.000 KWH |
| NOVA HIGH - MECH PLANT |
627,200.000 KWH |
604,800.000 KWH |
| OAKLAND PARK ELEM |
177,000.000 KWH |
155,280.000 KWH |
| OAKRIDGE ELEM |
141,419.000 KWH |
117,518.000 KWH |
| OFF CAMPUS ALTERNATIVE CENTER |
.000 KWH |
26.000 KWH |
| OLSEN MIDDLE |
182,640.000 KWH |
214,320.000 KWH |
| OLSEN MIDDLE ANNEX |
143,720.000 KWH |
179,480.000 KWH |
| ORANGE BROOK ELEM |
135,840.000 KWH |
132,480.000 KWH |
| ORIOLE ELEM |
124,800.000 KWH |
126,240.000 KWH |
| PALM COVE ELEM |
130,200.000 KWH |
121,680.000 KWH |
| PALMVIEW ELEM |
143,760.000 KWH |
135,960.000 KWH |
| PANTHER RUN ELEM |
103,320.000 KWH |
102,960.000 KWH |
| PARK LAKES ELEMENTARY |
213,840.000 KWH |
204,480.000 KWH |
| PARK LAKES ELEMENTARY ANNEX |
19,528.000 KWH |
52,168.000 KWH |
| PARK RIDGE ELEM |
138,720.000 KWH |
115,440.000 KWH |
| PARK SPRINGS ELEM |
162,960.000 KWH |
138,000.000 KWH |
| PARK TRAILS ELEMENTARY |
211,560.000 KWH |
171,600.000 KWH |
| PARKSIDE ELEMENTARY |
162,960.000 KWH |
151,440.000 KWH |
| PARKWAY MIDDLE |
400,782.000 KWH |
351,916.000 KWH |
| PASADENA LAKES ELEM |
133,944.000 KWH |
144,178.000 KWH |
| PEMBROKE LAKES ELEM |
137,220.000 KWH |
85,320.000 KWH |
| PEMBROKE PINES ELEM |
138,903.000 KWH |
134,351.000 KWH |
| PERRY ELEM |
146,811.000 KWH |
112,049.000 KWH |
| PERRY MIDDLE |
277,440.000 KWH |
219,120.000 KWH |
| PETERS ELEM |
149,901.000 KWH |
98,054.000 KWH |
| PHYSICAL PLANT OPERATIONS |
116,701.000 KWH |
112,286.000 KWH |
| PINE RIDGE CTR |
93,360.000 KWH |
88,080.000 KWH |
| PINES LAKES ELEM |
135,000.000 KWH |
162,960.000 KWH |
| PINES MIDDLE |
206,968.000 KWH |
196,168.000 KWH |
| PINEWOOD ELEM |
162,240.000 KWH |
161,640.000 KWH |
| PIONEER MIDDLE |
176,542.000 KWH |
187,499.000 KWH |
| PIONEER MIDDLE ANNEX |
33,480.000 KWH |
34,140.000 KWH |
| PIPER HIGH |
480,294.000 KWH |
505,654.000 KWH |
| PLANTATION ELEM |
141,704.000 KWH |
143,866.000 KWH |
| PLANTATION HIGH |
381,368.000 KWH |
337,389.000 KWH |
| PLANTATION MIDDLE |
204,106.000 KWH |
134,555.000 KWH |
| PLANTATION PARK ELEM |
80,705.000 KWH |
78,932.000 KWH |
| POMPANO BEACH ELEM |
130,800.000 KWH |
125,760.000 KWH |
| POMPANO BEACH HIGH |
368,755.000 KWH |
333,801.000 KWH |
| POMPANO BEACH MIDDLE |
289,488.000 KWH |
286,968.000 KWH |
| PORTABLE AT PINES |
103,459.000 KWH |
111,254.000 KWH |
| PPO ZONE 2 - LEASED |
23,135.000 KWH |
26,287.000 KWH |
| QUIET WATERS ELEM |
179,820.000 KWH |
215,640.000 KWH |
| RAMBLEWOOD ELEM |
130,320.000 KWH |
98,400.000 KWH |
| RAMBLEWOOD MIDDLE |
285,840.000 KWH |
223,264.000 KWH |
| RICKARDS MIDDLE |
182,793.000 KWH |
189,325.000 KWH |
| RIVERGLADES ELEM |
118,440.000 KWH |
105,360.000 KWH |
| RIVERLAND ELEM |
94,200.000 KWH |
88,200.000 KWH |
| RIVERSIDE ELEM |
169,320.000 KWH |
158,640.000 KWH |
| ROCK ISLAND ADMIN |
97,992.000 KWH |
88,032.000 KWH |
| ROYAL PALM ELEMENTARY |
184,466.000 KWH |
181,743.000 KWH |
| SANDERS PARK ELEM |
120,000.000 KWH |
109,600.000 KWH |
| SANDPIPER ELEM |
163,200.000 KWH |
176,640.000 KWH |
| SAWGRASS ELEM |
131,280.000 KWH |
124,560.000 KWH |
| SAWGRASS SPRINGS MIDDLE |
241,200.000 KWH |
237,000.000 KWH |
| SEA CASTLE ELEM |
168,480.000 KWH |
129,360.000 KWH |
| SEAGULL SCHOOL |
127,511.000 KWH |
110,257.000 KWH |
| SEMINOLE MIDDLE |
273,120.000 KWH |
264,840.000 KWH |
| SHERIDAN HILLS ELEM |
95,766.000 KWH |
85,094.000 KWH |
| SHERIDAN PARK ELEM |
155,040.000 KWH |
108,720.000 KWH |
| SHERIDAN VOCATIONAL |
402,240.000 KWH |
343,920.000 KWH |
| SILVER LAKES ELEMENTARY |
122,880.000 KWH |
113,880.000 KWH |
| SILVER LAKES MIDDLE |
161,880.000 KWH |
164,520.000 KWH |
| SILVER PALMS ELEM |
156,120.000 KWH |
171,240.000 KWH |
| SILVER RIDGE ELEM |
191,040.000 KWH |
194,160.000 KWH |
| SILVER SHORES ELEMENTARY |
140,040.000 KWH |
129,360.000 KWH |
| SILVER TRAIL MIDDLE |
255,600.000 KWH |
228,480.000 KWH |
| SOUTH AREA BUS PARKING |
40,466.000 KWH |
41,461.000 KWH |
| SOUTH AREA MAINTENANCE |
24,045.000 KWH |
24,890.000 KWH |
| SOUTH BROWARD HIGH |
517,094.000 KWH |
474,802.000 KWH |
| SOUTH PLANTATION HIGH |
438,134.000 KWH |
364,682.000 KWH |
| Southwest Area Bus Complex |
40,485.000 KWH |
43,305.000 KWH |
| STEPHEN FOSTER ELEM |
202,285.000 KWH |
151,882.000 KWH |
| STIRLING ELEM |
128,160.000 KWH |
119,040.000 KWH |
| STONEMAN DOUGLAS HIGH |
494,800.000 KWH |
463,200.000 KWH |
| STRANAHAN HIGH |
485,761.000 KWH |
382,930.000 KWH |
| SUNLAND PARK ELEM |
99,360.000 KWH |
71,520.000 KWH |
| SUNRISE MIDDLE |
295,933.000 KWH |
248,412.000 KWH |
| SUNSET LAKES ELEMENTARY |
122,280.000 KWH |
139,080.000 KWH |
| SUNSET SCHOOL |
140,352.000 KWH |
128,832.000 KWH |
| SUNSHINE ELEMENTARY |
136,024.000 KWH |
136,512.000 KWH |
| TAMARAC ELEM |
164,640.000 KWH |
152,160.000 KWH |
| TARAVELLA HIGH |
488,867.000 KWH |
457,237.000 KWH |
| TECHNOLOGY AND SUPPORT SERVICE |
390,000.000 KWH |
364,320.000 KWH |
| TEDDER ELEMENTARY SCHOOL |
175,150.000 KWH |
179,653.000 KWH |
| TEQUESTA TRACE MIDDLE |
210,600.000 KWH |
189,840.000 KWH |
| THE QUEST CENTER |
111,840.000 KWH |
92,040.000 KWH |
| THURGOOD MARSHALL ELEM |
99,504.000 KWH |
92,544.000 KWH |
| TRADEWINDS ELEM |
214,560.000 KWH |
184,560.000 KWH |
| Transportation Services Annex |
13,320.000 KWH |
11,760.000 KWH |
| TROPICAL ELEM |
153,665.000 KWH |
137,758.000 KWH |
| TWIN LAKES ADMIN |
67,200.000 KWH |
75,840.000 KWH |
| TWIN LAKES ANNEX/NEW WHSE |
3,555.000 KWH |
2,364.000 KWH |
| TWIN LAKES COMPLEX |
121,222.000 KWH |
122,273.000 KWH |
| VEHICLE MAINTENANCE |
99,120.000 KWH |
87,600.000 KWH |
| VILLAGE ELEM |
182,700.000 KWH |
143,940.000 KWH |
| VIRGINIA YOUNG ELEM |
106,680.000 KWH |
107,280.000 KWH |
| WALKER ELEM |
195,746.000 KWH |
188,903.000 KWH |
| WALTER C YOUNG MIDDLE |
492,166.000 KWH |
411,171.000 KWH |
| WATKINS ELEM |
186,480.000 KWH |
189,600.000 KWH |
| WELLEBY ELEM |
108,000.000 KWH |
107,880.000 KWH |
| WEST BROWARD HIG/LLL |
396,800.000 KWH |
442,400.000 KWH |
| WEST CENTRAL BUS COMPLEX |
67,158.000 KWH |
62,911.000 KWH |
| WEST HOLLYWOOD ELEM |
99,120.000 KWH |
84,960.000 KWH |
| WESTCHESTER ELEMENTARY |
132,551.000 KWH |
176,212.000 KWH |
| WESTERN HIGH |
479,732.000 KWH |
553,164.000 KWH |
| WESTGLADES MIDDLE |
268,080.000 KWH |
283,920.000 KWH |
| WESTPINE MIDDLE |
159,480.000 KWH |
169,320.000 KWH |
| WESTWOOD HEIGHTS ELEM |
171,564.000 KWH |
109,926.000 KWH |
| WHIDDON-ROGERS ED CENTER |
148,400.000 KWH |
152,400.000 KWH |
| WHISPERING PINES |
91,560.000 KWH |
100,200.000 KWH |
| WILLIAM DANDY MIDDLE |
185,880.000 KWH |
169,080.000 KWH |
| WILTON MANORS ELEM |
161,520.000 KWH |
146,700.000 KWH |
| WINGATE OAKS CTR |
122,520.000 KWH |
98,760.000 KWH |
| WINSTON PARK ELEM |
168,240.000 KWH |
134,400.000 KWH |
|