Utility Savings
Building Name
Dec-07
Dec-08
APOLLO MIDDLE 220,560.000 KWH 229,440.000 KWH
ARTHUR ASHE MIDDLE 348,800.000 KWH 304,800.000 KWH
ATLANTIC VOC CENTER 597,342.000 KWH 455,967.000 KWH
ATLANTIC WEST ELEM 172,920.000 KWH 130,800.000 KWH
ATTUCKS MIDDLE 211,277.000 KWH 216,240.000 KWH
BAIR MIDDLE 167,520.000 KWH 168,240.000 KWH
BANYAN ELEM 134,880.000 KWH 128,280.000 KWH
BAYVIEW ELEM 89,280.000 KWH 71,880.000 KWH
BECON 277,720.000 KWH 242,000.000 KWH
BENNETT ELEM 84,960.000 KWH 93,120.000 KWH
BETHUNE ELEM 164,880.000 KWH 173,280.000 KWH
BOULEVARD HEIGHTS ELEM 106,920.000 KWH 125,520.000 KWH
BOYD ANDERSON HIGH 411,923.000 KWH 369,878.000 KWH
BRIGHT HORIZONS CTR 102,720.000 KWH 142,080.000 KWH
BROADVIEW ELEM 114,844.000 KWH 98,227.000 KWH
BROWARD EDUCATION FOUNDATION 1,635.000 KWH .000 KWH
BROWARD ESTATES ELEM 68,520.000 KWH 122,485.000 KWH
BROWARD FIRE ACADEMY 28,920.000 KWH 29,702.000 KWH
CASTLE HILL ELEM 125,760.000 KWH 142,920.000 KWH
CENTRAL PARK ELEM 25,440.000 KWH .000 KWH
CHALLENGER ELEMENTARY 167,280.000 KWH 142,440.000 KWH
CHAPEL TRAIL ELEM 183,480.000 KWH 164,400.000 KWH
CHARLES DREW ELEM 192,768.000 KWH 174,138.000 KWH
COCONUT CREEK ELEM 122,400.000 KWH 114,960.000 KWH
COCONUT CREEK HIGH 118,744.000 KWH 101,550.000 KWH
COCONUT PALM ELEMENTARY 475,067.000 KWH 364,424.000 KWH
COLBERT ELEM 156,960.000 KWH 138,600.000 KWH
COLLINS ELEM 145,440.000 KWH 133,440.000 KWH
COOPER CITY COMM 71,520.000 KWH 72,960.000 KWH
COOPER CITY ELEM .000 KWH 9,756.000 KWH
COOPER CITY HIGH 6,838.000 KWH 5,259.000 KWH
CORAL COVE ELEMENTARY 123,840.000 KWH 119,520.000 KWH
CORAL GLADES HIGH 632,301.000 KWH 532,465.000 KWH
CORAL PARK ELEM 145,680.000 KWH 110,640.000 KWH
CORAL SPRINGS ELEM 435,120.000 KWH 355,920.000 KWH
CORAL SPRINGS COMMUNITY 110,040.000 KWH 120,240.000 KWH
CORAL SPRINGS HIGH 132,000.000 KWH 119,520.000 KWH
CORAL SPRINGS MIDDLE 449,908.000 KWH 433,657.000 KWH
COUNTRY HILLS ELEM 231,640.000 KWH 223,240.000 KWH
COUNTRY ISLES ELEM 179,880.000 KWH 138,480.000 KWH
CRESTHAVEN ELEM 176,880.000 KWH 168,720.000 KWH
CROISSANT PARK ELEM 106,080.000 KWH 98,400.000 KWH
CROSS CREEK 128,166.000 KWH 115,589.000 KWH
CRYSTAL LAKE COMM SCHOOL 86,820.000 KWH 78,120.000 KWH
CRYSTAL LAKE MIDDLE 7,791.000 KWH 4,994.000 KWH
CYPRESS BAY HIGH 185,023.000 KWH 171,755.000 KWH
CYPRESS BAY HIGH ANNEX 584,800.000 KWH 508,400.000 KWH
CYPRESS ELEM 194,064.000 KWH 55,680.000 KWH
CYPRESS RUN ALTERNATIVE 102,240.000 KWH 87,840.000 KWH
DANIA ELEM 55,421.000 KWH 69,054.000 KWH
DAVE THOMAS ED CENTER (WEST) 99,412.000 KWH 129,323.000 KWH
DAVE THOMAS EDUCATION CENTER 119,280.000 KWH 97,200.000 KWH
DAVIE ELEM 41,821.000 KWH 35,846.000 KWH
DEERFIELD BEACH ELEM 136,297.000 KWH 142,937.000 KWH
DEERFIELD BEACH HIGH 151,177.000 KWH 131,523.000 KWH
DEERFIELD BEACH MID 393,919.000 KWH 381,528.000 KWH
DEERFIELD PARK ELEM 226,355.000 KWH 200,278.000 KWH
DILLARD ELEM 117,360.000 KWH 101,640.000 KWH
DILLARD HIGH COMM 145,560.000 KWH 137,520.000 KWH
DILLARD HIGH SCHOOL 5,060.000 KWH .000 KWH
DOLPHIN BAY ELEMENTARY 807,011.000 KWH 739,100.000 KWH
DREW RESOURCE CTR 112,320.000 KWH 113,280.000 KWH
DRIFTWOOD ELEM 92,419.000 KWH 58,698.000 KWH
DRIFTWOOD MIDDLE 115,264.000 KWH 85,909.000 KWH
EAGLE POINT ELEM 377,968.000 KWH 355,685.000 KWH
EAGLE RIDGE ELEM 215,400.000 KWH 200,400.000 KWH
ECIA SPECIAL PROGRAMS 167,040.000 KWH 147,000.000 KWH
EDGEWOOD CENTER 18,804.000 KWH 19,140.000 KWH
ELY HIGH 47,056.000 KWH 44,776.000 KWH
EMBASSY CREEK ELEM 704,093.000 KWH 663,823.000 KWH
ENDEAVOR LEARNING CENTER 102,360.000 KWH 115,320.000 KWH
EVERGLADES 9TH GRADE ANNEX 100,440.000 KWH 93,240.000 KWH
EVERGLADES ELEMENTARY 139,148.000 KWH 57,752.000 KWH
EVERGLADES HIGH 204,940.000 KWH 186,076.000 KWH
FAIRWAY ELEM 654,720.000 KWH 582,840.000 KWH
FALCON COVE MIDDLE 223,800.000 KWH 184,200.000 KWH
FLAMINGO ELEM 432,912.000 KWH 264,518.000 KWH
FLANAGAN HIGH 139,048.000 KWH 120,568.000 KWH
FLORANADA ELEM 568,530.000 KWH 499,029.000 KWH
FOREST GLEN MIDDLE 131,376.000 KWH 110,256.000 KWH
FOREST HILLS ELEM 265,981.000 KWH 194,085.000 KWH
FORT LAUDERDALE HIGH 129,240.000 KWH 101,760.000 KWH
FORT LAUDERDALE HIGH ANNEX 565,362.000 KWH 520,975.000 KWH
FOX TRAIL ELEMENTARY 160,560.000 KWH 148,080.000 KWH
GATOR RUN ELEMENTARY 225,960.000 KWH 165,960.000 KWH
GLADES MIDDLE 311,600.000 KWH 304,800.000 KWH
GRIFFIN ELEM 118,440.000 KWH 91,200.000 KWH
GULFSTREAM MIDDLE SCHOOL 90,840.000 KWH 72,360.000 KWH
HALLANDALE ADULT CENTER 165,802.000 KWH 154,382.000 KWH
HALLANDALE ELEM 172,320.000 KWH 119,760.000 KWH
HALLANDALE HIGH 261,882.000 KWH 264,044.000 KWH
HARBORDALE ELEM 87,576.000 KWH 62,328.000 KWH
HAWKES BLUFF ELEM 156,724.000 KWH 137,766.000 KWH
HOLLYWOOD CENTRAL AUDITORIUM 40,080.000 KWH 37,860.000 KWH
HOLLYWOOD CENTRAL ELEM 91,320.000 KWH 81,960.000 KWH
HOLLYWOOD HILLS COMMUNITY 2,396.000 KWH 1,830.000 KWH
HOLLYWOOD HILLS ELEMENTARY 46,320.000 KWH 134,400.000 KWH
HOLLYWOOD HILLS HIGH 338,195.000 KWH 293,389.000 KWH
HOLLYWOOD PARK ELEM 111,840.000 KWH 82,560.000 KWH
HORIZON ELEM 99,000.000 KWH 105,240.000 KWH
HORTT ADMIN SITE 63,455.000 KWH 49,313.000 KWH
INDIAN RIDGE MIDDLE 323,529.000 KWH 286,039.000 KWH
INDIAN TRACE ELEM 119,760.000 KWH 111,480.000 KWH
JAMES HUNT ELEMENTARY 151,920.000 KWH 101,040.000 KWH
KATHLEEN WRIGHT ADMIN 468,762.000 KWH 418,397.000 KWH
LAKE FOREST ELEM 171,648.000 KWH 146,640.000 KWH
LAKESIDE ELEMENTARY 138,000.000 KWH 120,240.000 KWH
LANIER JAMES CENTER 57,840.000 KWH 48,960.000 KWH
LARKDALE ELEM 97,995.000 KWH 130,514.000 KWH
LAUDERDALE LAKES MIDDLE 140,520.000 KWH 167,640.000 KWH
LAUDERDALE MANORS ELEM 244,680.000 KWH 205,920.000 KWH
LAUDERHILL MIDDLE 142,920.000 KWH 130,080.000 KWH
LAUDERHILL MIDDLE/COMM 3,055.000 KWH 2,694.000 KWH
LAUDERHILL PT ELEM 136,680.000 KWH 127,440.000 KWH
LIBERTY ELEMENTARY 156,240.000 KWH 146,880.000 KWH
LLOYD ESTATES ELEM 86,400.000 KWH 85,440.000 KWH
LOCKHART STADIUM 56,955.000 KWH 61,982.000 KWH
LYONS CREEK MIDDLE 344,640.000 KWH 300,240.000 KWH
MANATEE BAY ELEMENTARY 175,791.000 KWH 146,397.000 KWH
MAPLEWOOD ELEM 141,000.000 KWH 138,840.000 KWH
MARGATE ELEM 168,660.000 KWH 158,640.000 KWH
MARGATE MIDDLE 266,897.000 KWH 182,734.000 KWH
MARKHAM ELEM 115,004.000 KWH 114,923.000 KWH
MARTIN LUTHER KING ELEM 133,674.000 KWH 118,008.000 KWH
MCARTHUR HIGH 472,304.000 KWH 462,074.000 KWH
MCFATTER VO TECH 401,280.000 KWH 315,360.000 KWH
MCNAB ELEMENTARY 159,840.000 KWH 114,371.000 KWH
MCNICOL MIDDLE 292,560.000 KWH 290,160.000 KWH
MEADOWBROOK ELEM 89,522.000 KWH 138,421.000 KWH
MILLENNIUM MIDDLE 304,320.000 KWH 293,280.000 KWH
MIRAMAR ELEM 126,000.000 KWH 122,040.000 KWH
MIRAMAR HIGH 520,235.000 KWH 471,236.000 KWH
MIRROR LAKE ELEM 94,800.000 KWH 84,000.000 KWH
MONARCH HIGH 400,800.000 KWH 341,200.000 KWH
MORROW ELEM 135,600.000 KWH 125,160.000 KWH
MULTICULTURAL CENTER 22,200.000 KWH 9,720.000 KWH
N ANDREWS GARDENS ELEM 177,504.000 KWH 159,864.000 KWH
NEW RENAISSANCE MIDDLE 230,993.000 KWH 225,959.000 KWH
NEW RIVER MIDDLE SCHOOL 139,824.000 KWH 47,844.000 KWH
NOB HILL ELEM 271,800.000 KWH 237,240.000 KWH
NORCREST ELEM 117,600.000 KWH 107,640.000 KWH
NORTH AREA MAINT/WHSE 117,726.000 KWH 210,894.000 KWH
NORTH AREA SUPERINTENDENT 36,240.000 KWH 34,980.000 KWH
NORTH BUS PARKING LOT 6,427.000 KWH 8,590.000 KWH
NORTH CENTRAL SUPERINTENDENT 76,323.000 KWH 69,422.000 KWH
NORTH FORK ELEM 100,740.000 KWH 94,320.000 KWH
NORTH LAUDERDALE ELEM 175,560.000 KWH 106,320.000 KWH
NORTH SIDE ELEMENTARY 117,120.000 KWH 97,440.000 KWH
NORTH WEST TRANSPORTATION 144,600.000 KWH 106,320.000 KWH
NORTHEAST HIGH 407,797.000 KWH 362,653.000 KWH
NOVA BLANCHE FORMAN/EISENHOWER ELEM 275,600.000 KWH 222,800.000 KWH
NOVA EISENHOWER ELEMENTARY 11,351.000 KWH 8,436.000 KWH
NOVA HIGH 6,581.000 KWH 27,558.000 KWH
NOVA HIGH - MECH PLANT 688,000.000 KWH 758,400.000 KWH
NOVA HIGH COMM/GED 43.000 KWH .000 KWH
OAKLAND PARK ELEM 132,720.000 KWH 122,280.000 KWH
OAKRIDGE ELEM 122,352.000 KWH 114,758.000 KWH
OLSEN MIDDLE 161,880.000 KWH 165,480.000 KWH
OLSEN MIDDLE ANNEX 85,640.000 KWH 102,680.000 KWH
ORANGEBROOK ELEM 124,560.000 KWH 103,920.000 KWH
ORIOLE ELEM 84,480.000 KWH 84,480.000 KWH
PALM COVE ELEM 159,360.000 KWH 147,600.000 KWH
PALMVIEW ELEM 108,960.000 KWH 129,360.000 KWH
PANTHER RUN ELEM 133,440.000 KWH 103,440.000 KWH
PARK LAKES ELEMENTARY 210,240.000 KWH 151,680.000 KWH
PARK LAKES ELEMENTARY ANNEX 31,824.000 KWH 20,488.000 KWH
PARK RIDGE ELEM 81,480.000 KWH 84,000.000 KWH
PARK SPRINGS ELEM 148,320.000 KWH 136,800.000 KWH
PARK TRAILS ELEMENTARY 164,160.000 KWH 161,040.000 KWH
PARKSIDE ELEMENTARY 157,440.000 KWH 132,960.000 KWH
PARKWAY MIDDLE 391,777.000 KWH 342,720.000 KWH
PASADENA LAKES ELEM 197,065.000 KWH 163,050.000 KWH
PEMBROKE LAKES ELEM 119,220.000 KWH 90,480.000 KWH
PEMBROKE PINES ELEM 89,790.000 KWH 92,144.000 KWH
PERRY ELEM 123,368.000 KWH 122,255.000 KWH
PERRY MIDDLE 210,720.000 KWH 164,400.000 KWH
PETERS ELEM 143,670.000 KWH 152,294.000 KWH
PHYSICAL PLANT OPERATIONS 103,440.000 KWH 93,960.000 KWH
PINE RIDGE CTR 78,480.000 KWH 68,400.000 KWH
PINES LAKES ELEM 154,200.000 KWH 152,400.000 KWH
PINES MIDDLE 312,485.000 KWH 247,288.000 KWH
PINEWOOD ELEM 113,400.000 KWH 120,240.000 KWH
PIONEER MIDDLE 211,025.000 KWH 194,112.000 KWH
PIONEER MIDDLE ANNEX 39,480.000 KWH 34,200.000 KWH
PIPER HIGH 431,854.000 KWH 454,431.000 KWH
PLANTATION ELEM 125,230.000 KWH 124,952.000 KWH
PLANTATION HIGH 451,380.000 KWH 383,430.000 KWH
PLANTATION MIDDLE 220,606.000 KWH 187,945.000 KWH
PLANTATION PARK ELEM 90,165.000 KWH 79,976.000 KWH
POMPANO BEACH ELEM 114,360.000 KWH 178,200.000 KWH
POMPANO BEACH HIGH 355,881.000 KWH 324,784.000 KWH
POMPANO BEACH MIDDLE 221,256.000 KWH 210,888.000 KWH
PPO ZONE 2 - LEASED 28,543.000 KWH 25,771.000 KWH
QUIET WATERS ELEM 147,360.000 KWH 16,740.000 KWH
RAMBLEWOOD ELEM 145,680.000 KWH 121,920.000 KWH
RAMBLEWOOD MIDDLE 294,480.000 KWH 234,071.000 KWH
RICKARDS MIDDLE 212,473.000 KWH 192,338.000 KWH
RIVERGLADES ELEM 107,400.000 KWH 104,160.000 KWH
RIVERLAND ELEM 119,880.000 KWH 106,080.000 KWH
RIVERSIDE ELEM 139,800.000 KWH 134,400.000 KWH
ROCK ISLAND ADMIN 87,072.000 KWH 76,512.000 KWH
ROYAL PALM ELEMENTARY 161,465.000 KWH 150,658.000 KWH
SAFETY DEPARTMENT 86,000.000 KWH 84,800.000 KWH
SANDERS PARK ELEM 162,600.000 KWH 141,479.000 KWH
SANDPIPER ELEM 160,560.000 KWH 151,920.000 KWH
SAWGRASS ELEM 251,160.000 KWH 210,840.000 KWH
SAWGRASS SPRINGS MIDDLE 164,640.000 KWH 166,800.000 KWH
SEA CASTLE ELEM 115,710.000 KWH 88,553.000 KWH
SEAGULL SCHOOL 202,680.000 KWH 178,080.000 KWH
SEMINOLE MIDDLE 91,307.000 KWH 84,512.000 KWH
SHERIDAN HILLS ELEM 140,880.000 KWH 115,680.000 KWH
SHERIDAN PARK ELEM 335,520.000 KWH 272,880.000 KWH
SHERIDAN VOCATIONAL 139,560.000 KWH 106,680.000 KWH
SILVER LAKES ELEMENTARY 247,560.000 KWH 167,040.000 KWH
SILVER LAKES MIDDLE 153,480.000 KWH 135,960.000 KWH
SILVER PALMS ELEM 207,120.000 KWH 173,040.000 KWH
SILVER RIDGE ELEM 138,120.000 KWH 136,920.000 KWH
SILVER SHORES ELEMENTARY 252,000.000 KWH 235,200.000 KWH
SILVER TRAIL MIDDLE 36,862.000 KWH 33,105.000 KWH
SOUTH AREA BUS PARKING 18,513.000 KWH 15,876.000 KWH
SOUTH AREA MAINTENANCE 446,565.000 KWH 378,803.000 KWH
SOUTH BROWARD HIGH 528,243.000 KWH 432,507.000 KWH
SOUTH PLANTATION HIGH 777.000 KWH 25,988.000 KWH
SOUTH WEST BUS LOT 127,825.000 KWH 124,948.000 KWH
STEPHEN FOSTER ELEM 88,440.000 KWH 84,000.000 KWH
STIRLING ELEM 482,800.000 KWH 450,400.000 KWH
STONEMAN DOUGLAS HIGH 439,678.000 KWH 373,159.000 KWH
STRANAHAN HIGH 125,400.000 KWH 104,640.000 KWH
SUNLAND PARK ELEM 267,501.000 KWH 195,563.000 KWH
SUNRISE MIDDLE 154,680.000 KWH 123,000.000 KWH
SUNSET LAKES ELEMENTARY 179,592.000 KWH 97,512.000 KWH
SUNSET SCHOOL 122,557.000 KWH 136,411.000 KWH
SUNSHINE ELEMENTARY 178,320.000 KWH 155,280.000 KWH
TAMARAC ELEM 471,337.000 KWH 430,612.000 KWH
TARAVELLA HIGH 374,400.000 KWH 354,720.000 KWH
TECHNOLOGY AND SUPPORT SERVICE 130,870.000 KWH 131,021.000 KWH
TEDDER ELEMENTARY SCHOOL 249,840.000 KWH 228,000.000 KWH
TEQUESTA TRACE MIDDLE 101,280.000 KWH 95,880.000 KWH
THE QUEST CENTER 130,584.000 KWH 117,144.000 KWH
THURGOOD MARSHALL ELEM 229,560.000 KWH 155,880.000 KWH
TRADEWINDS ELEM .000 KWH 5,280.000 KWH
TRANSPORTATION SERVICE ANNEX 93,443.000 KWH 107,192.000 KWH
TROPICAL ELEM 62,880.000 KWH 60,480.000 KWH
TWIN LAKES ANNEX/NEW WHSE 3,101.000 KWH 3,030.000 KWH
TWIN LAKES COMPLEX 110,081.000 KWH 112,884.000 KWH
VEHICLE MAINTENANCE 86,160.000 KWH 83,760.000 KWH
VILLAGE ELEM 182,040.000 KWH 188,400.000 KWH
VIRGINIA YOUNG ELEM 125,880.000 KWH 86,760.000 KWH
WALKER ELEM 269,977.000 KWH 183,605.000 KWH
WALTER C YOUNG MIDDLE 451,290.000 KWH 433,658.000 KWH
WATKINS ELEM 132,120.000 KWH 111,960.000 KWH
WELLEBY ELEM 109,560.000 KWH 106,200.000 KWH
WEST BROWARD HIG/LLL .000 KWH 410,400.000 KWH
WEST CENTRAL BUS COMPLEX 65,229.000 KWH 78,458.000 KWH
WEST HOLLYWOOD ELEM 127,800.000 KWH 136,320.000 KWH
WESTCHESTER ELEMENTARY 145,143.000 KWH 140,099.000 KWH
WESTERN HIGH 470,486.000 KWH 391,315.000 KWH
WESTGLADES MIDDLE 269,760.000 KWH 287,520.000 KWH
WESTPINE MIDDLE 166,320.000 KWH 147,720.000 KWH
WESTWOOD HEIGHTS ELEM 161,968.000 KWH 145,901.000 KWH
WHIDDON-ROGERS ED CENTER 152,000.000 KWH 135,600.000 KWH
WHISPERING PINES 69,000.000 KWH 74,400.000 KWH
WILLIAM DANDY MIDDLE 242,040.000 KWH 184,200.000 KWH
WILTON MANORS ELEM 173,220.000 KWH 122,220.000 KWH
WINGATE OAKS CTR 88,440.000 KWH 102,360.000 KWH
WINSTON PARK ELEM 192,000.000 KWH 153,840.000 KWH