Building |
Dec-08 |
Dec-09 |
| APOLLO MIDDLE |
229,440.000 KWH |
239,520.000 KWH |
| ARTHUR ASHE MIDDLE |
304,800.000 KWH |
304,800.000 KWH |
| ATLANTIC VOC CENTER |
455,967.000 KWH |
516,965.000 KWH |
| ATLANTIC WEST ELEM |
130,800.000 KWH |
128,880.000 KWH |
| ATTUCKS MIDDLE |
216,240.000 KWH |
211,677.000 KWH |
| BAIR MIDDLE |
168,240.000 KWH |
157,920.000 KWH |
| BANYAN ELEM |
128,280.000 KWH |
126,000.000 KWH |
| BAYVIEW ELEM |
71,880.000 KWH |
65,400.000 KWH |
| BECON |
242,000.000 KWH |
184,320.000 KWH |
| BENNETT ELEM |
93,120.000 KWH |
81,120.000 KWH |
| BETHUNE ELEM |
173,280.000 KWH |
147,720.000 KWH |
| BOULEVARD HEIGHTS ELEM |
125,520.000 KWH |
128,640.000 KWH |
| BOYD ANDERSON HIGH |
369,878.000 KWH |
407,524.000 KWH |
| BRIGHT HORIZONS CTR |
142,080.000 KWH |
79,440.000 KWH |
| BROADVIEW ELEM |
98,227.000 KWH |
99,348.000 KWH |
| BROWARD ESTATES ELEM |
122,485.000 KWH |
130,633.000 KWH |
| BROWARD FIRE ACADEMY |
29,702.000 KWH |
37,587.000 KWH |
| CASTLE HILL ELEM |
142,920.000 KWH |
107,520.000 KWH |
| CENTRAL PARK ELEM |
142,440.000 KWH |
198,720.000 KWH |
| CHALLENGER ELEMENTARY |
164,400.000 KWH |
147,960.000 KWH |
| CHAPEL TRAIL ELEM |
174,138.000 KWH |
141,875.000 KWH |
| CHARLES DREW ELEM |
114,960.000 KWH |
131,400.000 KWH |
| COCONUT CREEK ELEM |
101,550.000 KWH |
100,465.000 KWH |
| COCONUT CREEK HIGH |
364,424.000 KWH |
382,166.000 KWH |
| COCONUT PALM ELEMENTARY |
138,600.000 KWH |
135,720.000 KWH |
| COLBERT ELEM |
133,440.000 KWH |
110,880.000 KWH |
| COLLINS ELEM |
72,960.000 KWH |
70,800.000 KWH |
| COMMUNITY SCHOOL NORTH |
21,120.000 KWH |
20,520.000 KWH |
| COMMUNITY SCHOOL SOUTH |
9,756.000 KWH |
9,984.000 KWH |
| COOPER CITY COMM |
5,259.000 KWH |
427.000 KWH |
| COOPER CITY ELEM |
119,520.000 KWH |
119,760.000 KWH |
| COOPER CITY HIGH |
532,465.000 KWH |
586,873.000 KWH |
| CORAL COVE ELEMENTARY |
110,640.000 KWH |
125,280.000 KWH |
| CORAL GLADES HIGH |
355,920.000 KWH |
345,360.000 KWH |
| CORAL PARK ELEM |
120,240.000 KWH |
111,720.000 KWH |
| CORAL SPRINGS ELEM |
119,520.000 KWH |
108,480.000 KWH |
| CORAL SPRINGS HIGH |
433,657.000 KWH |
481,471.000 KWH |
| CORAL SPRINGS MIDDLE |
223,240.000 KWH |
188,840.000 KWH |
| COUNTRY HILLS ELEM |
138,480.000 KWH |
158,640.000 KWH |
| COUNTRY ISLES ELEM |
168,720.000 KWH |
149,760.000 KWH |
| CRESTHAVEN ELEM |
98,400.000 KWH |
82,800.000 KWH |
| CROISSANT PARK ELEM |
115,589.000 KWH |
122,016.000 KWH |
| CROSS CREEK |
78,120.000 KWH |
86,340.000 KWH |
| CRYSTAL LAKE COMM SCHOOL |
4,994.000 KWH |
5,230.000 KWH |
| CRYSTAL LAKE MIDDLE |
171,755.000 KWH |
172,441.000 KWH |
| CYPRESS BAY HIGH |
508,400.000 KWH |
549,200.000 KWH |
| CYPRESS BAY HIGH ANNEX |
55,680.000 KWH |
53,280.000 KWH |
| CYPRESS ELEM |
87,840.000 KWH |
80,640.000 KWH |
| CYPRESS RUN ALTERNATIVE |
69,054.000 KWH |
74,358.000 KWH |
| DANIA ELEM |
129,323.000 KWH |
105,157.000 KWH |
| DAVE THOMAS ED CENTER (WEST) |
97,200.000 KWH |
98,160.000 KWH |
| DAVE THOMAS EDUCATION CENTER |
35,846.000 KWH |
33,459.000 KWH |
| DAVIE ELEM |
142,937.000 KWH |
120,238.000 KWH |
| DEERFIELD BEACH ELEM |
131,523.000 KWH |
135,634.000 KWH |
| DEERFIELD BEACH HIGH |
381,528.000 KWH |
358,068.000 KWH |
| DEERFIELD BEACH MID |
200,278.000 KWH |
276,622.000 KWH |
| DEERFIELD PARK ELEM |
101,640.000 KWH |
82,320.000 KWH |
| DILLARD ELEM |
137,520.000 KWH |
148,560.000 KWH |
| DILLARD HIGH SCHOOL |
739,100.000 KWH |
743,835.000 KWH |
| DISCOVERY ELEMENTARY |
.000 KWH |
140,880.000 KWH |
| DOLPHIN BAY ELEMENTARY |
113,280.000 KWH |
98,880.000 KWH |
| DREW RESOURCE CTR |
58,698.000 KWH |
74,514.000 KWH |
| DRIFTWOOD ELEM |
85,909.000 KWH |
106,616.000 KWH |
| DRIFTWOOD MIDDLE |
355,685.000 KWH |
355,499.000 KWH |
| EAGLE POINT ELEM |
200,400.000 KWH |
172,200.000 KWH |
| EAGLE RIDGE ELEM |
147,000.000 KWH |
155,520.000 KWH |
| ECIA SPECIAL PROGRAMS |
19,140.000 KWH |
32,556.000 KWH |
| EDGEWOOD CENTER |
44,776.000 KWH |
46,216.000 KWH |
| ELY HIGH |
662,496.000 KWH |
593,936.000 KWH |
| EMBASSY CREEK ELEM |
115,320.000 KWH |
119,160.000 KWH |
| ENDEAVOR LEARNING CENTER |
93,240.000 KWH |
89,280.000 KWH |
| EVERGLADES ELEMENTARY |
186,076.000 KWH |
150,470.000 KWH |
| EVERGLADES HIGH |
582,840.000 KWH |
482,640.000 KWH |
| FAIRWAY ELEM |
184,200.000 KWH |
112,320.000 KWH |
| FALCON COVE MIDDLE |
264,518.000 KWH |
318,287.000 KWH |
| FLAMINGO ELEM |
120,568.000 KWH |
120,928.000 KWH |
| FLANAGAN HIGH |
499,029.000 KWH |
480,011.000 KWH |
| FLORANADA ELEM |
110,256.000 KWH |
97,536.000 KWH |
| FOREST GLEN MIDDLE |
194,085.000 KWH |
219,474.000 KWH |
| FOREST HILLS ELEM |
101,760.000 KWH |
117,000.000 KWH |
| FORT LAUDERDALE HIGH |
520,975.000 KWH |
425,202.000 KWH |
| FOX TRAIL ELEMENTARY |
148,080.000 KWH |
166,080.000 KWH |
| GATOR RUN ELEMENTARY |
165,960.000 KWH |
158,400.000 KWH |
| GLADES MIDDLE |
304,800.000 KWH |
278,400.000 KWH |
| GRIFFIN ELEM |
91,200.000 KWH |
90,120.000 KWH |
| GULFSTREAM MIDDLE SCHOOL |
72,360.000 KWH |
73,920.000 KWH |
| HALLANDALE ADULT CENTER |
154,382.000 KWH |
140,614.000 KWH |
| HALLANDALE ELEM |
119,760.000 KWH |
114,480.000 KWH |
| HALLANDALE HIGH |
264,044.000 KWH |
315,678.000 KWH |
| HARBORDALE ELEM |
62,328.000 KWH |
91,848.000 KWH |
| HAWKES BLUFF ELEM |
137,766.000 KWH |
146,163.000 KWH |
| HERON HEIGHTS ELEMENTARY |
.000 KWH |
138,000.000 KWH |
| HOLLYWOOD CENTRAL AUDITORIUM |
37,860.000 KWH |
32,400.000 KWH |
| HOLLYWOOD CENTRAL ELEM |
81,960.000 KWH |
78,960.000 KWH |
| HOLLYWOOD HILLS COMMUNITY |
1,830.000 KWH |
2,767.000 KWH |
| HOLLYWOOD HILLS ELEMENTARY |
134,400.000 KWH |
259,680.000 KWH |
| HOLLYWOOD HILLS HIGH |
293,389.000 KWH |
308,238.000 KWH |
| HOLLYWOOD PARK ELEM |
82,560.000 KWH |
89,760.000 KWH |
| HORIZON ELEM |
105,240.000 KWH |
77,640.000 KWH |
| HORTT ADMIN SITE |
49,313.000 KWH |
49,017.000 KWH |
| INDIAN RIDGE MIDDLE |
286,039.000 KWH |
294,048.000 KWH |
| INDIAN TRACE ELEM |
111,480.000 KWH |
92,280.000 KWH |
| JAMES HUNT ELEMENTARY |
101,040.000 KWH |
112,440.000 KWH |
| KATHLEEN WRIGHT ADMIN |
418,397.000 KWH |
372,073.000 KWH |
| LAKE FOREST ELEM |
146,640.000 KWH |
120,360.000 KWH |
| LAKESIDE ELEMENTARY |
120,240.000 KWH |
121,200.000 KWH |
| LANIER JAMES CENTER |
48,960.000 KWH |
35,040.000 KWH |
| LARKDALE ELEM |
130,514.000 KWH |
122,113.000 KWH |
| LAUDERDALE LAKES MIDDLE |
167,640.000 KWH |
125,795.000 KWH |
| LAUDERDALE MANORS ELEM |
205,920.000 KWH |
241,800.000 KWH |
| LAUDERHILL MIDDLE |
130,080.000 KWH |
125,880.000 KWH |
| LAUDERHILL MIDDLE/COMM |
2,694.000 KWH |
2,778.000 KWH |
| LAUDERHILL PT ELEM |
127,440.000 KWH |
121,680.000 KWH |
| LIBERTY ELEMENTARY |
146,880.000 KWH |
166,320.000 KWH |
| LLOYD ESTATES ELEM |
85,440.000 KWH |
119,760.000 KWH |
| LOCKHART STADIUM |
61,982.000 KWH |
58,796.000 KWH |
| LYONS CREEK MIDDLE |
300,240.000 KWH |
329,280.000 KWH |
| MANATEE BAY ELEMENTARY |
146,397.000 KWH |
172,640.000 KWH |
| MAPLEWOOD ELEM |
138,840.000 KWH |
117,360.000 KWH |
| MARGATE ELEM |
158,640.000 KWH |
169,200.000 KWH |
| MARGATE MIDDLE |
182,734.000 KWH |
215,462.000 KWH |
| MARKHAM ELEM |
114,923.000 KWH |
120,732.000 KWH |
| MARTIN LUTHER KING ELEM |
118,008.000 KWH |
130,684.000 KWH |
| MCARTHUR HIGH |
462,074.000 KWH |
468,936.000 KWH |
| MCFATTER VO TECH |
315,360.000 KWH |
324,000.000 KWH |
| MCNAB ELEMENTARY |
114,371.000 KWH |
107,117.000 KWH |
| MCNICOL MIDDLE |
290,160.000 KWH |
268,800.000 KWH |
| MEADOWBROOK ELEM |
138,421.000 KWH |
98,880.000 KWH |
| MILLENNIUM MIDDLE |
293,280.000 KWH |
310,080.000 KWH |
| MIRAMAR ELEM |
122,040.000 KWH |
95,280.000 KWH |
| MIRAMAR HIGH |
471,236.000 KWH |
436,145.000 KWH |
| MIRROR LAKE ELEM |
84,000.000 KWH |
96,960.000 KWH |
| MONARCH HIGH |
341,200.000 KWH |
370,400.000 KWH |
| MORROW ELEM |
125,160.000 KWH |
126,720.000 KWH |
| MULTICULTURAL CENTER |
9,720.000 KWH |
15,360.000 KWH |
| N ANDREWS GARDENS ELEM |
159,864.000 KWH |
184,464.000 KWH |
| NEW RENAISSANCE MIDDLE |
225,959.000 KWH |
258,823.000 KWH |
| NEW RIVER CIRCLE SITE |
47,844.000 KWH |
49,104.000 KWH |
| NEW RIVER MIDDLE SCHOOL |
237,240.000 KWH |
231,600.000 KWH |
| NOB HILL ELEM |
107,640.000 KWH |
113,760.000 KWH |
| NORCREST ELEM |
210,894.000 KWH |
99,926.000 KWH |
| NORTH AREA MAINT/WHSE |
34,980.000 KWH |
28,320.000 KWH |
| NORTH BUS PARKING LOT |
49,862.000 KWH |
58,631.000 KWH |
| NORTH CENTRAL SUPERINTENDENT |
94,320.000 KWH |
70,140.000 KWH |
| NORTH FORK ELEM |
106,320.000 KWH |
114,360.000 KWH |
| NORTH LAUDERDALE ELEM |
97,440.000 KWH |
105,360.000 KWH |
| NORTH SIDE ELEMENTARY |
106,320.000 KWH |
116,640.000 KWH |
| NORTH WEST TRANSPORTATION |
19,560.000 KWH |
24,480.000 KWH |
| NORTHEAST HIGH |
362,653.000 KWH |
351,617.000 KWH |
| NOVA BLANCHE FORMAN/EISENHOWER ELEM |
222,800.000 KWH |
250,400.000 KWH |
| NOVA CENTER - NOVA MIDDLE |
.000 KWH |
34,140.000 KWH |
| NOVA EISENHOWER ELEMENTARY |
8,436.000 KWH |
7,387.000 KWH |
| NOVA HIGH |
27,558.000 KWH |
35,831.000 KWH |
| NOVA HIGH - MECH PLANT |
758,400.000 KWH |
664,000.000 KWH |
| OAKLAND PARK ELEM |
122,280.000 KWH |
102,240.000 KWH |
| OAKRIDGE ELEM |
114,758.000 KWH |
98,360.000 KWH |
| OFF CAMPUS ALTERNATIVE CENTER |
.000 KWH |
1,643.000 KWH |
| OLSEN MIDDLE |
165,480.000 KWH |
205,200.000 KWH |
| OLSEN MIDDLE ANNEX |
102,680.000 KWH |
112,280.000 KWH |
| ORANGE BROOK ELEM |
103,920.000 KWH |
87,600.000 KWH |
| ORIOLE ELEM |
84,480.000 KWH |
84,960.000 KWH |
| PALM COVE ELEM |
147,600.000 KWH |
143,880.000 KWH |
| PALMVIEW ELEM |
129,360.000 KWH |
85,680.000 KWH |
| PANTHER RUN ELEM |
103,440.000 KWH |
117,720.000 KWH |
| PARK LAKES ELEMENTARY |
151,680.000 KWH |
150,000.000 KWH |
| PARK LAKES ELEMENTARY ANNEX |
20,488.000 KWH |
19,768.000 KWH |
| PARK RIDGE ELEM |
84,000.000 KWH |
71,400.000 KWH |
| PARK SPRINGS ELEM |
136,800.000 KWH |
139,920.000 KWH |
| PARK TRAILS ELEMENTARY |
161,040.000 KWH |
164,880.000 KWH |
| PARKSIDE ELEMENTARY |
132,960.000 KWH |
136,320.000 KWH |
| PARKWAY MIDDLE |
342,720.000 KWH |
282,059.000 KWH |
| PASADENA LAKES ELEM |
163,050.000 KWH |
146,849.000 KWH |
| PEMBROKE LAKES ELEM |
90,480.000 KWH |
102,480.000 KWH |
| PEMBROKE PINES ELEM |
92,144.000 KWH |
92,859.000 KWH |
| PERRY ELEM |
122,255.000 KWH |
138,096.000 KWH |
| PERRY MIDDLE |
164,400.000 KWH |
134,160.000 KWH |
| PETERS ELEM |
152,294.000 KWH |
147,930.000 KWH |
| PHYSICAL PLANT OPERATIONS |
94,289.000 KWH |
91,294.000 KWH |
| PINE RIDGE CTR |
68,400.000 KWH |
66,960.000 KWH |
| PINES LAKES ELEM |
152,400.000 KWH |
171,600.000 KWH |
| PINES MIDDLE |
247,288.000 KWH |
256,168.000 KWH |
| PINEWOOD ELEM |
120,240.000 KWH |
116,640.000 KWH |
| PIONEER MIDDLE |
194,112.000 KWH |
247,670.000 KWH |
| PIONEER MIDDLE ANNEX |
34,200.000 KWH |
26,880.000 KWH |
| PIPER HIGH |
454,431.000 KWH |
455,524.000 KWH |
| PLANTATION ELEM |
124,952.000 KWH |
108,192.000 KWH |
| PLANTATION HIGH |
383,430.000 KWH |
399,023.000 KWH |
| PLANTATION MIDDLE |
187,945.000 KWH |
245,874.000 KWH |
| PLANTATION PARK ELEM |
79,976.000 KWH |
81,000.000 KWH |
| POMPANO BEACH ELEM |
178,200.000 KWH |
111,240.000 KWH |
| POMPANO BEACH HIGH |
333,374.000 KWH |
320,659.000 KWH |
| POMPANO BEACH MIDDLE |
210,888.000 KWH |
207,288.000 KWH |
| PORTABLE AT PINES |
57,752.000 KWH |
67,330.000 KWH |
| PPO ZONE 2 - LEASED |
25,771.000 KWH |
23,942.000 KWH |
| QUIET WATERS ELEM |
16,740.000 KWH |
139,680.000 KWH |
| RAMBLEWOOD ELEM |
121,920.000 KWH |
138,480.000 KWH |
| RAMBLEWOOD MIDDLE |
234,071.000 KWH |
258,612.000 KWH |
| RICKARDS MIDDLE |
192,338.000 KWH |
194,775.000 KWH |
| RIVERGLADES ELEM |
104,160.000 KWH |
97,560.000 KWH |
| RIVERLAND ELEM |
106,080.000 KWH |
126,120.000 KWH |
| RIVERSIDE ELEM |
134,400.000 KWH |
124,560.000 KWH |
| ROCK ISLAND ADMIN |
76,512.000 KWH |
66,312.000 KWH |
| ROYAL PALM ELEMENTARY |
150,658.000 KWH |
179,850.000 KWH |
| SANDERS PARK ELEM |
84,800.000 KWH |
71,600.000 KWH |
| SANDPIPER ELEM |
141,479.000 KWH |
157,320.000 KWH |
| SAWGRASS ELEM |
151,920.000 KWH |
168,720.000 KWH |
| SAWGRASS SPRINGS MIDDLE |
210,840.000 KWH |
216,960.000 KWH |
| SEA CASTLE ELEM |
166,800.000 KWH |
159,600.000 KWH |
| SEAGULL SCHOOL |
88,553.000 KWH |
87,990.000 KWH |
| SEMINOLE MIDDLE |
178,080.000 KWH |
158,040.000 KWH |
| SHERIDAN HILLS ELEM |
84,512.000 KWH |
75,514.000 KWH |
| SHERIDAN PARK ELEM |
115,680.000 KWH |
125,040.000 KWH |
| SHERIDAN VOCATIONAL |
272,880.000 KWH |
281,520.000 KWH |
| SILVER LAKES ELEMENTARY |
106,680.000 KWH |
97,080.000 KWH |
| SILVER LAKES MIDDLE |
167,040.000 KWH |
171,240.000 KWH |
| SILVER PALMS ELEM |
135,960.000 KWH |
157,200.000 KWH |
| SILVER RIDGE ELEM |
173,040.000 KWH |
189,360.000 KWH |
| SILVER SHORES ELEMENTARY |
136,920.000 KWH |
117,000.000 KWH |
| SILVER TRAIL MIDDLE |
235,200.000 KWH |
227,280.000 KWH |
| SOUTH AREA BUS PARKING |
33,105.000 KWH |
41,578.000 KWH |
| SOUTH AREA MAINTENANCE |
15,876.000 KWH |
17,381.000 KWH |
| SOUTH BROWARD HIGH |
378,803.000 KWH |
371,924.000 KWH |
| SOUTH PLANTATION HIGH |
432,507.000 KWH |
496,129.000 KWH |
| Southwest Area Bus Complex |
25,988.000 KWH |
28,380.000 KWH |
| STEPHEN FOSTER ELEM |
124,948.000 KWH |
104,732.000 KWH |
| STIRLING ELEM |
84,000.000 KWH |
89,400.000 KWH |
| STONEMAN DOUGLAS HIGH |
450,400.000 KWH |
472,800.000 KWH |
| STRANAHAN HIGH |
373,159.000 KWH |
434,333.000 KWH |
| SUNLAND PARK ELEM |
104,640.000 KWH |
99,720.000 KWH |
| SUNRISE MIDDLE |
195,563.000 KWH |
197,791.000 KWH |
| SUNSET LAKES ELEMENTARY |
123,000.000 KWH |
138,360.000 KWH |
| SUNSET SCHOOL |
97,512.000 KWH |
80,832.000 KWH |
| SUNSHINE ELEMENTARY |
136,411.000 KWH |
89,809.000 KWH |
| TAMARAC ELEM |
165,900.000 KWH |
190,760.000 KWH |
| TARAVELLA HIGH |
430,612.000 KWH |
416,220.000 KWH |
| TECHNOLOGY AND SUPPORT SERVICE |
354,720.000 KWH |
404,400.000 KWH |
| TEDDER ELEMENTARY SCHOOL |
131,021.000 KWH |
121,852.000 KWH |
| TEQUESTA TRACE MIDDLE |
228,000.000 KWH |
233,760.000 KWH |
| THE QUEST CENTER |
95,880.000 KWH |
91,800.000 KWH |
| THURGOOD MARSHALL ELEM |
117,144.000 KWH |
120,024.000 KWH |
| TRADEWINDS ELEM |
155,880.000 KWH |
189,360.000 KWH |
| Transportation Services Annex |
5,280.000 KWH |
3,480.000 KWH |
| TROPICAL ELEM |
107,192.000 KWH |
127,682.000 KWH |
| TWIN LAKES ADMIN |
60,480.000 KWH |
57,120.000 KWH |
| TWIN LAKES ANNEX/NEW WHSE |
3,030.000 KWH |
3,074.000 KWH |
| TWIN LAKES COMPLEX |
112,555.000 KWH |
96,064.000 KWH |
| VEHICLE MAINTENANCE |
83,760.000 KWH |
76,560.000 KWH |
| VILLAGE ELEM |
188,400.000 KWH |
176,880.000 KWH |
| VIRGINIA YOUNG ELEM |
86,760.000 KWH |
79,560.000 KWH |
| WALKER ELEM |
183,605.000 KWH |
263,794.000 KWH |
| WALTER C YOUNG MIDDLE |
433,658.000 KWH |
457,749.000 KWH |
| WATKINS ELEM |
111,960.000 KWH |
101,040.000 KWH |
| WELLEBY ELEM |
106,200.000 KWH |
91,320.000 KWH |
| WEST BROWARD HIG/LLL |
410,400.000 KWH |
371,200.000 KWH |
| WEST CENTRAL BUS COMPLEX |
78,458.000 KWH |
62,322.000 KWH |
| WEST HOLLYWOOD ELEM |
136,320.000 KWH |
109,080.000 KWH |
| WESTCHESTER ELEMENTARY |
140,099.000 KWH |
147,251.000 KWH |
| WESTERN HIGH |
391,315.000 KWH |
532,043.000 KWH |
| WESTGLADES MIDDLE |
287,520.000 KWH |
269,280.000 KWH |
| WESTPINE MIDDLE |
147,720.000 KWH |
141,720.000 KWH |
| WESTWOOD HEIGHTS ELEM |
145,901.000 KWH |
145,939.000 KWH |
| WHIDDON-ROGERS ED CENTER |
135,600.000 KWH |
161,200.000 KWH |
| WHISPERING PINES |
74,400.000 KWH |
67,800.000 KWH |
| WILLIAM DANDY MIDDLE |
184,200.000 KWH |
196,440.000 KWH |
| WILTON MANORS ELEM |
122,220.000 KWH |
107,220.000 KWH |
| WINGATE OAKS CTR |
102,360.000 KWH |
66,240.000 KWH |
| WINSTON PARK ELEM |
153,840.000 KWH |
173,760.000 KWH |
|