APOLLO MIDDLE 229,440.000 KWH 239,520.000 KWH
ARTHUR ASHE MIDDLE 304,800.000 KWH 304,800.000 KWH
ATLANTIC VOC CENTER 455,967.000 KWH 516,965.000 KWH
ATLANTIC WEST ELEM 130,800.000 KWH 128,880.000 KWH
ATTUCKS MIDDLE 216,240.000 KWH 211,677.000 KWH
BAIR MIDDLE 168,240.000 KWH 157,920.000 KWH
BANYAN ELEM 128,280.000 KWH 126,000.000 KWH
BAYVIEW ELEM 71,880.000 KWH 65,400.000 KWH
BECON 242,000.000 KWH 184,320.000 KWH
BENNETT ELEM 93,120.000 KWH 81,120.000 KWH
BETHUNE ELEM 173,280.000 KWH 147,720.000 KWH
BOULEVARD HEIGHTS ELEM 125,520.000 KWH 128,640.000 KWH
BOYD ANDERSON HIGH 369,878.000 KWH 407,524.000 KWH
BRIGHT HORIZONS CTR 142,080.000 KWH 79,440.000 KWH
BROADVIEW ELEM 98,227.000 KWH 99,348.000 KWH
BROWARD ESTATES ELEM 122,485.000 KWH 130,633.000 KWH
BROWARD FIRE ACADEMY 29,702.000 KWH 37,587.000 KWH
CASTLE HILL ELEM 142,920.000 KWH 107,520.000 KWH
CENTRAL PARK ELEM 142,440.000 KWH 198,720.000 KWH
CHALLENGER ELEMENTARY 164,400.000 KWH 147,960.000 KWH
CHAPEL TRAIL ELEM 174,138.000 KWH 141,875.000 KWH
CHARLES DREW ELEM 114,960.000 KWH 131,400.000 KWH
COCONUT CREEK ELEM 101,550.000 KWH 100,465.000 KWH
COCONUT CREEK HIGH 364,424.000 KWH 382,166.000 KWH
COCONUT PALM ELEMENTARY 138,600.000 KWH 135,720.000 KWH
COLBERT ELEM 133,440.000 KWH 110,880.000 KWH
COLLINS ELEM 72,960.000 KWH 70,800.000 KWH
COMMUNITY SCHOOL NORTH 21,120.000 KWH 20,520.000 KWH
COMMUNITY SCHOOL SOUTH 9,756.000 KWH 9,984.000 KWH
COOPER CITY COMM 5,259.000 KWH 427.000 KWH
COOPER CITY ELEM 119,520.000 KWH 119,760.000 KWH
COOPER CITY HIGH 532,465.000 KWH 586,873.000 KWH
CORAL COVE ELEMENTARY 110,640.000 KWH 125,280.000 KWH
CORAL GLADES HIGH 355,920.000 KWH 345,360.000 KWH
CORAL PARK ELEM 120,240.000 KWH 111,720.000 KWH
CORAL SPRINGS ELEM 119,520.000 KWH 108,480.000 KWH
CORAL SPRINGS HIGH 433,657.000 KWH 481,471.000 KWH
CORAL SPRINGS MIDDLE 223,240.000 KWH 188,840.000 KWH
COUNTRY HILLS ELEM 138,480.000 KWH 158,640.000 KWH
COUNTRY ISLES ELEM 168,720.000 KWH 149,760.000 KWH
CRESTHAVEN ELEM 98,400.000 KWH 82,800.000 KWH
CROISSANT PARK ELEM 115,589.000 KWH 122,016.000 KWH
CROSS CREEK 78,120.000 KWH 86,340.000 KWH
CRYSTAL LAKE COMM SCHOOL 4,994.000 KWH 5,230.000 KWH
CRYSTAL LAKE MIDDLE 171,755.000 KWH 172,441.000 KWH
CYPRESS BAY HIGH 508,400.000 KWH 549,200.000 KWH
CYPRESS BAY HIGH ANNEX 55,680.000 KWH 53,280.000 KWH
CYPRESS ELEM 87,840.000 KWH 80,640.000 KWH
CYPRESS RUN ALTERNATIVE 69,054.000 KWH 74,358.000 KWH
DANIA ELEM 129,323.000 KWH 105,157.000 KWH
DAVE THOMAS ED CENTER (WEST) 97,200.000 KWH 98,160.000 KWH
DAVE THOMAS EDUCATION CENTER 35,846.000 KWH 33,459.000 KWH
DAVIE ELEM 142,937.000 KWH 120,238.000 KWH
DEERFIELD BEACH ELEM 131,523.000 KWH 135,634.000 KWH
DEERFIELD BEACH HIGH 381,528.000 KWH 358,068.000 KWH
DEERFIELD BEACH MID 200,278.000 KWH 276,622.000 KWH
DEERFIELD PARK ELEM 101,640.000 KWH 82,320.000 KWH
DILLARD ELEM 137,520.000 KWH 148,560.000 KWH
DILLARD HIGH SCHOOL 739,100.000 KWH 743,835.000 KWH
DISCOVERY ELEMENTARY .000 KWH 140,880.000 KWH
DOLPHIN BAY ELEMENTARY 113,280.000 KWH 98,880.000 KWH
DREW RESOURCE CTR 58,698.000 KWH 74,514.000 KWH
DRIFTWOOD ELEM 85,909.000 KWH 106,616.000 KWH
DRIFTWOOD MIDDLE 355,685.000 KWH 355,499.000 KWH
EAGLE POINT ELEM 200,400.000 KWH 172,200.000 KWH
EAGLE RIDGE ELEM 147,000.000 KWH 155,520.000 KWH
ECIA SPECIAL PROGRAMS 19,140.000 KWH 32,556.000 KWH
EDGEWOOD CENTER 44,776.000 KWH 46,216.000 KWH
ELY HIGH 662,496.000 KWH 593,936.000 KWH
EMBASSY CREEK ELEM 115,320.000 KWH 119,160.000 KWH
ENDEAVOR LEARNING CENTER 93,240.000 KWH 89,280.000 KWH
EVERGLADES ELEMENTARY 186,076.000 KWH 150,470.000 KWH
EVERGLADES HIGH 582,840.000 KWH 482,640.000 KWH
FAIRWAY ELEM 184,200.000 KWH 112,320.000 KWH
FALCON COVE MIDDLE 264,518.000 KWH 318,287.000 KWH
FLAMINGO ELEM 120,568.000 KWH 120,928.000 KWH
FLANAGAN HIGH 499,029.000 KWH 480,011.000 KWH
FLORANADA ELEM 110,256.000 KWH 97,536.000 KWH
FOREST GLEN MIDDLE 194,085.000 KWH 219,474.000 KWH
FOREST HILLS ELEM 101,760.000 KWH 117,000.000 KWH
FORT LAUDERDALE HIGH 520,975.000 KWH 425,202.000 KWH
FOX TRAIL ELEMENTARY 148,080.000 KWH 166,080.000 KWH
GATOR RUN ELEMENTARY 165,960.000 KWH 158,400.000 KWH
GLADES MIDDLE 304,800.000 KWH 278,400.000 KWH
GRIFFIN ELEM 91,200.000 KWH 90,120.000 KWH
GULFSTREAM MIDDLE SCHOOL 72,360.000 KWH 73,920.000 KWH
HALLANDALE ADULT CENTER 154,382.000 KWH 140,614.000 KWH
HALLANDALE ELEM 119,760.000 KWH 114,480.000 KWH
HALLANDALE HIGH 264,044.000 KWH 315,678.000 KWH
HARBORDALE ELEM 62,328.000 KWH 91,848.000 KWH
HAWKES BLUFF ELEM 137,766.000 KWH 146,163.000 KWH
HERON HEIGHTS ELEMENTARY .000 KWH 138,000.000 KWH
HOLLYWOOD CENTRAL AUDITORIUM 37,860.000 KWH 32,400.000 KWH
HOLLYWOOD CENTRAL ELEM 81,960.000 KWH 78,960.000 KWH
HOLLYWOOD HILLS COMMUNITY 1,830.000 KWH 2,767.000 KWH
HOLLYWOOD HILLS ELEMENTARY 134,400.000 KWH 259,680.000 KWH
HOLLYWOOD HILLS HIGH 293,389.000 KWH 308,238.000 KWH
HOLLYWOOD PARK ELEM 82,560.000 KWH 89,760.000 KWH
HORIZON ELEM 105,240.000 KWH 77,640.000 KWH
HORTT ADMIN SITE 49,313.000 KWH 49,017.000 KWH
INDIAN RIDGE MIDDLE 286,039.000 KWH 294,048.000 KWH
INDIAN TRACE ELEM 111,480.000 KWH 92,280.000 KWH
JAMES HUNT ELEMENTARY 101,040.000 KWH 112,440.000 KWH
KATHLEEN WRIGHT ADMIN 418,397.000 KWH 372,073.000 KWH
LAKE FOREST ELEM 146,640.000 KWH 120,360.000 KWH
LAKESIDE ELEMENTARY 120,240.000 KWH 121,200.000 KWH
LANIER JAMES CENTER 48,960.000 KWH 35,040.000 KWH
LARKDALE ELEM 130,514.000 KWH 122,113.000 KWH
LAUDERDALE LAKES MIDDLE 167,640.000 KWH 125,795.000 KWH
LAUDERDALE MANORS ELEM 205,920.000 KWH 241,800.000 KWH
LAUDERHILL MIDDLE 130,080.000 KWH 125,880.000 KWH
LAUDERHILL MIDDLE/COMM 2,694.000 KWH 2,778.000 KWH
LAUDERHILL PT ELEM 127,440.000 KWH 121,680.000 KWH
LIBERTY ELEMENTARY 146,880.000 KWH 166,320.000 KWH
LLOYD ESTATES ELEM 85,440.000 KWH 119,760.000 KWH
LOCKHART STADIUM 61,982.000 KWH 58,796.000 KWH
LYONS CREEK MIDDLE 300,240.000 KWH 329,280.000 KWH
MANATEE BAY ELEMENTARY 146,397.000 KWH 172,640.000 KWH
MAPLEWOOD ELEM 138,840.000 KWH 117,360.000 KWH
MARGATE ELEM 158,640.000 KWH 169,200.000 KWH
MARGATE MIDDLE 182,734.000 KWH 215,462.000 KWH
MARKHAM ELEM 114,923.000 KWH 120,732.000 KWH
MARTIN LUTHER KING ELEM 118,008.000 KWH 130,684.000 KWH
MCARTHUR HIGH 462,074.000 KWH 468,936.000 KWH
MCFATTER VO TECH 315,360.000 KWH 324,000.000 KWH
MCNAB ELEMENTARY 114,371.000 KWH 107,117.000 KWH
MCNICOL MIDDLE 290,160.000 KWH 268,800.000 KWH
MEADOWBROOK ELEM 138,421.000 KWH 98,880.000 KWH
MILLENNIUM MIDDLE 293,280.000 KWH 310,080.000 KWH
MIRAMAR ELEM 122,040.000 KWH 95,280.000 KWH
MIRAMAR HIGH 471,236.000 KWH 436,145.000 KWH
MIRROR LAKE ELEM 84,000.000 KWH 96,960.000 KWH
MONARCH HIGH 341,200.000 KWH 370,400.000 KWH
MORROW ELEM 125,160.000 KWH 126,720.000 KWH
MULTICULTURAL CENTER 9,720.000 KWH 15,360.000 KWH
N ANDREWS GARDENS ELEM 159,864.000 KWH 184,464.000 KWH
NEW RENAISSANCE MIDDLE 225,959.000 KWH 258,823.000 KWH
NEW RIVER CIRCLE SITE 47,844.000 KWH 49,104.000 KWH
NEW RIVER MIDDLE SCHOOL 237,240.000 KWH 231,600.000 KWH
NOB HILL ELEM 107,640.000 KWH 113,760.000 KWH
NORCREST ELEM 210,894.000 KWH 99,926.000 KWH
NORTH AREA MAINT/WHSE 34,980.000 KWH 28,320.000 KWH
NORTH BUS PARKING LOT 49,862.000 KWH 58,631.000 KWH
NORTH CENTRAL SUPERINTENDENT 94,320.000 KWH 70,140.000 KWH
NORTH FORK ELEM 106,320.000 KWH 114,360.000 KWH
NORTH LAUDERDALE ELEM 97,440.000 KWH 105,360.000 KWH
NORTH SIDE ELEMENTARY 106,320.000 KWH 116,640.000 KWH
NORTH WEST TRANSPORTATION 19,560.000 KWH 24,480.000 KWH
NORTHEAST HIGH 362,653.000 KWH 351,617.000 KWH
NOVA BLANCHE FORMAN/EISENHOWER ELEM 222,800.000 KWH 250,400.000 KWH
NOVA CENTER - NOVA MIDDLE .000 KWH 34,140.000 KWH
NOVA EISENHOWER ELEMENTARY 8,436.000 KWH 7,387.000 KWH
NOVA HIGH 27,558.000 KWH 35,831.000 KWH
NOVA HIGH - MECH PLANT 758,400.000 KWH 664,000.000 KWH
OAKLAND PARK ELEM 122,280.000 KWH 102,240.000 KWH
OAKRIDGE ELEM 114,758.000 KWH 98,360.000 KWH
OFF CAMPUS ALTERNATIVE CENTER .000 KWH 1,643.000 KWH
OLSEN MIDDLE 165,480.000 KWH 205,200.000 KWH
OLSEN MIDDLE ANNEX 102,680.000 KWH 112,280.000 KWH
ORANGE BROOK ELEM 103,920.000 KWH 87,600.000 KWH
ORIOLE ELEM 84,480.000 KWH 84,960.000 KWH
PALM COVE ELEM 147,600.000 KWH 143,880.000 KWH
PALMVIEW ELEM 129,360.000 KWH 85,680.000 KWH
PANTHER RUN ELEM 103,440.000 KWH 117,720.000 KWH
PARK LAKES ELEMENTARY 151,680.000 KWH 150,000.000 KWH
PARK LAKES ELEMENTARY ANNEX 20,488.000 KWH 19,768.000 KWH
PARK RIDGE ELEM 84,000.000 KWH 71,400.000 KWH
PARK SPRINGS ELEM 136,800.000 KWH 139,920.000 KWH
PARK TRAILS ELEMENTARY 161,040.000 KWH 164,880.000 KWH
PARKSIDE ELEMENTARY 132,960.000 KWH 136,320.000 KWH
PARKWAY MIDDLE 342,720.000 KWH 282,059.000 KWH
PASADENA LAKES ELEM 163,050.000 KWH 146,849.000 KWH
PEMBROKE LAKES ELEM 90,480.000 KWH 102,480.000 KWH
PEMBROKE PINES ELEM 92,144.000 KWH 92,859.000 KWH
PERRY ELEM 122,255.000 KWH 138,096.000 KWH
PERRY MIDDLE 164,400.000 KWH 134,160.000 KWH
PETERS ELEM 152,294.000 KWH 147,930.000 KWH
PHYSICAL PLANT OPERATIONS 94,289.000 KWH 91,294.000 KWH
PINE RIDGE CTR 68,400.000 KWH 66,960.000 KWH
PINES LAKES ELEM 152,400.000 KWH 171,600.000 KWH
PINES MIDDLE 247,288.000 KWH 256,168.000 KWH
PINEWOOD ELEM 120,240.000 KWH 116,640.000 KWH
PIONEER MIDDLE 194,112.000 KWH 247,670.000 KWH
PIONEER MIDDLE ANNEX 34,200.000 KWH 26,880.000 KWH
PIPER HIGH 454,431.000 KWH 455,524.000 KWH
PLANTATION ELEM 124,952.000 KWH 108,192.000 KWH
PLANTATION HIGH 383,430.000 KWH 399,023.000 KWH
PLANTATION MIDDLE 187,945.000 KWH 245,874.000 KWH
PLANTATION PARK ELEM 79,976.000 KWH 81,000.000 KWH
POMPANO BEACH ELEM 178,200.000 KWH 111,240.000 KWH
POMPANO BEACH HIGH 333,374.000 KWH 320,659.000 KWH
POMPANO BEACH MIDDLE 210,888.000 KWH 207,288.000 KWH
PORTABLE AT PINES 57,752.000 KWH 67,330.000 KWH
PPO ZONE 2 - LEASED 25,771.000 KWH 23,942.000 KWH
QUIET WATERS ELEM 16,740.000 KWH 139,680.000 KWH
RAMBLEWOOD ELEM 121,920.000 KWH 138,480.000 KWH
RAMBLEWOOD MIDDLE 234,071.000 KWH 258,612.000 KWH
RICKARDS MIDDLE 192,338.000 KWH 194,775.000 KWH
RIVERGLADES ELEM 104,160.000 KWH 97,560.000 KWH
RIVERLAND ELEM 106,080.000 KWH 126,120.000 KWH
RIVERSIDE ELEM 134,400.000 KWH 124,560.000 KWH
ROCK ISLAND ADMIN 76,512.000 KWH 66,312.000 KWH
ROYAL PALM ELEMENTARY 150,658.000 KWH 179,850.000 KWH
SANDERS PARK ELEM 84,800.000 KWH 71,600.000 KWH
SANDPIPER ELEM 141,479.000 KWH 157,320.000 KWH
SAWGRASS ELEM 151,920.000 KWH 168,720.000 KWH
SAWGRASS SPRINGS MIDDLE 210,840.000 KWH 216,960.000 KWH
SEA CASTLE ELEM 166,800.000 KWH 159,600.000 KWH
SEAGULL SCHOOL 88,553.000 KWH 87,990.000 KWH
SEMINOLE MIDDLE 178,080.000 KWH 158,040.000 KWH
SHERIDAN HILLS ELEM 84,512.000 KWH 75,514.000 KWH
SHERIDAN PARK ELEM 115,680.000 KWH 125,040.000 KWH
SHERIDAN VOCATIONAL 272,880.000 KWH 281,520.000 KWH
SILVER LAKES ELEMENTARY 106,680.000 KWH 97,080.000 KWH
SILVER LAKES MIDDLE 167,040.000 KWH 171,240.000 KWH
SILVER PALMS ELEM 135,960.000 KWH 157,200.000 KWH
SILVER RIDGE ELEM 173,040.000 KWH 189,360.000 KWH
SILVER SHORES ELEMENTARY 136,920.000 KWH 117,000.000 KWH
SILVER TRAIL MIDDLE 235,200.000 KWH 227,280.000 KWH
SOUTH AREA BUS PARKING 33,105.000 KWH 41,578.000 KWH
SOUTH AREA MAINTENANCE 15,876.000 KWH 17,381.000 KWH
SOUTH BROWARD HIGH 378,803.000 KWH 371,924.000 KWH
SOUTH PLANTATION HIGH 432,507.000 KWH 496,129.000 KWH
Southwest Area Bus Complex 25,988.000 KWH 28,380.000 KWH
STEPHEN FOSTER ELEM 124,948.000 KWH 104,732.000 KWH
STIRLING ELEM 84,000.000 KWH 89,400.000 KWH
STONEMAN DOUGLAS HIGH 450,400.000 KWH 472,800.000 KWH
STRANAHAN HIGH 373,159.000 KWH 434,333.000 KWH
SUNLAND PARK ELEM 104,640.000 KWH 99,720.000 KWH
SUNRISE MIDDLE 195,563.000 KWH 197,791.000 KWH
SUNSET LAKES ELEMENTARY 123,000.000 KWH 138,360.000 KWH
SUNSET SCHOOL 97,512.000 KWH 80,832.000 KWH
SUNSHINE ELEMENTARY 136,411.000 KWH 89,809.000 KWH
TAMARAC ELEM 165,900.000 KWH 190,760.000 KWH
TARAVELLA HIGH 430,612.000 KWH 416,220.000 KWH
TECHNOLOGY AND SUPPORT SERVICE 354,720.000 KWH 404,400.000 KWH
TEDDER ELEMENTARY SCHOOL 131,021.000 KWH 121,852.000 KWH
TEQUESTA TRACE MIDDLE 228,000.000 KWH 233,760.000 KWH
THE QUEST CENTER 95,880.000 KWH 91,800.000 KWH
THURGOOD MARSHALL ELEM 117,144.000 KWH 120,024.000 KWH
TRADEWINDS ELEM 155,880.000 KWH 189,360.000 KWH
Transportation Services Annex 5,280.000 KWH 3,480.000 KWH
TROPICAL ELEM 107,192.000 KWH 127,682.000 KWH
TWIN LAKES ADMIN 60,480.000 KWH 57,120.000 KWH
TWIN LAKES ANNEX/NEW WHSE 3,030.000 KWH 3,074.000 KWH
TWIN LAKES COMPLEX 112,555.000 KWH 96,064.000 KWH
VEHICLE MAINTENANCE 83,760.000 KWH 76,560.000 KWH
VILLAGE ELEM 188,400.000 KWH 176,880.000 KWH
VIRGINIA YOUNG ELEM 86,760.000 KWH 79,560.000 KWH
WALKER ELEM 183,605.000 KWH 263,794.000 KWH
WALTER C YOUNG MIDDLE 433,658.000 KWH 457,749.000 KWH
WATKINS ELEM 111,960.000 KWH 101,040.000 KWH
WELLEBY ELEM 106,200.000 KWH 91,320.000 KWH
WEST BROWARD HIG/LLL 410,400.000 KWH 371,200.000 KWH
WEST CENTRAL BUS COMPLEX 78,458.000 KWH 62,322.000 KWH
WEST HOLLYWOOD ELEM 136,320.000 KWH 109,080.000 KWH
WESTCHESTER ELEMENTARY 140,099.000 KWH 147,251.000 KWH
WESTERN HIGH 391,315.000 KWH 532,043.000 KWH
WESTGLADES MIDDLE 287,520.000 KWH 269,280.000 KWH
WESTPINE MIDDLE 147,720.000 KWH 141,720.000 KWH
WESTWOOD HEIGHTS ELEM 145,901.000 KWH 145,939.000 KWH
WHIDDON-ROGERS ED CENTER 135,600.000 KWH 161,200.000 KWH
WHISPERING PINES 74,400.000 KWH 67,800.000 KWH
WILLIAM DANDY MIDDLE 184,200.000 KWH 196,440.000 KWH
WILTON MANORS ELEM 122,220.000 KWH 107,220.000 KWH
WINGATE OAKS CTR 102,360.000 KWH 66,240.000 KWH
WINSTON PARK ELEM 153,840.000 KWH 173,760.000 KWH