Utility Savings
Building Name
Jan-08
Jan-09
APOLLO MIDDLE 210,720.000 KWH 208,080.000 KWH
ARTHUR ASHE MIDDLE 314,000.000 KWH 263,600.000 KWH
ATLANTIC VOC CENTER 514,007.000 KWH 434,030.000 KWH
ATLANTIC WEST ELEM 121,080.000 KWH 119,760.000 KWH
ATTUCKS MIDDLE 264,003.000 KWH 205,440.000 KWH
BAIR MIDDLE 194,640.000 KWH 166,080.000 KWH
BANYAN ELEM 123,720.000 KWH 111,720.000 KWH
BAYVIEW ELEM 81,360.000 KWH 73,440.000 KWH
BECON 286,680.000 KWH 256,240.000 KWH
BENNETT ELEM 91,440.000 KWH 94,800.000 KWH
BETHUNE ELEM 189,960.000 KWH 163,680.000 KWH
BOULEVARD HEIGHTS ELEM 81,600.000 KWH 116,520.000 KWH
BOYD ANDERSON HIGH 447,540.000 KWH 375,319.000 KWH
BRIGHT HORIZONS CTR 110,160.000 KWH 87,600.000 KWH
BROADVIEW ELEM 124,246.000 KWH 112,477.000 KWH
BROWARD EDUCATION FOUNDATION 1,353.000 KWH .000 KWH
BROWARD ESTATES ELEM 104,657.000 KWH 106,217.000 KWH
BROWARD FIRE ACADEMY 28,260.000 KWH 32,521.000 KWH
CASTLE HILL ELEM 126,840.000 KWH 135,720.000 KWH
CENTRAL PARK ELEM 128,160.000 KWH 114,000.000 KWH
CHALLENGER ELEMENTARY 163,800.000 KWH 96,720.000 KWH
CHAPEL TRAIL ELEM 171,177.000 KWH 171,915.000 KWH
CHARLES DREW ELEM 99,720.000 KWH 104,760.000 KWH
COCONUT CREEK ELEM 87,659.000 KWH 84,651.000 KWH
COCONUT CREEK HIGH 335,506.000 KWH 321,206.000 KWH
COCONUT PALM ELEMENTARY 134,760.000 KWH 114,600.000 KWH
COLBERT ELEM 151,920.000 KWH 111,360.000 KWH
COLLINS ELEM 76,800.000 KWH 59,760.000 KWH
COOPER CITY COMM 19,200.000 KWH 21,600.000 KWH
COMMUNITY SCHOOL NORTH .000 KWH 10,490.000 KWH
COMMUNITY SCHOOL SOUTH 4,975.000 KWH 3,870.000 KWH
COOPER CITY ELEM 107,520.000 KWH 94,320.000 KWH
COOPER CITY HIGH 532,607.000 KWH 443,848.000 KWH
CORAL COVE ELEMENTARY 88,800.000 KWH 99,120.000 KWH
CORAL GLADES HIGH 420,240.000 KWH 313,680.000 KWH
CORAL PARK ELEM 98,760.000 KWH 115,320.000 KWH
CORAL SPRINGS ELEM 96,720.000 KWH 109,920.000 KWH
CORAL SPRINGS HIGH 361,494.000 KWH 379,791.000 KWH
CORAL SPRINGS MIDDLE 207,640.000 KWH 170,440.000 KWH
COUNTRY HILLS ELEM 192,480.000 KWH 121,800.000 KWH
COUNTRY ISLES ELEM 152,640.000 KWH 163,560.000 KWH
CRESTHAVEN ELEM 109,200.000 KWH 94,560.000 KWH
CROISSANT PARK ELEM 106,300.000 KWH 100,877.000 KWH
CROSS CREEK 68,760.000 KWH 68,880.000 KWH
CRYSTAL LAKE COMM SCHOOL 6,846.000 KWH 5,530.000 KWH
CRYSTAL LAKE MIDDLE 226,408.000 KWH 184,488.000 KWH
CYPRESS BAY HIGH 517,200.000 KWH 526,000.000 KWH
CYPRESS BAY HIGH ANNEX 41,520.000 KWH 61,920.000 KWH
CYPRESS ELEM 107,280.000 KWH 91,200.000 KWH
CYPRESS RUN ALTERNATIVE 45,533.000 KWH 63,498.000 KWH
DANIA ELEM 117,790.000 KWH 149,245.000 KWH
DAVE THOMAS ED CENTER (WEST) 99,360.000 KWH 107,760.000 KWH
DAVE THOMAS EDUCATION CENTER 43,262.000 KWH 34,695.000 KWH
DAVIE ELEM 110,860.000 KWH 94,551.000 KWH
DEERFIELD BEACH ELEM 163,685.000 KWH 141,929.000 KWH
DEERFIELD BEACH HIGH 396,960.000 KWH 360,478.000 KWH
DEERFIELD BEACH MID 243,477.000 KWH 192,982.000 KWH
DEERFIELD PARK ELEM 126,480.000 KWH 99,600.000 KWH
DILLARD ELEM 126,600.000 KWH 141,600.000 KWH
DILLARD HIGH COMM 3,144.000 KWH .000 KWH
DILLARD HIGH SCHOOL 672,784.000 KWH 649,461.000 KWH
DOLPHIN BAY ELEMENTARY 106,080.000 KWH 97,680.000 KWH
DREW RESOURCE CTR 67,703.000 KWH 53,824.000 KWH
DRIFTWOOD ELEM 105,876.000 KWH 73,830.000 KWH
DRIFTWOOD MIDDLE 383,018.000 KWH 347,858.000 KWH
EAGLE POINT ELEM 222,600.000 KWH 194,640.000 KWH
EAGLE RIDGE ELEM 144,480.000 KWH 120,120.000 KWH
ECIA SPECIAL PROGRAMS 20,014.000 KWH 18,088.000 KWH
EDGEWOOD CENTER 36,016.000 KWH 31,336.000 KWH
ELY HIGH 743,002.000 KWH 602,577.000 KWH
EMBASSY CREEK ELEM 83,160.000 KWH 96,600.000 KWH
ENDEAVOR LEARNING CENTER 81,240.000 KWH 79,920.000 KWH
EVERGLADES ELEMENTARY 169,753.000 KWH 172,646.000 KWH
EVERGLADES HIGH 528,600.000 KWH 517,200.000 KWH
FAIRWAY ELEM 207,000.000 KWH 200,640.000 KWH
FALCON COVE MIDDLE 410,629.000 KWH 403,989.000 KWH
FLAMINGO ELEM 120,328.000 KWH 86,248.000 KWH
FLANAGAN HIGH 486,725.000 KWH 448,933.000 KWH
FLORANADA ELEM 127,536.000 KWH 113,616.000 KWH
FOREST GLEN MIDDLE 227,370.000 KWH 228,258.000 KWH
FOREST HILLS ELEM 99,720.000 KWH 115,560.000 KWH
FORT LAUDERDALE HIGH 557,732.000 KWH 486,948.000 KWH
FOX TRAIL ELEMENTARY 137,520.000 KWH 132,240.000 KWH
GATOR RUN ELEMENTARY 203,760.000 KWH 176,160.000 KWH
GLADES MIDDLE 262,800.000 KWH 297,200.000 KWH
GRIFFIN ELEM 96,960.000 KWH 75,720.000 KWH
GULFSTREAM MIDDLE SCHOOL 89,160.000 KWH 70,080.000 KWH
HALLANDALE ADULT CENTER 167,389.000 KWH 144,678.000 KWH
HALLANDALE ELEM 171,600.000 KWH 119,760.000 KWH
HALLANDALE HIGH 263,125.000 KWH 263,316.000 KWH
HARBORDALE ELEM 83,496.000 KWH 65,208.000 KWH
HAWKES BLUFF ELEM 138,960.000 KWH 119,763.000 KWH
HOLLYWOOD CENTRAL AUDITORIUM 35,820.000 KWH 31,080.000 KWH
HOLLYWOOD CENTRAL ELEM 106,080.000 KWH 89,520.000 KWH
HOLLYWOOD HILLS COMMUNITY 2,735.000 KWH 2,144.000 KWH
HOLLYWOOD HILLS ELEMENTARY .000 KWH 130,800.000 KWH
HOLLYWOOD HILLS HIGH 368,395.000 KWH 324,836.000 KWH
HOLLYWOOD PARK ELEM 87,600.000 KWH 66,480.000 KWH
HORIZON ELEM 101,040.000 KWH 75,960.000 KWH
HORTT ADMIN SITE 49,661.000 KWH 46,878.000 KWH
INDIAN RIDGE MIDDLE 291,180.000 KWH 241,259.000 KWH
INDIAN TRACE ELEM 124,440.000 KWH 109,680.000 KWH
JAMES HUNT ELEMENTARY 112,080.000 KWH 93,240.000 KWH
KATHLEEN WRIGHT ADMIN 431,861.000 KWH 357,641.000 KWH
LAKE FOREST ELEM 182,448.000 KWH 167,760.000 KWH
LAKESIDE ELEMENTARY 117,600.000 KWH 99,600.000 KWH
LANIER JAMES CENTER 57,120.000 KWH 51,600.000 KWH
LARKDALE ELEM 106,736.000 KWH 98,191.000 KWH
LAUDERDALE LAKES MIDDLE 166,560.000 KWH 140,400.000 KWH
LAUDERDALE MANORS ELEM 274,920.000 KWH 227,520.000 KWH
LAUDERHILL MIDDLE 158,160.000 KWH 133,920.000 KWH
LAUDERHILL MIDDLE/COMM 3,237.000 KWH 3,147.000 KWH
LAUDERHILL PT ELEM 150,120.000 KWH 162,960.000 KWH
LIBERTY ELEMENTARY 126,240.000 KWH 122,880.000 KWH
LLOYD ESTATES ELEM 91,920.000 KWH 73,200.000 KWH
LOCKHART STADIUM 47,575.000 KWH 41,601.000 KWH
LYONS CREEK MIDDLE 285,840.000 KWH 330,000.000 KWH
MANATEE BAY ELEMENTARY 132,008.000 KWH 121,329.000 KWH
MAPLEWOOD ELEM 131,880.000 KWH 108,840.000 KWH
MARGATE ELEM 137,760.000 KWH 142,440.000 KWH
MARGATE MIDDLE 188,407.000 KWH 179,229.000 KWH
MARKHAM ELEM 101,859.000 KWH 130,825.000 KWH
MARTIN LUTHER KING ELEM 142,122.000 KWH 136,355.000 KWH
MCARTHUR HIGH 409,025.000 KWH 411,327.000 KWH
MCFATTER VO TECH 360,240.000 KWH 268,800.000 KWH
MCNAB ELEMENTARY 166,680.000 KWH 121,438.000 KWH
MCNICOL MIDDLE 238,080.000 KWH 244,320.000 KWH
MEADOWBROOK ELEM 94,866.000 KWH 130,018.000 KWH
MILLENNIUM MIDDLE 272,400.000 KWH 258,240.000 KWH
MIRAMAR ELEM 131,160.000 KWH 128,040.000 KWH
MIRAMAR HIGH 431,353.000 KWH 431,416.000 KWH
MIRROR LAKE ELEM 76,560.000 KWH 73,680.000 KWH
MONARCH HIGH 353,600.000 KWH 341,200.000 KWH
MORROW ELEM 108,120.000 KWH 95,280.000 KWH
MULTICULTURAL CENTER 5,160.000 KWH 9,360.000 KWH
N ANDREWS GARDENS ELEM 138,624.000 KWH 149,184.000 KWH
NEW RENAISSANCE MIDDLE 219,942.000 KWH 200,770.000 KWH
NEW RIVER MIDDLE SCHOOL 104,904.000 KWH 41,424.000 KWH
NOB HILL ELEM 248,400.000 KWH 160,920.000 KWH
NORCREST ELEM 96,720.000 KWH 97,320.000 KWH
NORTH AREA MAINT/WHSE 127,580.000 KWH 182,674.000 KWH
NORTH AREA SUPERINTENDENT 31,440.000 KWH 28,920.000 KWH
NORTH BUS PARKING LOT 70,692.000 KWH 68,404.000 KWH
NORTH CENTRAL SUPERINTENDENT 87,840.000 KWH 83,400.000 KWH
NORTH FORK ELEM 141,360.000 KWH 96,480.000 KWH
NORTH LAUDERDALE ELEM 99,840.000 KWH 90,720.000 KWH
NORTH SIDE ELEMENTARY 110,760.000 KWH 107,640.000 KWH
NORTHEAST HIGH 337,534.000 KWH 354,936.000 KWH
NOVA BLANCHE FORMAN/EISENHOWER ELEM 233,600.000 KWH 192,400.000 KWH
NOVA EISENHOWER ELEMENTARY 10,502.000 KWH 10,562.000 KWH
NOVA HIGH 5,387.000 KWH 28,345.000 KWH
NOVA HIGH - MECH PLANT 640,000.000 KWH 692,800.000 KWH
NOVA HIGH COMM/GED 59.000 KWH .000 KWH
OAKLAND PARK ELEM 135,360.000 KWH 105,480.000 KWH
OAKRIDGE ELEM 117,929.000 KWH 110,963.000 KWH
OLSEN MIDDLE 177,840.000 KWH 175,200.000 KWH
OLSEN MIDDLE ANNEX 104,840.000 KWH 77,240.000 KWH
ORANGEBROOK ELEM 132,720.000 KWH 107,280.000 KWH
ORIOLE ELEM 102,720.000 KWH 82,080.000 KWH
PALM COVE ELEM 127,440.000 KWH 136,560.000 KWH
PALMVIEW ELEM 131,400.000 KWH 114,960.000 KWH
PANTHER RUN ELEM 71,040.000 KWH 80,040.000 KWH
PARK LAKES ELEMENTARY 139,680.000 KWH 162,240.000 KWH
PARK LAKES ELEMENTARY ANNEX 24,264.000 KWH 17,608.000 KWH
PARK RIDGE ELEM 91,200.000 KWH 73,680.000 KWH
PARK SPRINGS ELEM 129,840.000 KWH 130,560.000 KWH
PARK TRAILS ELEMENTARY 168,960.000 KWH 128,640.000 KWH
PARKSIDE ELEMENTARY 133,200.000 KWH 120,960.000 KWH
PARKWAY MIDDLE 371,727.000 KWH 313,341.000 KWH
PASADENA LAKES ELEM 145,917.000 KWH 161,539.000 KWH
PEMBROKE LAKES ELEM 95,340.000 KWH 99,960.000 KWH
PEMBROKE PINES ELEM 93,728.000 KWH 97,581.000 KWH
PERRY ELEM 123,639.000 KWH 104,606.000 KWH
PERRY MIDDLE 195,360.000 KWH 186,240.000 KWH
PETERS ELEM 132,978.000 KWH 150,528.000 KWH
PHYSICAL PLANT OPERATIONS 94,900.000 KWH 93,725.000 KWH
PINE RIDGE CTR 78,240.000 KWH 72,240.000 KWH
PINES LAKES ELEM 130,080.000 KWH 142,200.000 KWH
PINES MIDDLE 216,328.000 KWH 218,008.000 KWH
PINEWOOD ELEM 138,720.000 KWH 118,440.000 KWH
PIONEER MIDDLE 155,279.000 KWH 171,202.000 KWH
PIONEER MIDDLE ANNEX 28,620.000 KWH 31,680.000 KWH
PIPER HIGH 368,162.000 KWH 433,346.000 KWH
PLANTATION ELEM 122,891.000 KWH 111,622.000 KWH
PLANTATION HIGH 344,253.000 KWH 290,223.000 KWH
PLANTATION MIDDLE 194,823.000 KWH 175,619.000 KWH
PLANTATION PARK ELEM 73,404.000 KWH 70,017.000 KWH
POMPANO BEACH ELEM 115,200.000 KWH 156,720.000 KWH
POMPANO BEACH HIGH 326,919.000 KWH 308,557.000 KWH
POMPANO BEACH MIDDLE 201,576.000 KWH 182,568.000 KWH
PPO ZONE 2 - LEASED 70,476.000 KWH 49,388.000 KWH
QUIET WATERS ELEM 25,089.000 KWH 27,465.000 KWH
RAMBLEWOOD ELEM 153,180.000 KWH 92,160.000 KWH
RAMBLEWOOD MIDDLE 118,560.000 KWH 144,000.000 KWH
RICKARDS MIDDLE 305,280.000 KWH 200,480.000 KWH
RIVERGLADES ELEM 168,303.000 KWH 169,908.000 KWH
RIVERLAND ELEM 94,200.000 KWH 93,000.000 KWH
RIVERSIDE ELEM 95,760.000 KWH 127,800.000 KWH
ROCK ISLAND ADMIN 125,160.000 KWH 131,880.000 KWH
ROYAL PALM ELEMENTARY 70,752.000 KWH 36,792.000 KWH
SAFETY DEPARTMENT 146,792.000 KWH 146,386.000 KWH
SANDERS PARK ELEM 101,600.000 KWH 87,600.000 KWH
SANDPIPER ELEM 151,800.000 KWH 143,880.000 KWH
SAWGRASS ELEM 131,400.000 KWH 126,720.000 KWH
SAWGRASS SPRINGS MIDDLE 167,760.000 KWH 182,400.000 KWH
SEA CASTLE ELEM 152,880.000 KWH 150,000.000 KWH
SEAGULL SCHOOL 98,846.000 KWH 86,766.000 KWH
SEMINOLE MIDDLE 224,880.000 KWH 165,720.000 KWH
SHERIDAN HILLS ELEM 81,597.000 KWH 79,678.000 KWH
SHERIDAN PARK ELEM 114,240.000 KWH 104,640.000 KWH
SHERIDAN VOCATIONAL 355,200.000 KWH 269,520.000 KWH
SILVER LAKES ELEMENTARY 65,160.000 KWH 92,400.000 KWH
SILVER LAKES MIDDLE 205,200.000 KWH 145,320.000 KWH
SILVER PALMS ELEM 143,160.000 KWH 125,520.000 KWH
SILVER RIDGE ELEM 181,200.000 KWH 169,200.000 KWH
SILVER SHORES ELEMENTARY 129,360.000 KWH 107,040.000 KWH
SILVER TRAIL MIDDLE 225,120.000 KWH 212,400.000 KWH
SOUTH AREA BUS PARKING 33,027.000 KWH 33,974.000 KWH
SOUTH AREA MAINTENANCE 19,751.000 KWH 15,583.000 KWH
SOUTH BROWARD HIGH 439,214.000 KWH 379,183.000 KWH
SOUTH PLANTATION HIGH 411,305.000 KWH 340,386.000 KWH
SOUTH WEST BUS LOT 321.000 KWH 19,570.000 KWH
STEPHEN FOSTER ELEM 122,556.000 KWH 115,998.000 KWH
STIRLING ELEM 92,040.000 KWH 84,600.000 KWH
STONEMAN DOUGLAS HIGH 470,800.000 KWH 403,200.000 KWH
STRANAHAN HIGH 371,920.000 KWH 293,659.000 KWH
SUNLAND PARK ELEM 118,320.000 KWH 102,240.000 KWH
SUNRISE MIDDLE 262,212.000 KWH 200,877.000 KWH
SUNSET LAKES ELEMENTARY 77,280.000 KWH 172,920.000 KWH
SUNSET SCHOOL 135,192.000 KWH 98,472.000 KWH
SUNSHINE ELEMENTARY 107,242.000 KWH 106,116.000 KWH
TAMARAC ELEM 213,990.000 KWH 135,840.000 KWH
TARAVELLA HIGH 413,704.000 KWH 425,313.000 KWH
TECHNOLOGY AND SUPPORT SERVICE 387,600.000 KWH 404,640.000 KWH
TEDDER ELEMENTARY SCHOOL 141,238.000 KWH 106,220.000 KWH
TEQUESTA TRACE MIDDLE 228,000.000 KWH 202,440.000 KWH
THE QUEST CENTER 89,760.000 KWH 98,640.000 KWH
THURGOOD MARSHALL ELEM 99,624.000 KWH 101,784.000 KWH
TRADEWINDS ELEM 190,680.000 KWH 183,720.000 KWH
TRANSPORTATION SERVICE ANNEX .000 KWH 3,120.000 KWH
TROPICAL ELEM 105,095.000 KWH 102,608.000 KWH
TWIN LAKES ADMIN 55,440.000 KWH 60,240.000 KWH
TWIN LAKES ANNEX/NEW WHSE 3,441.000 KWH 4,151.000 KWH
TWIN LAKES COMPLEX 97,698.000 KWH 97,625.000 KWH
VEHICLE MAINTENANCE 81,360.000 KWH 79,680.000 KWH
VILLAGE ELEM 160,200.000 KWH 186,360.000 KWH
VIRGINIA YOUNG ELEM 112,080.000 KWH 86,160.000 KWH
WALKER ELEM 233,573.000 KWH 170,881.000 KWH
WALTER C YOUNG MIDDLE 402,978.000 KWH 397,534.000 KWH
WATKINS ELEM 141,480.000 KWH 123,240.000 KWH
WELLEBY ELEM 97,680.000 KWH 103,200.000 KWH
WEST BROWARD HIG/LLL .000 KWH 384,000.000 KWH
WEST CENTRAL BUS COMPLEX 70,551.000 KWH 70,578.000 KWH
WEST HOLLYWOOD ELEM 110,640.000 KWH 131,520.000 KWH
WESTCHESTER ELEMENTARY 130,480.000 KWH 122,629.000 KWH
WESTERN HIGH 392,659.000 KWH 343,972.000 KWH
WESTGLADES MIDDLE 250,560.000 KWH 238,080.000 KWH
WESTPINE MIDDLE 157,200.000 KWH 158,880.000 KWH
WESTWOOD HEIGHTS ELEM 156,047.000 KWH 124,277.000 KWH
WHIDDON-ROGERS ED CENTER 144,800.000 KWH 115,200.000 KWH
WHISPERING PINES 75,960.000 KWH 72,360.000 KWH
WILLIAM DANDY MIDDLE 212,160.000 KWH 165,000.000 KWH
WILTON MANORS ELEM 135,480.000 KWH 124,800.000 KWH
WINGATE OAKS CTR 94,440.000 KWH 84,720.000 KWH
WINSTON PARK ELEM 157,920.000 KWH 137,760.000 KWH