Utility Savings
Building Name
Jul-08
Jul-09
APOLLO MIDDLE 218,640.000 KWH 234,240.000 KWH
ARTHUR ASHE MIDDLE 318,000.000 KWH 249,200.000 KWH
ATLANTIC VOC CENTER 599,099.000 KWH 588,602.000 KWH
ATLANTIC WEST ELEM 143,040.000 KWH 114,600.000 KWH
ATTUCKS MIDDLE 215,520.000 KWH 226,800.000 KWH
BAIR MIDDLE 162,000.000 KWH 170,160.000 KWH
BANYAN ELEM 102,120.000 KWH 108,360.000 KWH
BAYVIEW ELEM 79,080.000 KWH 78,240.000 KWH
BECON 270,640.000 KWH 189,640.000 KWH
BENNETT ELEM 124,800.000 KWH 109,920.000 KWH
BETHUNE ELEM 204,480.000 KWH 178,200.000 KWH
BOULEVARD HEIGHTS ELEM 122,160.000 KWH 96,600.000 KWH
BOYD ANDERSON HIGH 478,754.000 KWH 508,535.000 KWH
BRIGHT HORIZONS CTR 109,920.000 KWH 126,240.000 KWH
BROADVIEW ELEM 125,911.000 KWH 111,792.000 KWH
BROWARD ESTATES ELEM 139,112.000 KWH 252,271.000 KWH
BROWARD FIRE ACADEMY 36,574.000 KWH 42,107.000 KWH
CASTLE HILL ELEM 135,720.000 KWH 99,780.000 KWH
CENTRAL PARK ELEM 138,720.000 KWH 151,200.000 KWH
CHALLENGER ELEMENTARY 140,160.000 KWH 130,800.000 KWH
CHAPEL TRAIL ELEM 175,636.000 KWH 151,080.000 KWH
CHARLES DREW ELEM 104,640.000 KWH 91,320.000 KWH
COCONUT CREEK ELEM 73,213.000 KWH 67,034.000 KWH
COCONUT CREEK HIGH 290,986.000 KWH 253,255.000 KWH
COCONUT PALM ELEMENTARY 144,000.000 KWH 111,960.000 KWH
COLBERT ELEM 120,960.000 KWH 74,640.000 KWH
COLLINS ELEM 60,960.000 KWH 71,520.000 KWH
COOPER CITY COMM 30,840.000 KWH 28,440.000 KWH
COMMUNITY SCHOOL NORTH .000 KWH 11,911.000 KWH
COMMUNITY SCHOOL SOUTH 4,342.000 KWH 5,379.000 KWH
COOPER CITY ELEM 103,680.000 KWH 130,800.000 KWH
COOPER CITY HIGH 616,362.000 KWH 500,074.000 KWH
CORAL COVE ELEMENTARY 113,520.000 KWH 81,120.000 KWH
CORAL GLADES HIGH 410,640.000 KWH 428,880.000 KWH
CORAL PARK ELEM 100,800.000 KWH 106,200.000 KWH
CORAL SPRINGS ELEM 120,240.000 KWH 117,840.000 KWH
CORAL SPRINGS HIGH 401,641.000 KWH 366,911.000 KWH
CORAL SPRINGS MIDDLE 240,040.000 KWH 207,640.000 KWH
COUNTRY HILLS ELEM 150,960.000 KWH 132,120.000 KWH
COUNTRY ISLES ELEM 146,640.000 KWH 263,880.000 KWH
CRESTHAVEN ELEM 95,280.000 KWH 99,120.000 KWH
CROISSANT PARK ELEM 100,332.000 KWH 94,127.000 KWH
CROSS CREEK 65,040.000 KWH 64,560.000 KWH
CRYSTAL LAKE COMM SCHOOL 11,685.000 KWH 11,768.000 KWH
CRYSTAL LAKE MIDDLE 221,464.000 KWH 194,831.000 KWH
CYPRESS BAY HIGH 458,400.000 KWH 470,000.000 KWH
CYPRESS BAY HIGH ANNEX 74,400.000 KWH 62,400.000 KWH
CYPRESS ELEM 92,160.000 KWH 104,640.000 KWH
CYPRESS RUN ALTERNATIVE 87,282.000 KWH 82,025.000 KWH
DANIA ELEM 138,095.000 KWH 96,304.000 KWH
DAVE THOMAS ED CENTER (WEST) 117,360.000 KWH 86,400.000 KWH
DAVE THOMAS EDUCATION CENTER 48,984.000 KWH 50,713.000 KWH
DAVIE ELEM 95,319.000 KWH 86,370.000 KWH
DEERFIELD BEACH ELEM 203,400.000 KWH 136,648.000 KWH
DEERFIELD BEACH HIGH 351,851.000 KWH 340,188.000 KWH
DEERFIELD BEACH MID 252,518.000 KWH 262,291.000 KWH
DEERFIELD PARK ELEM 101,520.000 KWH 128,880.000 KWH
DILLARD ELEM 109,080.000 KWH 119,640.000 KWH
DILLARD HIGH COMM 6,832.000 KWH 586,345.000 KWH
DILLARD HIGH SCHOOL 593,922.000 KWH 6,960.000 KWH
DOLPHIN BAY ELEMENTARY 100,080.000 KWH 98,880.000 KWH
DREW RESOURCE CTR 72,685.000 KWH 88,793.000 KWH
DRIFTWOOD ELEM 110,017.000 KWH 84,435.000 KWH
DRIFTWOOD MIDDLE 440,339.000 KWH 343,680.000 KWH
EAGLE POINT ELEM 198,960.000 KWH 168,120.000 KWH
EAGLE RIDGE ELEM 201,120.000 KWH 52,680.000 KWH
ECIA SPECIAL PROGRAMS 32,989.000 KWH 30,433.000 KWH
EDGEWOOD CENTER 56,416.000 KWH 86,776.000 KWH
ELY HIGH 573,390.000 KWH 589,416.000 KWH
EMBASSY CREEK ELEM 95,400.000 KWH 98,280.000 KWH
ENDEAVOR LEARNING CENTER 79,200.000 KWH 51,360.000 KWH
EVERGLADES ELEMENTARY 211,510.000 KWH 154,850.000 KWH
EVERGLADES HIGH 485,640.000 KWH 388,200.000 KWH
FAIRWAY ELEM 182,880.000 KWH 149,640.000 KWH
FALCON COVE MIDDLE 375,801.000 KWH 256,296.000 KWH
FLAMINGO ELEM 125,728.000 KWH 62,248.000 KWH
FLANAGAN HIGH 447,433.000 KWH 472,436.000 KWH
FLORANADA ELEM 116,976.000 KWH 103,296.000 KWH
FOREST GLEN MIDDLE 197,982.000 KWH 204,560.000 KWH
FOREST HILLS ELEM 118,680.000 KWH 114,000.000 KWH
FORT LAUDERDALE HIGH 575,413.000 KWH 382,201.000 KWH
FOX TRAIL ELEMENTARY 136,800.000 KWH 133,440.000 KWH
GATOR RUN ELEMENTARY 236,640.000 KWH 184,320.000 KWH
GLADES MIDDLE 324,000.000 KWH 221,600.000 KWH
GRIFFIN ELEM 68,280.000 KWH 76,800.000 KWH
GULFSTREAM MIDDLE SCHOOL 80,640.000 KWH 82,080.000 KWH
HALLANDALE ADULT CENTER 190,262.000 KWH 176,866.000 KWH
HALLANDALE ELEM 156,480.000 KWH 165,120.000 KWH
HALLANDALE HIGH 275,522.000 KWH 204,657.000 KWH
HARBORDALE ELEM 34,848.000 KWH 59,208.000 KWH
HAWKES BLUFF ELEM 158,420.000 KWH 114,962.000 KWH
HOLLYWOOD CENTRAL AUDITORIUM 47,940.000 KWH 49,980.000 KWH
HOLLYWOOD CENTRAL ELEM 89,760.000 KWH 79,080.000 KWH
HOLLYWOOD HILLS COMMUNITY 4,680.000 KWH 3,165.000 KWH
HOLLYWOOD HILLS ELEMENTARY 168,000.000 KWH 224,880.000 KWH
HOLLYWOOD HILLS HIGH 348,036.000 KWH 343,099.000 KWH
HOLLYWOOD PARK ELEM 83,280.000 KWH 60,720.000 KWH
HORIZON ELEM 130,560.000 KWH 81,840.000 KWH
HORTT ADMIN SITE 76,790.000 KWH 59,210.000 KWH
INDIAN RIDGE MIDDLE 256,895.000 KWH 207,987.000 KWH
INDIAN TRACE ELEM 126,360.000 KWH 95,520.000 KWH
JAMES HUNT ELEMENTARY 114,960.000 KWH 102,720.000 KWH
KATHLEEN WRIGHT ADMIN 475,278.000 KWH 389,011.000 KWH
LAKE FOREST ELEM 200,040.000 KWH 145,800.000 KWH
LAKESIDE ELEMENTARY 106,560.000 KWH 79,920.000 KWH
LANIER JAMES CENTER 66,960.000 KWH 59,520.000 KWH
LARKDALE ELEM 149,772.000 KWH 107,799.000 KWH
LAUDERDALE LAKES MIDDLE 177,120.000 KWH 127,745.000 KWH
LAUDERDALE MANORS ELEM 223,200.000 KWH 180,600.000 KWH
LAUDERHILL MIDDLE 177,480.000 KWH 132,240.000 KWH
LAUDERHILL MIDDLE/COMM 4,140.000 KWH 5,619.000 KWH
LAUDERHILL PT ELEM 138,720.000 KWH 99,720.000 KWH
LIBERTY ELEMENTARY 175,200.000 KWH 135,360.000 KWH
LLOYD ESTATES ELEM 106,320.000 KWH 155,040.000 KWH
LOCKHART STADIUM 93,801.000 KWH 76,788.000 KWH
LYONS CREEK MIDDLE 282,960.000 KWH 330,000.000 KWH
MANATEE BAY ELEMENTARY 220,546.000 KWH 153,143.000 KWH
MAPLEWOOD ELEM 107,280.000 KWH 103,560.000 KWH
MARGATE ELEM 175,680.000 KWH 134,040.000 KWH
MARGATE MIDDLE 211,370.000 KWH 189,147.000 KWH
MARKHAM ELEM 137,194.000 KWH 107,970.000 KWH
MARTIN LUTHER KING ELEM 151,643.000 KWH 112,364.000 KWH
MCARTHUR HIGH 455,246.000 KWH 363,277.000 KWH
MCFATTER VO TECH 351,600.000 KWH 321,120.000 KWH
MCNAB ELEMENTARY 114,960.000 KWH 130,823.000 KWH
MCNICOL MIDDLE 293,280.000 KWH 254,400.000 KWH
MEADOWBROOK ELEM 117,879.000 KWH 160,320.000 KWH
MILLENNIUM MIDDLE 288,480.000 KWH 318,000.000 KWH
MIRAMAR ELEM 128,400.000 KWH 104,280.000 KWH
MIRAMAR HIGH 460,492.000 KWH 341,377.000 KWH
MIRROR LAKE ELEM 73,440.000 KWH 73,200.000 KWH
MONARCH HIGH 412,400.000 KWH 304,800.000 KWH
MORROW ELEM 90,840.000 KWH 109,200.000 KWH
MULTICULTURAL CENTER 17,160.000 KWH 12,000.000 KWH
N ANDREWS GARDENS ELEM 130,584.000 KWH 163,464.000 KWH
NEW RENAISSANCE MIDDLE 146,728.000 KWH 158,784.000 KWH
NEW RIVER MIDDLE SCHOOL 179,184.000 KWH 100,704.000 KWH
NOB HILL ELEM 190,080.000 KWH 167,040.000 KWH
NORCREST ELEM 80,400.000 KWH 99,960.000 KWH
NORTH AREA MAINT/WHSE 99,935.000 KWH 128,227.000 KWH
NORTH AREA SUPERINTENDENT 36,780.000 KWH 35,520.000 KWH
NORTH BUS PARKING LOT 81,409.000 KWH 81,598.000 KWH
NORTH CENTRAL SUPERINTENDENT 102,060.000 KWH 91,260.000 KWH
NORTH FORK ELEM 163,680.000 KWH 85,800.000 KWH
NORTH LAUDERDALE ELEM 85,920.000 KWH 81,600.000 KWH
NORTH SIDE ELEMENTARY 123,240.000 KWH 107,160.000 KWH
NORTHEAST HIGH 336,538.000 KWH 274,561.000 KWH
NOVA BLANCHE FORMAN/EISENHOWER ELEM 254,800.000 KWH 211,200.000 KWH
NOVA EISENHOWER ELEMENTARY 7,424.000 KWH 7,619.000 KWH
NOVA HIGH 7,928.000 KWH 34,923.000 KWH
NOVA HIGH - MECH PLANT 620,800.000 KWH 670,400.000 KWH
OAKLAND PARK ELEM 148,920.000 KWH 116,040.000 KWH
OAKRIDGE ELEM 96,243.000 KWH 93,828.000 KWH
OLSEN MIDDLE 144,120.000 KWH 179,040.000 KWH
OLSEN MIDDLE ANNEX 140,120.000 KWH 145,400.000 KWH
ORANGEBROOK ELEM 104,640.000 KWH 84,240.000 KWH
ORIOLE ELEM 92,640.000 KWH 89,040.000 KWH
PALM COVE ELEM 123,840.000 KWH 93,840.000 KWH
PALMVIEW ELEM 128,400.000 KWH 118,200.000 KWH
PANTHER RUN ELEM 82,920.000 KWH 90,240.000 KWH
PARK LAKES ELEMENTARY 181,680.000 KWH 186,720.000 KWH
PARK LAKES ELEMENTARY ANNEX 19,648.000 KWH 36,568.000 KWH
PARK RIDGE ELEM 134,760.000 KWH 112,920.000 KWH
PARK SPRINGS ELEM 135,840.000 KWH 114,000.000 KWH
PARK TRAILS ELEMENTARY 191,520.000 KWH 152,400.000 KWH
PARKSIDE ELEMENTARY 162,960.000 KWH 152,640.000 KWH
PARKWAY MIDDLE 324,343.000 KWH 322,312.000 KWH
PASADENA LAKES ELEM 127,660.000 KWH 135,711.000 KWH
PEMBROKE LAKES ELEM 140,160.000 KWH 82,560.000 KWH
PEMBROKE PINES ELEM 106,406.000 KWH 113,125.000 KWH
PERRY ELEM 159,058.000 KWH 96,747.000 KWH
PERRY MIDDLE 111,360.000 KWH 156,960.000 KWH
PETERS ELEM 97,302.000 KWH 92,634.000 KWH
PHYSICAL PLANT OPERATIONS 121,734.000 KWH 112,639.000 KWH
PINE RIDGE CTR 82,080.000 KWH 68,160.000 KWH
PINES LAKES ELEM 108,480.000 KWH 136,800.000 KWH
PINES MIDDLE 200,008.000 KWH 193,288.000 KWH
PINEWOOD ELEM 120,960.000 KWH 121,320.000 KWH
PIONEER MIDDLE 190,672.000 KWH 168,633.000 KWH
PIONEER MIDDLE ANNEX 31,860.000 KWH 66,840.000 KWH
PIPER HIGH 479,252.000 KWH 426,538.000 KWH
PLANTATION ELEM 126,962.000 KWH 109,176.000 KWH
PLANTATION HIGH 362,503.000 KWH 324,204.000 KWH
PLANTATION MIDDLE 209,768.000 KWH 140,817.000 KWH
PLANTATION PARK ELEM 66,837.000 KWH 80,144.000 KWH
POMPANO BEACH ELEM 118,320.000 KWH 107,880.000 KWH
POMPANO BEACH HIGH 337,379.000 KWH 268,556.000 KWH
POMPANO BEACH MIDDLE 254,688.000 KWH 211,248.000 KWH
PPO ZONE 2 - LEASED 120,684.000 KWH 113,895.000 KWH
QUIET WATERS ELEM 20,917.000 KWH 23,509.000 KWH
RAMBLEWOOD ELEM 136,320.000 KWH 160,320.000 KWH
RAMBLEWOOD MIDDLE 112,080.000 KWH 91,920.000 KWH
RICKARDS MIDDLE 318,960.000 KWH 206,946.000 KWH
RIVERGLADES ELEM 193,007.000 KWH 174,236.000 KWH
RIVERLAND ELEM 94,560.000 KWH 99,120.000 KWH
RIVERSIDE ELEM 74,160.000 KWH 102,840.000 KWH
ROCK ISLAND ADMIN 132,120.000 KWH 142,560.000 KWH
ROYAL PALM ELEMENTARY 100,992.000 KWH 82,032.000 KWH
SAFETY DEPARTMENT 160,666.000 KWH 164,450.000 KWH
SANDERS PARK ELEM 102,800.000 KWH 26,400.000 KWH
SANDPIPER ELEM 151,320.000 KWH 156,480.000 KWH
SAWGRASS ELEM 129,480.000 KWH 120,720.000 KWH
SAWGRASS SPRINGS MIDDLE 154,680.000 KWH 175,800.000 KWH
SEA CASTLE ELEM 168,480.000 KWH 136,800.000 KWH
SEAGULL SCHOOL 114,800.000 KWH 105,581.000 KWH
SEMINOLE MIDDLE 227,040.000 KWH 225,000.000 KWH
SHERIDAN HILLS ELEM 94,374.000 KWH 95,878.000 KWH
SHERIDAN PARK ELEM 109,920.000 KWH 112,560.000 KWH
SHERIDAN VOCATIONAL 406,560.000 KWH 373,920.000 KWH
SILVER LAKES ELEMENTARY 102,600.000 KWH 92,880.000 KWH
SILVER LAKES MIDDLE 171,720.000 KWH 149,760.000 KWH
SILVER PALMS ELEM 131,640.000 KWH 96,840.000 KWH
SILVER RIDGE ELEM 194,640.000 KWH 176,760.000 KWH
SILVER SHORES ELEMENTARY 112,320.000 KWH 108,480.000 KWH
SILVER TRAIL MIDDLE 218,640.000 KWH 208,080.000 KWH
SOUTH AREA BUS PARKING 37,993.000 KWH 41,642.000 KWH
SOUTH AREA MAINTENANCE 22,104.000 KWH 22,143.000 KWH
SOUTH BROWARD HIGH 517,800.000 KWH 399,129.000 KWH
SOUTH PLANTATION HIGH 467,176.000 KWH 395,739.000 KWH
SOUTH WEST BUS LOT 3,910.000 KWH 41,386.000 KWH
STEPHEN FOSTER ELEM 123,737.000 KWH 85,457.000 KWH
STIRLING ELEM 71,280.000 KWH 98,040.000 KWH
STONEMAN DOUGLAS HIGH 516,400.000 KWH 452,800.000 KWH
STRANAHAN HIGH 402,698.000 KWH 345,634.000 KWH
SUNLAND PARK ELEM 107,640.000 KWH 63,840.000 KWH
SUNRISE MIDDLE 194,310.000 KWH 193,831.000 KWH
SUNSET LAKES ELEMENTARY 79,440.000 KWH 92,040.000 KWH
SUNSET SCHOOL 113,352.000 KWH 113,232.000 KWH
SUNSHINE ELEMENTARY 99,552.000 KWH 77,494.000 KWH
TAMARAC ELEM 139,200.000 KWH 143,040.000 KWH
TARAVELLA HIGH 444,382.000 KWH 384,337.000 KWH
TECHNOLOGY AND SUPPORT SERVICE 379,440.000 KWH 383,040.000 KWH
TEDDER ELEMENTARY SCHOOL 144,323.000 KWH 146,433.000 KWH
TEQUESTA TRACE MIDDLE 213,000.000 KWH 202,560.000 KWH
THE QUEST CENTER 111,000.000 KWH 101,640.000 KWH
THURGOOD MARSHALL ELEM 96,264.000 KWH 80,064.000 KWH
TRADEWINDS ELEM 155,640.000 KWH 211,440.000 KWH
TRANSPORTATION SERVICE ANNEX 6,360.000 KWH 12,120.000 KWH
TROPICAL ELEM 115,257.000 KWH 122,522.000 KWH
TWIN LAKES ADMIN 66,720.000 KWH 66,960.000 KWH
TWIN LAKES ANNEX/NEW WHSE 3,682.000 KWH 2,065.000 KWH
TWIN LAKES COMPLEX 118,246.000 KWH 117,628.000 KWH
VEHICLE MAINTENANCE 98,880.000 KWH 88,080.000 KWH
VILLAGE ELEM 141,420.000 KWH 156,840.000 KWH
VIRGINIA YOUNG ELEM 67,320.000 KWH 81,720.000 KWH
WALKER ELEM 198,929.000 KWH 186,845.000 KWH
WALTER C YOUNG MIDDLE 471,392.000 KWH 448,043.000 KWH
WATKINS ELEM 140,160.000 KWH 132,000.000 KWH
WELLEBY ELEM 89,040.000 KWH 95,640.000 KWH
WEST BROWARD HIG/LLL 345,600.000 KWH 409,600.000 KWH
WEST CENTRAL BUS COMPLEX 77,226.000 KWH 69,366.000 KWH
WEST HOLLYWOOD ELEM 85,920.000 KWH 80,040.000 KWH
WESTCHESTER ELEMENTARY 96,194.000 KWH 115,678.000 KWH
WESTERN HIGH 440,968.000 KWH 453,041.000 KWH
WESTGLADES MIDDLE 229,200.000 KWH 266,160.000 KWH
WESTPINE MIDDLE 153,960.000 KWH 147,600.000 KWH
WESTWOOD HEIGHTS ELEM 163,254.000 KWH 116,463.000 KWH
WHIDDON-ROGERS ED CENTER 145,200.000 KWH 138,000.000 KWH
WHISPERING PINES 75,000.000 KWH 70,200.000 KWH
WILLIAM DANDY MIDDLE 129,240.000 KWH 133,320.000 KWH
WILTON MANORS ELEM 145,680.000 KWH 104,220.000 KWH
WINGATE OAKS CTR 98,400.000 KWH 6,000.000 KWH
WINSTON PARK ELEM 130,800.000 KWH 144,480.000 KWH