Utility Savings
Building Name
July-07
July-08
APOLLO MIDDLE 206,160.000 KWH 218,640.000 KWH
ARTHUR ASHE MIDDLE 293,200.000 KWH 318,000.000 KWH
ATLANTIC VOC CENTER 605,298.000 KWH 599,099.000 KWH
ATLANTIC WEST ELEM 166,080.000 KWH 143,040.000 KWH
ATTUCKS MIDDLE 300,376.000 KWH 215,520.000 KWH
BAIR MIDDLE 201,360.000 KWH 162,000.000 KWH
BANYAN ELEM 130,800.000 KWH 102,120.000 KWH
BAYVIEW ELEM 75,840.000 KWH 79,080.000 KWH
BECON 211,520.000 KWH 270,640.000 KWH
BENNETT ELEM 96,240.000 KWH 124,800.000 KWH
BETHUNE ELEM 267,000.000 KWH 204,480.000 KWH
BOULEVARD HEIGHTS ELEM 90,840.000 KWH 122,160.000 KWH
BOYD ANDERSON HIGH 453,480.000 KWH 478,754.000 KWH
BRIGHT HORIZONS CTR 129,360.000 KWH 109,920.000 KWH
BROADVIEW ELEM 127,665.000 KWH 125,911.000 KWH
BROWARD EDUCATION FOUNDATION 18,701.000 KWH .000 KWH
BROWARD ESTATES ELEM 163,606.000 KWH 139,112.000 KWH
BROWARD FIRE ACADEMY 40,320.000 KWH 36,574.000 KWH
CASTLE HILL ELEM 104,640.000 KWH 135,720.000 KWH
CENTRAL PARK ELEM 36,720.000 KWH .000 KWH
CHALLENGER ELEMENTARY 177,720.000 KWH 138,720.000 KWH
CHAPEL TRAIL ELEM 161,280.000 KWH 140,160.000 KWH
CHARLES DREW ELEM 178,248.000 KWH 175,636.000 KWH
COCONUT CREEK ELEM 92,040.000 KWH 104,640.000 KWH
COCONUT CREEK HIGH 98,951.000 KWH 73,213.000 KWH
COCONUT PALM ELEMENTARY 361,587.000 KWH 290,986.000 KWH
COLBERT ELEM 147,720.000 KWH 144,000.000 KWH
COLLINS ELEM 110,160.000 KWH 120,960.000 KWH
COOPER CITY COMM 73,680.000 KWH 60,960.000 KWH
COOPER CITY ELEM 11,262.000 KWH 4,342.000 KWH
COOPER CITY HIGH 81,600.000 KWH 103,680.000 KWH
CORAL COVE ELEMENTARY 590,816.000 KWH 616,362.000 KWH
CORAL GLADES HIGH 93,360.000 KWH 113,520.000 KWH
CORAL PARK ELEM 420,000.000 KWH 410,640.000 KWH
CORAL SPRINGS ELEM 112,920.000 KWH 100,800.000 KWH
CORAL SPRINGS COMMUNITY 128,640.000 KWH 120,240.000 KWH
CORAL SPRINGS HIGH 416,518.000 KWH 401,641.000 KWH
CORAL SPRINGS MIDDLE 237,640.000 KWH 240,040.000 KWH
COUNTRY HILLS ELEM 155,400.000 KWH 150,960.000 KWH
COUNTRY ISLES ELEM 180,720.000 KWH 146,640.000 KWH
CRESTHAVEN ELEM 103,680.000 KWH 95,280.000 KWH
CROISSANT PARK ELEM 118,419.000 KWH 100,332.000 KWH
CROSS CREEK 68,700.000 KWH 65,040.000 KWH
CRYSTAL LAKE COMM SCHOOL 12,011.000 KWH 11,685.000 KWH
CRYSTAL LAKE MIDDLE 245,190.000 KWH 221,464.000 KWH
CYPRESS BAY HIGH 484,800.000 KWH 458,400.000 KWH
CYPRESS BAY HIGH ANNEX 272,364.000 KWH 74,400.000 KWH
CYPRESS ELEM 135,600.000 KWH 92,160.000 KWH
CYPRESS RUN ALTERNATIVE 51,876.000 KWH 87,282.000 KWH
DANIA ELEM 117,916.000 KWH 138,095.000 KWH
DAVE THOMAS ED CENTER (WEST) 104,640.000 KWH 117,360.000 KWH
DAVE THOMAS EDUCATION CENTER 46,400.000 KWH 48,984.000 KWH
DAVIE ELEM 163,862.000 KWH 95,319.000 KWH
DEERFIELD BEACH ELEM 142,547.000 KWH 203,400.000 KWH
DEERFIELD BEACH HIGH 388,983.000 KWH 351,851.000 KWH
DEERFIELD BEACH MID 283,355.000 KWH 252,518.000 KWH
DEERFIELD PARK ELEM 153,360.000 KWH 101,520.000 KWH
DILLARD ELEM 129,720.000 KWH 109,080.000 KWH
DILLARD HIGH COMM 5,504.000 KWH 6,832.000 KWH
DILLARD HIGH SCHOOL 654,688.000 KWH 593,922.000 KWH
DOLPHIN BAY ELEMENTARY 105,120.000 KWH 100,080.000 KWH
DREW RESOURCE CTR 93,789.000 KWH 72,685.000 KWH
DRIFTWOOD ELEM 146,357.000 KWH 110,017.000 KWH
DRIFTWOOD MIDDLE 416,022.000 KWH 440,339.000 KWH
EAGLE POINT ELEM 245,160.000 KWH 198,960.000 KWH
EAGLE RIDGE ELEM 136,800.000 KWH 201,120.000 KWH
ECIA SPECIAL PROGRAMS 41,387.000 KWH 32,989.000 KWH
EDGEWOOD CENTER 81,736.000 KWH 56,416.000 KWH
ELY HIGH 644,793.000 KWH 573,390.000 KWH
EMBASSY CREEK ELEM 92,400.000 KWH 95,400.000 KWH
ENDEAVOR LEARNING CENTER 31,080.000 KWH 79,200.000 KWH
EVERGLADES 9TH GRADE ANNEX 159,698.000 KWH 120,684.000 KWH
EVERGLADES ELEMENTARY 205,854.000 KWH 211,510.000 KWH
EVERGLADES HIGH 712,200.000 KWH 485,640.000 KWH
FAIRWAY ELEM 205,920.000 KWH 182,880.000 KWH
FALCON COVE MIDDLE 394,040.000 KWH 375,801.000 KWH
FLAMINGO ELEM 117,448.000 KWH 125,728.000 KWH
FLANAGAN HIGH 583,104.000 KWH 447,433.000 KWH
FLORANADA ELEM 120,696.000 KWH 116,976.000 KWH
FOREST GLEN MIDDLE 264,452.000 KWH 197,982.000 KWH
FOREST HILLS ELEM 124,320.000 KWH 118,680.000 KWH
FORT LAUDERDALE HIGH 478,645.000 KWH 575,413.000 KWH
FORT LAUDERDALE HIGH ANNEX 139,920.000 KWH 136,800.000 KWH
FOX TRAIL ELEMENTARY 234,960.000 KWH 236,640.000 KWH
GATOR RUN ELEMENTARY .000 KWH 324,000.000 KWH
GRIFFIN ELEM 104,160.000 KWH 68,280.000 KWH
GULFSTREAM MIDDLE SCHOOL 109,080.000 KWH 80,640.000 KWH
HALLANDALE ADULT CENTER 205,669.000 KWH 190,262.000 KWH
HALLANDALE ELEM 212,640.000 KWH 156,480.000 KWH
HALLANDALE HIGH 329,406.000 KWH 275,522.000 KWH
HARBORDALE ELEM 101,976.000 KWH 34,848.000 KWH
HAWKES BLUFF ELEM 141,849.000 KWH 158,420.000 KWH
HOLLYWOOD CENTRAL AUDITORIUM 47,400.000 KWH 47,940.000 KWH
HOLLYWOOD CENTRAL ELEM 88,920.000 KWH 89,760.000 KWH
HOLLYWOOD HILLS COMMUNITY .000 KWH 4,680.000 KWH
HOLLYWOOD HILLS ELEMENTARY 83,040.000 KWH 168,000.000 KWH
HOLLYWOOD HILLS HIGH 327,392.000 KWH 348,036.000 KWH
HOLLYWOOD PARK ELEM 97,920.000 KWH 83,280.000 KWH
HORIZON ELEM 116,640.000 KWH 130,560.000 KWH
HORTT ADMIN SITE 81,390.000 KWH 76,790.000 KWH
INDIAN RIDGE MIDDLE 297,569.000 KWH 256,895.000 KWH
INDIAN TRACE ELEM 135,720.000 KWH 126,360.000 KWH
JAMES HUNT ELEMENTARY 134,280.000 KWH 114,960.000 KWH
KATHLEEN WRIGHT ADMIN 456,426.000 KWH 475,278.000 KWH
LAKE FOREST ELEM 187,608.000 KWH 200,040.000 KWH
LAKESIDE ELEMENTARY 103,680.000 KWH 106,560.000 KWH
LANIER JAMES CENTER 79,200.000 KWH 66,960.000 KWH
LARKDALE ELEM 125,890.000 KWH 149,772.000 KWH
LAUDERDALE LAKES MIDDLE 181,800.000 KWH 177,120.000 KWH
LAUDERDALE MANORS ELEM 228,000.000 KWH 223,200.000 KWH
LAUDERHILL MIDDLE 185,040.000 KWH 177,480.000 KWH
LAUDERHILL MIDDLE/COMM 5,049.000 KWH 4,140.000 KWH
LAUDERHILL PT ELEM 112,560.000 KWH 138,720.000 KWH
LIBERTY ELEMENTARY 208,560.000 KWH 175,200.000 KWH
LLOYD ESTATES ELEM 119,280.000 KWH 106,320.000 KWH
LOCKHART STADIUM 47,250.000 KWH 93,801.000 KWH
LYONS CREEK MIDDLE 306,480.000 KWH 282,960.000 KWH
MANATEE BAY ELEMENTARY 135,392.000 KWH 220,546.000 KWH
MAPLEWOOD ELEM 155,760.000 KWH 107,280.000 KWH
MARGATE ELEM 150,780.000 KWH 175,680.000 KWH
MARGATE MIDDLE 281,177.000 KWH 211,370.000 KWH
MARKHAM ELEM 110,689.000 KWH 137,194.000 KWH
MARTIN LUTHER KING ELEM 164,306.000 KWH 151,643.000 KWH
MCARTHUR HIGH 408,174.000 KWH 455,246.000 KWH
MCFATTER VO TECH 368,160.000 KWH 351,600.000 KWH
MCNAB ELEMENTARY 150,480.000 KWH 114,960.000 KWH
MCNICOL MIDDLE 291,120.000 KWH 293,280.000 KWH
MEADOWBROOK ELEM 102,687.000 KWH 117,879.000 KWH
MILLENNIUM MIDDLE 293,040.000 KWH 288,480.000 KWH
MIRAMAR ELEM 162,600.000 KWH 128,400.000 KWH
MIRAMAR HIGH 513,205.000 KWH 460,492.000 KWH
MIRROR LAKE ELEM 78,720.000 KWH 73,440.000 KWH
MONARCH HIGH 355,200.000 KWH 412,400.000 KWH
MORROW ELEM 114,480.000 KWH 90,840.000 KWH
MULTICULTURAL CENTER 29,640.000 KWH 17,160.000 KWH
N ANDREWS GARDENS ELEM 213,120.000 KWH 130,584.000 KWH
NEW RENAISSANCE MIDDLE 167,353.000 KWH 146,728.000 KWH
NEW RIVER MIDDLE SCHOOL 198,204.000 KWH 179,184.000 KWH
NOB HILL ELEM 242,280.000 KWH 190,080.000 KWH
NORCREST ELEM 108,840.000 KWH 80,400.000 KWH
NORTH AREA MAINT/WHSE 129,624.000 KWH 99,935.000 KWH
NORTH AREA SUPERINTENDENT 29,760.000 KWH 36,780.000 KWH
NORTH BUS PARKING LOT 81,181.000 KWH 81,409.000 KWH
NORTH CENTRAL SUPERINTENDENT 5,314.000 KWH .000 KWH
NORTH FORK ELEM 107,160.000 KWH 102,060.000 KWH
NORTH LAUDERDALE ELEM 128,280.000 KWH 163,680.000 KWH
NORTH SIDE ELEMENTARY 116,160.000 KWH 85,920.000 KWH
NORTH WEST TRANSPORTATION 120,240.000 KWH 123,240.000 KWH
NORTHEAST HIGH 295,864.000 KWH 336,538.000 KWH
NOVA BLANCHE FORMAN/EISENHOWER ELEM 272,400.000 KWH 254,800.000 KWH
NOVA EISENHOWER ELEMENTARY 9,732.000 KWH 7,424.000 KWH
NOVA HIGH 6,679.000 KWH 7,928.000 KWH
NOVA HIGH - MECH PLANT 744,000.000 KWH 620,800.000 KWH
NOVA HIGH COMM/GED 486.000 KWH .000 KWH
OAKLAND PARK ELEM 182,520.000 KWH 148,920.000 KWH
OAKRIDGE ELEM 142,628.000 KWH 96,243.000 KWH
OLSEN MIDDLE 183,000.000 KWH 144,120.000 KWH
OLSEN MIDDLE ANNEX 117,320.000 KWH 140,120.000 KWH
ORANGEBROOK ELEM 347,280.000 KWH 104,640.000 KWH
ORIOLE ELEM 108,960.000 KWH 92,640.000 KWH
PALM COVE ELEM 108,120.000 KWH 123,840.000 KWH
PALMVIEW ELEM 181,440.000 KWH 128,400.000 KWH
PANTHER RUN ELEM 94,320.000 KWH 82,920.000 KWH
PARK LAKES ELEMENTARY 180,720.000 KWH 181,680.000 KWH
PARK LAKES ELEMENTARY ANNEX 43,464.000 KWH 19,648.000 KWH
PARK RIDGE ELEM 108,000.000 KWH 134,760.000 KWH
PARK SPRINGS ELEM 122,160.000 KWH 135,840.000 KWH
PARK TRAILS ELEMENTARY 164,280.000 KWH 191,520.000 KWH
PARKSIDE ELEMENTARY 157,680.000 KWH 162,960.000 KWH
PARKWAY MIDDLE 375,229.000 KWH 324,343.000 KWH
PASADENA LAKES ELEM 192,668.000 KWH 127,660.000 KWH
PEMBROKE LAKES ELEM 132,540.000 KWH 140,160.000 KWH
PEMBROKE PINES ELEM 120,950.000 KWH 106,406.000 KWH
PERRY ELEM 148,654.000 KWH 159,058.000 KWH
PERRY MIDDLE 210,480.000 KWH 111,360.000 KWH
PETERS ELEM 88,719.000 KWH 97,302.000 KWH
PHYSICAL PLANT OPERATIONS 120,240.000 KWH 121,440.000 KWH
PINE RIDGE CTR 87,840.000 KWH 82,080.000 KWH
PINES LAKES ELEM 164,520.000 KWH 108,480.000 KWH
PINES MIDDLE 290,271.000 KWH 200,008.000 KWH
PINEWOOD ELEM 119,760.000 KWH 120,960.000 KWH
PIONEER MIDDLE 201,074.000 KWH 190,672.000 KWH
PIONEER MIDDLE ANNEX 31,740.000 KWH 31,860.000 KWH
PIPER HIGH 560,258.000 KWH 479,252.000 KWH
PLANTATION ELEM 166,055.000 KWH 126,962.000 KWH
PLANTATION HIGH 422,203.000 KWH 362,503.000 KWH
PLANTATION MIDDLE 216,576.000 KWH 209,768.000 KWH
PLANTATION PARK ELEM 78,071.000 KWH 66,837.000 KWH
POMPANO BEACH ELEM 154,680.000 KWH 118,320.000 KWH
POMPANO BEACH HIGH 400,255.000 KWH 337,379.000 KWH
POMPANO BEACH MIDDLE 256,896.000 KWH 254,688.000 KWH
PPO ZONE 2 - LEASED 23,131.000 KWH 20,917.000 KWH
QUIET WATERS ELEM 186,060.000 KWH 136,320.000 KWH
RAMBLEWOOD ELEM 139,680.000 KWH 112,080.000 KWH
RAMBLEWOOD MIDDLE 255,840.000 KWH 318,960.000 KWH
RICKARDS MIDDLE 208,500.000 KWH 193,007.000 KWH
RIVERGLADES ELEM 96,960.000 KWH 94,560.000 KWH
RIVERLAND ELEM 82,440.000 KWH 74,160.000 KWH
RIVERSIDE ELEM 140,880.000 KWH 132,120.000 KWH
ROCK ISLAND ADMIN 109,992.000 KWH 100,992.000 KWH
ROYAL PALM ELEMENTARY 171,350.000 KWH 160,666.000 KWH
SANDERS PARK ELEM 101,600.000 KWH 102,800.000 KWH
SANDPIPER ELEM 93,960.000 KWH 151,320.000 KWH
SAWGRASS ELEM 144,360.000 KWH 129,480.000 KWH
SAWGRASS SPRINGS MIDDLE 227,160.000 KWH 154,680.000 KWH
SEA CASTLE ELEM 167,040.000 KWH 168,480.000 KWH
SEAGULL SCHOOL 124,448.000 KWH 114,800.000 KWH
SEMINOLE MIDDLE 201,000.000 KWH 227,040.000 KWH
SHERIDAN HILLS ELEM 82,647.000 KWH 94,374.000 KWH
SHERIDAN PARK ELEM 126,960.000 KWH 109,920.000 KWH
SHERIDAN VOCATIONAL 461,040.000 KWH 406,560.000 KWH
SILVER LAKES ELEMENTARY 188,760.000 KWH 102,600.000 KWH
SILVER LAKES MIDDLE 202,200.000 KWH 171,720.000 KWH
SILVER PALMS ELEM 132,000.000 KWH 131,640.000 KWH
SILVER RIDGE ELEM 225,960.000 KWH 194,640.000 KWH
SILVER SHORES ELEMENTARY 169,320.000 KWH 112,320.000 KWH
SILVER TRAIL MIDDLE 288,480.000 KWH 218,640.000 KWH
SOUTH AREA BUS PARKING 44,500.000 KWH 37,993.000 KWH
SOUTH AREA MAINTENANCE 30,936.000 KWH 22,104.000 KWH
SOUTH BROWARD HIGH 436,093.000 KWH 517,800.000 KWH
SOUTH PLANTATION HIGH 494,733.000 KWH 467,176.000 KWH
SOUTH WEST BUS LOT 5,066.000 KWH 3,910.000 KWH
STEPHEN FOSTER ELEM 137,774.000 KWH 123,737.000 KWH
STIRLING ELEM 91,560.000 KWH 71,280.000 KWH
STONEMAN DOUGLAS HIGH 463,600.000 KWH 516,400.000 KWH
STRANAHAN HIGH 575,487.000 KWH 402,698.000 KWH
SUNLAND PARK ELEM 105,120.000 KWH 107,640.000 KWH
SUNRISE MIDDLE 218,138.000 KWH 194,310.000 KWH
SUNSET LAKES ELEMENTARY 44,280.000 KWH 79,440.000 KWH
SUNSET SCHOOL 147,552.000 KWH 113,352.000 KWH
SUNSHINE ELEMENTARY 115,622.000 KWH 99,552.000 KWH
TAMARAC ELEM 258,510.000 KWH 139,200.000 KWH
TARAVELLA HIGH 425,947.000 KWH 444,382.000 KWH
TECHNOLOGY AND SUPPORT SERVICE 352,320.000 KWH 379,440.000 KWH
TEDDER ELEMENTARY SCHOOL 165,474.000 KWH 144,323.000 KWH
TEQUESTA TRACE MIDDLE 217,920.000 KWH 213,000.000 KWH
THE QUEST CENTER 110,160.000 KWH 111,000.000 KWH
THURGOOD MARSHALL ELEM 94,344.000 KWH 96,264.000 KWH
TRADEWINDS ELEM 167,280.000 KWH 155,640.000 KWH
TRANSPORTATION SERVICES ANNEX .000 KWH 6,360.000 KWH
TROPICAL ELEM 146,471.000 KWH 115,257.000 KWH
TWIN LAKES ADMIN 76,560.000 KWH 66,720.000 KWH
TWIN LAKES ANNEX/NEW WHSE 4,284.000 KWH 3,682.000 KWH
TWIN LAKES COMPLEX 123,947.000 KWH 118,540.000 KWH
VEHICLE MAINTENANCE 109,680.000 KWH 98,880.000 KWH
VILLAGE ELEM 121,140.000 KWH 141,420.000 KWH
VIRGINIA YOUNG ELEM 87,960.000 KWH 67,320.000 KWH
WALKER ELEM 273,380.000 KWH 198,929.000 KWH
WALTER C YOUNG MIDDLE 417,636.000 KWH 471,392.000 KWH
WATKINS ELEM 156,360.000 KWH 140,160.000 KWH
WELLEBY ELEM 98,880.000 KWH 89,040.000 KWH
WEST BROWARD HIG/LLL .000 KWH 345,600.000 KWH
WEST CENTRAL BUS COMPLEX 65,962.000 KWH 77,226.000 KWH
WEST HOLLYWOOD ELEM 82,680.000 KWH 85,920.000 KWH
WESTCHESTER ELEMENTARY 119,530.000 KWH 96,194.000 KWH
WESTERN HIGH 465,237.000 KWH 440,968.000 KWH
WESTGLADES MIDDLE 229,920.000 KWH 229,200.000 KWH
WESTPINE MIDDLE 169,920.000 KWH 153,960.000 KWH
WESTWOOD HEIGHTS ELEM 192,167.000 KWH 163,254.000 KWH
WHIDDON-ROGERS ED CENTER 140,400.000 KWH 145,200.000 KWH
WHISPERING PINES 80,760.000 KWH 75,000.000 KWH
WILLIAM DANDY MIDDLE 185,520.000 KWH 129,240.000 KWH
WILTON MANORS ELEM 152,640.000 KWH 145,680.000 KWH
WINGATE OAKS CTR 131,520.000 KWH 98,400.000 KWH
WINSTON PARK ELEM 156,000.000 KWH 130,800.000 KWH