Building
Name |
Mar-08 |
Mar-09 |
| APOLLO
MIDDLE |
207,600.000
KWH |
190,800.000
KWH |
| ARTHUR
ASHE MIDDLE |
320,800.000
KWH |
277,200.000
KWH |
| ATLANTIC
VOC CENTER |
508,427.000
KWH |
468,072.000
KWH |
| ATLANTIC
WEST ELEM |
158,040.000
KWH |
125,160.000
KWH |
| ATTUCKS
MIDDLE |
212,512.000
KWH |
228,480.000
KWH |
| BAIR
MIDDLE |
179,520.000
KWH |
177,840.000
KWH |
| BANYAN
ELEM |
132,720.000
KWH |
127,440.000
KWH |
| BAYVIEW
ELEM |
69,240.000
KWH |
76,560.000
KWH |
| BECON |
254,440.000
KWH |
234,400.000
KWH |
| BENNETT
ELEM |
74,400.000
KWH |
90,240.000
KWH |
| BETHUNE
ELEM |
164,880.000
KWH |
169,680.000
KWH |
| BOULEVARD
HEIGHTS ELEM |
100,680.000
KWH |
111,600.000
KWH |
| BOYD
ANDERSON HIGH |
399,032.000
KWH |
379,581.000
KWH |
| BRIGHT
HORIZONS CTR |
91,440.000
KWH |
90,480.000
KWH |
| BROADVIEW
ELEM |
108,950.000
KWH |
113,146.000
KWH |
| BROWARD
EDUCATION FOUNDATION |
1,169.000
KWH |
.000
KWH |
| BROWARD
ESTATES ELEM |
120,388.000
KWH |
89,651.000
KWH |
| BROWARD
FIRE ACADEMY |
27,960.000
KWH |
28,659.000
KWH |
| CASTLE
HILL ELEM |
120,840.000
KWH |
131,400.000
KWH |
| CENTRAL
PARK ELEM |
150,720.000
KWH |
134,280.000
KWH |
| CHALLENGER
ELEMENTARY |
126,120.000
KWH |
154,200.000
KWH |
| CHAPEL
TRAIL ELEM |
171,820.000
KWH |
163,827.000
KWH |
| CHARLES
DREW ELEM |
112,080.000
KWH |
106,320.000
KWH |
| COCONUT
CREEK ELEM |
96,610.000
KWH |
96,857.000
KWH |
| COCONUT
CREEK HIGH |
351,220.000
KWH |
316,387.000
KWH |
| COCONUT
PALM ELEMENTARY |
144,360.000
KWH |
126,360.000
KWH |
| COLBERT
ELEM |
129,360.000
KWH |
91,680.000
KWH |
| COLLINS
ELEM |
72,000.000
KWH |
59,040.000
KWH |
| COOPER
CITY COMM |
23,160.000
KWH |
18,600.000
KWH |
| COMMUNITY
SCHOOL NORTH |
.000
KWH |
8,718.000
KWH |
| COMMUNITY
SCHOOL SOUTH |
4,667.000
KWH |
5,552.000
KWH |
| COOPER
CITY ELEM |
116,400.000
KWH |
107,520.000
KWH |
| COOPER
CITY HIGH |
537,561.000
KWH |
450,605.000
KWH |
| CORAL
COVE ELEMENTARY |
116,400.000
KWH |
105,600.000
KWH |
| CORAL
GLADES HIGH |
456,960.000
KWH |
348,720.000
KWH |
| CORAL
PARK ELEM |
112,080.000
KWH |
112,560.000
KWH |
| CORAL
SPRINGS ELEM |
116,400.000
KWH |
113,040.000
KWH |
| CORAL
SPRINGS HIGH |
410,431.000
KWH |
417,413.000
KWH |
| CORAL
SPRINGS MIDDLE |
206,871.000
KWH |
202,840.000
KWH |
| COUNTRY
HILLS ELEM |
143,280.000
KWH |
142,200.000
KWH |
| COUNTRY
ISLES ELEM |
161,040.000
KWH |
165,600.000
KWH |
| CRESTHAVEN
ELEM |
90,600.000
KWH |
102,600.000
KWH |
| CROISSANT
PARK ELEM |
124,483.000
KWH |
108,292.000
KWH |
| CROSS
CREEK |
75,420.000
KWH |
73,320.000
KWH |
| CRYSTAL
LAKE COMM SCHOOL |
6,635.000
KWH |
7,050.000
KWH |
| CRYSTAL
LAKE MIDDLE |
185,277.000
KWH |
191,756.000
KWH |
| CYPRESS
BAY HIGH |
488,800.000
KWH |
537,600.000
KWH |
| CYPRESS
BAY HIGH ANNEX |
47,280.000
KWH |
56,880.000
KWH |
| CYPRESS
ELEM |
82,320.000
KWH |
90,720.000
KWH |
| CYPRESS
RUN ALTERNATIVE |
45,603.000
KWH |
63,514.000
KWH |
| DANIA
ELEM |
104,610.000
KWH |
115,478.000
KWH |
| DAVE
THOMAS ED CENTER (WEST) |
103,200.000
KWH |
57,120.000
KWH |
| DAVE
THOMAS EDUCATION CENTER |
38,067.000
KWH |
35,370.000
KWH |
| DAVIE
ELEM |
167,705.000
KWH |
114,456.000
KWH |
| DEERFIELD
BEACH ELEM |
125,880.000
KWH |
143,528.000
KWH |
| DEERFIELD
BEACH HIGH |
339,358.000
KWH |
349,702.000
KWH |
| DEERFIELD
BEACH MID |
231,847.000
KWH |
227,718.000
KWH |
| DEERFIELD
PARK ELEM |
99,360.000
KWH |
109,800.000
KWH |
| DILLARD
ELEM |
123,720.000
KWH |
123,480.000
KWH |
| DILLARD
HIGH COMM |
4,677.000
KWH |
.000
KWH |
| DILLARD
HIGH SCHOOL |
767,873.000
KWH |
684,726.000
KWH |
| DOLPHIN
BAY ELEMENTARY |
116,880.000
KWH |
100,560.000
KWH |
| DREW
RESOURCE CTR |
74,950.000
KWH |
52,833.000
KWH |
| DRIFTWOOD
ELEM |
99,627.000
KWH |
81,114.000
KWH |
| DRIFTWOOD
MIDDLE |
384,298.000
KWH |
312,056.000
KWH |
| EAGLE
POINT ELEM |
215,880.000
KWH |
194,400.000
KWH |
| EAGLE
RIDGE ELEM |
157,320.000
KWH |
141,000.000
KWH |
| ECIA
SPECIAL PROGRAMS |
20,289.000
KWH |
25,151.000
KWH |
| EDGEWOOD
CENTER |
42,256.000
KWH |
42,736.000
KWH |
| ELY
HIGH |
583,917.000
KWH |
644,600.000
KWH |
| EMBASSY
CREEK ELEM |
94,320.000
KWH |
115,680.000
KWH |
| ENDEAVOR
LEARNING CENTER |
84,480.000
KWH |
79,800.000
KWH |
| EVERGLADES
ELEMENTARY |
181,335.000
KWH |
149,385.000
KWH |
| EVERGLADES
HIGH |
512,040.000
KWH |
479,160.000
KWH |
| FAIRWAY
ELEM |
223,800.000
KWH |
90,000.000
KWH |
| FALCON
COVE MIDDLE |
385,637.000
KWH |
317,587.000
KWH |
| FLAMINGO
ELEM |
151,168.000
KWH |
113,728.000
KWH |
| FLANAGAN
HIGH |
494,546.000
KWH |
437,406.000
KWH |
| FLORANADA
ELEM |
116,496.000
KWH |
115,296.000
KWH |
| FOREST
GLEN MIDDLE |
202,825.000
KWH |
181,014.000
KWH |
| FOREST
HILLS ELEM |
111,480.000
KWH |
113,280.000
KWH |
| FORT
LAUDERDALE HIGH |
495,106.000
KWH |
452,007.000
KWH |
| FOX
TRAIL ELEMENTARY |
155,760.000
KWH |
134,640.000
KWH |
| GATOR
RUN ELEMENTARY |
222,240.000
KWH |
176,400.000
KWH |
| GLADES
MIDDLE |
261,600.000
KWH |
246,000.000
KWH |
| GRIFFIN
ELEM |
107,280.000
KWH |
109,680.000
KWH |
| GULFSTREAM
MIDDLE SCHOOL |
75,360.000
KWH |
75,240.000
KWH |
| HALLANDALE
ADULT CENTER |
152,069.000
KWH |
147,487.000
KWH |
| HALLANDALE
ELEM |
169,920.000
KWH |
128,880.000
KWH |
| HALLANDALE
HIGH |
261,266.000
KWH |
302,101.000
KWH |
| HARBORDALE
ELEM |
75,648.000
KWH |
72,528.000
KWH |
| HAWKES
BLUFF ELEM |
147,608.000
KWH |
155,284.000
KWH |
| HOLLYWOOD
CENTRAL AUDITORIUM |
34,080.000
KWH |
31,500.000
KWH |
| HOLLYWOOD
CENTRAL ELEM |
89,280.000
KWH |
90,000.000
KWH |
| HOLLYWOOD
HILLS COMMUNITY |
1,914.000
KWH |
2,596.000
KWH |
| HOLLYWOOD
HILLS ELEMENTARY |
135,000.000
KWH |
135,240.000
KWH |
| HOLLYWOOD
HILLS HIGH |
331,178.000
KWH |
358,873.000
KWH |
| HOLLYWOOD
PARK ELEM |
98,400.000
KWH |
75,120.000
KWH |
| HORIZON
ELEM |
119,400.000
KWH |
96,480.000
KWH |
| HORTT
ADMIN SITE |
52,240.000
KWH |
46,513.000
KWH |
| INDIAN
RIDGE MIDDLE |
277,877.000
KWH |
265,594.000
KWH |
| INDIAN
TRACE ELEM |
120,000.000
KWH |
117,840.000
KWH |
| JAMES
HUNT ELEMENTARY |
147,600.000
KWH |
101,760.000
KWH |
| KATHLEEN
WRIGHT ADMIN |
409,182.000
KWH |
379,759.000
KWH |
| LAKE
FOREST ELEM |
194,880.000
KWH |
113,400.000
KWH |
| LAKESIDE
ELEMENTARY |
128,640.000
KWH |
102,720.000
KWH |
| LANIER
JAMES CENTER |
54,480.000
KWH |
59,040.000
KWH |
| LARKDALE
ELEM |
104,955.000
KWH |
82,060.000
KWH |
| LAUDERDALE
LAKES MIDDLE |
141,360.000
KWH |
157,857.000
KWH |
| LAUDERDALE
MANORS ELEM |
203,160.000
KWH |
181,200.000
KWH |
| LAUDERHILL
MIDDLE |
142,920.000
KWH |
146,640.000
KWH |
| LAUDERHILL
MIDDLE/COMM |
2,934.000
KWH |
4,253.000
KWH |
| LAUDERHILL
PT ELEM |
122,640.000
KWH |
134,880.000
KWH |
| LIBERTY
ELEMENTARY |
143,520.000
KWH |
143,760.000
KWH |
| LLOYD
ESTATES ELEM |
91,200.000
KWH |
110,720.000
KWH |
| LOCKHART
STADIUM |
51,144.000
KWH |
39,209.000
KWH |
| LYONS
CREEK MIDDLE |
298,560.000
KWH |
312,480.000
KWH |
| MANATEE
BAY ELEMENTARY |
159,899.000
KWH |
146,016.000
KWH |
| MAPLEWOOD
ELEM |
125,520.000
KWH |
123,240.000
KWH |
| MARGATE
ELEM |
165,420.000
KWH |
142,320.000
KWH |
| MARGATE
MIDDLE |
241,880.000
KWH |
200,421.000
KWH |
| MARKHAM
ELEM |
129,139.000
KWH |
111,654.000
KWH |
| MARTIN
LUTHER KING ELEM |
135,968.000
KWH |
117,583.000
KWH |
| MCARTHUR
HIGH |
453,916.000
KWH |
407,635.000
KWH |
| MCFATTER
VO TECH |
344,160.000
KWH |
318,000.000
KWH |
| MCNAB
ELEMENTARY |
139,200.000
KWH |
125,908.000
KWH |
| MCNICOL
MIDDLE |
276,000.000
KWH |
223,440.000
KWH |
| MEADOWBROOK
ELEM |
84,492.000
KWH |
72,240.000
KWH |
| MILLENNIUM
MIDDLE |
269,040.000
KWH |
268,800.000
KWH |
| MIRAMAR
ELEM |
138,720.000
KWH |
112,320.000
KWH |
| MIRAMAR
HIGH |
482,658.000
KWH |
360,508.000
KWH |
| MIRROR
LAKE ELEM |
90,720.000
KWH |
82,080.000
KWH |
| MONARCH
HIGH |
350,400.000
KWH |
327,600.000
KWH |
| MORROW
ELEM |
120,600.000
KWH |
103,560.000
KWH |
| MULTICULTURAL
CENTER |
13,200.000
KWH |
11,160.000
KWH |
| N
ANDREWS GARDENS ELEM |
169,344.000
KWH |
164,064.000
KWH |
| NEW
RENAISSANCE MIDDLE |
215,154.000
KWH |
224,268.000
KWH |
| NEW
RIVER MIDDLE SCHOOL |
120,504.000
KWH |
37,764.000
KWH |
| NOB
HILL ELEM |
242,760.000
KWH |
206,760.000
KWH |
| NORCREST
ELEM |
109,920.000
KWH |
100,440.000
KWH |
| NORTH
AREA MAINT/WHSE |
114,347.000
KWH |
180,714.000
KWH |
| NORTH
AREA SUPERINTENDENT |
30,720.000
KWH |
30,840.000
KWH |
| NORTH
BUS PARKING LOT |
72,946.000
KWH |
65,947.000
KWH |
| NORTH
CENTRAL SUPERINTENDENT |
91,740.000
KWH |
80,820.000
KWH |
| NORTH
FORK ELEM |
113,160.000
KWH |
98,040.000
KWH |
| NORTH
LAUDERDALE ELEM |
108,480.000
KWH |
93,600.000
KWH |
| NORTH
SIDE ELEMENTARY |
115,560.000
KWH |
98,160.000
KWH |
| NORTHEAST
HIGH |
348,809.000
KWH |
313,568.000
KWH |
| NOVA
BLANCHE FORMAN/EISENHOWER ELEM |
268,000.000
KWH |
199,200.000
KWH |
| NOVA
EISENHOWER ELEMENTARY |
9,356.000
KWH |
7,339.000
KWH |
| NOVA
HIGH |
10,047.000
KWH |
29,363.000
KWH |
| NOVA
HIGH - MECH PLANT |
536,000.000
KWH |
598,400.000
KWH |
| NOVA
HIGH COMM/GED |
8.000
KWH |
.000
KWH |
| OAKLAND
PARK ELEM |
131,400.000
KWH |
119,880.000
KWH |
| OAKRIDGE
ELEM |
110,539.000
KWH |
120,980.000
KWH |
| OLSEN
MIDDLE |
149,160.000
KWH |
163,680.000
KWH |
| OLSEN
MIDDLE ANNEX |
92,600.000
KWH |
98,840.000
KWH |
| ORANGEBROOK
ELEM |
138,000.000
KWH |
107,520.000
KWH |
| ORIOLE
ELEM |
85,920.000
KWH |
100,560.000
KWH |
| PALM
COVE ELEM |
140,280.000
KWH |
138,240.000
KWH |
| PALMVIEW
ELEM |
124,920.000
KWH |
101,880.000
KWH |
| PANTHER
RUN ELEM |
116,400.000
KWH |
95,760.000
KWH |
| PARK
LAKES ELEMENTARY |
161,520.000
KWH |
169,200.000
KWH |
| PARK
LAKES ELEMENTARY ANNEX |
20,544.000
KWH |
11,968.000
KWH |
| PARK
RIDGE ELEM |
86,760.000
KWH |
82,080.000
KWH |
| PARK
SPRINGS ELEM |
147,120.000
KWH |
140,160.000
KWH |
| PARK
TRAILS ELEMENTARY |
170,280.000
KWH |
151,920.000
KWH |
| PARKSIDE
ELEMENTARY |
142,800.000
KWH |
136,080.000
KWH |
| PARKWAY
MIDDLE |
322,197.000
KWH |
332,213.000
KWH |
| PASADENA
LAKES ELEM |
153,988.000
KWH |
121,361.000
KWH |
| PEMBROKE
LAKES ELEM |
108,720.000
KWH |
103,020.000
KWH |
| PEMBROKE
PINES ELEM |
97,071.000
KWH |
128,010.000
KWH |
| PERRY
ELEM |
140,146.000
KWH |
78,004.000
KWH |
| PERRY
MIDDLE |
176,880.000
KWH |
166,800.000
KWH |
| PETERS
ELEM |
99,644.000
KWH |
106,536.000
KWH |
| PHYSICAL
PLANT OPERATIONS |
92,251.000
KWH |
95,572.000
KWH |
| PINE
RIDGE CTR |
70,080.000
KWH |
76,560.000
KWH |
| PINES
LAKES ELEM |
147,000.000
KWH |
128,760.000
KWH |
| PINES
MIDDLE |
222,088.000
KWH |
231,208.000
KWH |
| PINEWOOD
ELEM |
115,200.000
KWH |
114,240.000
KWH |
| PIONEER
MIDDLE |
205,219.000
KWH |
189,519.000
KWH |
| PIONEER
MIDDLE ANNEX |
33,600.000
KWH |
30,360.000
KWH |
| PIPER
HIGH |
414,552.000
KWH |
430,218.000
KWH |
| PLANTATION
ELEM |
134,814.000
KWH |
128,760.000
KWH |
| PLANTATION
HIGH |
424,760.000
KWH |
366,785.000
KWH |
| PLANTATION
MIDDLE |
204,045.000
KWH |
175,758.000
KWH |
| PLANTATION
PARK ELEM |
93,744.000
KWH |
78,602.000
KWH |
| POMPANO
BEACH ELEM |
110,880.000
KWH |
124,920.000
KWH |
| POMPANO
BEACH HIGH |
270,945.000
KWH |
281,790.000
KWH |
| POMPANO
BEACH MIDDLE |
198,168.000
KWH |
195,648.000
KWH |
| PPO
ZONE 2 - LEASED |
131,814.000
KWH |
48,046.000
KWH |
| QUIET
WATERS ELEM |
24,151.000
KWH |
22,195.000
KWH |
| RAMBLEWOOD
ELEM |
125,520.000
KWH |
94,500.000
KWH |
| RAMBLEWOOD
MIDDLE |
134,640.000
KWH |
115,200.000
KWH |
| RICKARDS
MIDDLE |
289,200.000
KWH |
222,286.000
KWH |
| RIVERGLADES
ELEM |
172,602.000
KWH |
169,322.000
KWH |
| RIVERLAND
ELEM |
101,640.000
KWH |
101,160.000
KWH |
| RIVERSIDE
ELEM |
95,280.000
KWH |
108,960.000
KWH |
| ROCK
ISLAND ADMIN |
127,440.000
KWH |
136,440.000
KWH |
| ROYAL
PALM ELEMENTARY |
67,992.000
KWH |
55,632.000
KWH |
| SAFETY
DEPARTMENT |
143,125.000
KWH |
152,881.000
KWH |
| SANDERS
PARK ELEM |
89,200.000
KWH |
96,800.000
KWH |
| SANDPIPER
ELEM |
154,320.000
KWH |
146,160.000
KWH |
| SAWGRASS
ELEM |
152,040.000
KWH |
139,440.000
KWH |
| SAWGRASS
SPRINGS MIDDLE |
216,960.000
KWH |
178,800.000
KWH |
| SEA
CASTLE ELEM |
164,880.000
KWH |
159,840.000
KWH |
| SEAGULL
SCHOOL |
104,141.000
KWH |
90,842.000
KWH |
| SEMINOLE
MIDDLE |
187,320.000
KWH |
196,440.000
KWH |
| SHERIDAN
HILLS ELEM |
88,348.000
KWH |
87,510.000
KWH |
| SHERIDAN
PARK ELEM |
123,120.000
KWH |
103,440.000
KWH |
| SHERIDAN
VOCATIONAL |
326,880.000
KWH |
296,640.000
KWH |
| SILVER
LAKES ELEMENTARY |
111,000.000
KWH |
106,440.000
KWH |
| SILVER
LAKES MIDDLE |
197,160.000
KWH |
136,200.000
KWH |
| SILVER
PALMS ELEM |
145,680.000
KWH |
165,000.000
KWH |
| SILVER
RIDGE ELEM |
193,320.000
KWH |
173,040.000
KWH |
| SILVER
SHORES ELEMENTARY |
122,760.000
KWH |
121,560.000
KWH |
| SILVER
TRAIL MIDDLE |
246,240.000
KWH |
234,720.000
KWH |
| SOUTH
AREA BUS PARKING |
34,264.000
KWH |
34,270.000
KWH |
| SOUTH
AREA MAINTENANCE |
17,729.000
KWH |
17,765.000
KWH |
| SOUTH
BROWARD HIGH |
389,051.000
KWH |
392,220.000
KWH |
| SOUTH
PLANTATION HIGH |
514,037.000
KWH |
375,577.000
KWH |
| SOUTH
WEST BUS LOT |
682.000
KWH |
17,564.000
KWH |
| STEPHEN
FOSTER ELEM |
110,909.000
KWH |
113,565.000
KWH |
| STIRLING
ELEM |
83,280.000
KWH |
93,240.000
KWH |
| STONEMAN
DOUGLAS HIGH |
472,000.000
KWH |
515,200.000
KWH |
| STRANAHAN
HIGH |
429,166.000
KWH |
362,367.000
KWH |
| SUNLAND
PARK ELEM |
103,800.000
KWH |
99,360.000
KWH |
| SUNRISE
MIDDLE |
201,516.000
KWH |
206,347.000
KWH |
| SUNSET
LAKES ELEMENTARY |
102,960.000
KWH |
139,680.000
KWH |
| SUNSET
SCHOOL |
93,312.000
KWH |
100,152.000
KWH |
| SUNSHINE
ELEMENTARY |
88,719.000
KWH |
104,442.000
KWH |
| TAMARAC
ELEM |
150,000.000
KWH |
149,760.000
KWH |
| TARAVELLA
HIGH |
446,334.000
KWH |
419,198.000
KWH |
| TECHNOLOGY
AND SUPPORT SERVICE |
350,880.000
KWH |
336,240.000
KWH |
| TEDDER
ELEMENTARY SCHOOL |
126,951.000
KWH |
125,648.000
KWH |
| TEQUESTA
TRACE MIDDLE |
225,600.000
KWH |
205,800.000
KWH |
| THE
QUEST CENTER |
97,680.000
KWH |
96,600.000
KWH |
| THURGOOD
MARSHALL ELEM |
118,584.000
KWH |
114,024.000
KWH |
| TRADEWINDS
ELEM |
183,360.000
KWH |
185,040.000
KWH |
| TRANSPORTATION
SERVICE ANNEX |
.000
KWH |
5,040.000
KWH |
| TROPICAL
ELEM |
90,898.000
KWH |
108,609.000
KWH |
| TWIN
LAKES ADMIN |
53,040.000
KWH |
60,720.000
KWH |
| TWIN
LAKES ANNEX/NEW WHSE |
2,589.000
KWH |
2,518.000
KWH |
| TWIN
LAKES COMPLEX |
99,758.000
KWH |
94,965.000
KWH |
| VEHICLE
MAINTENANCE |
78,000.000
KWH |
81,840.000
KWH |
| VILLAGE
ELEM |
162,180.000
KWH |
177,000.000
KWH |
| VIRGINIA
YOUNG ELEM |
93,480.000
KWH |
93,480.000
KWH |
| WALKER
ELEM |
233,899.000
KWH |
182,121.000
KWH |
| WALTER
C YOUNG MIDDLE |
416,669.000
KWH |
371,835.000
KWH |
| WATKINS
ELEM |
135,840.000
KWH |
98,280.000
KWH |
| WELLEBY
ELEM |
97,800.000
KWH |
108,720.000
KWH |
| WEST
BROWARD HIG/LLL |
.000
KWH |
312,800.000
KWH |
| WEST
CENTRAL BUS COMPLEX |
67,211.000
KWH |
68,385.000
KWH |
| WEST
HOLLYWOOD ELEM |
121,200.000
KWH |
92,280.000
KWH |
| WESTCHESTER
ELEMENTARY |
140,633.000
KWH |
138,002.000
KWH |
| WESTERN
HIGH |
391,231.000
KWH |
495,836.000
KWH |
| WESTGLADES
MIDDLE |
270,000.000
KWH |
289,680.000
KWH |
| WESTPINE
MIDDLE |
153,720.000
KWH |
150,240.000
KWH |
| WESTWOOD
HEIGHTS ELEM |
155,698.000
KWH |
139,493.000
KWH |
| WHIDDON-ROGERS
ED CENTER |
151,600.000
KWH |
126,800.000
KWH |
| WHISPERING
PINES |
71,520.000
KWH |
78,840.000
KWH |
| WILLIAM
DANDY MIDDLE |
181,560.000
KWH |
179,160.000
KWH |
| WILTON
MANORS ELEM |
123,720.000
KWH |
108,900.000
KWH |
| WINGATE
OAKS CTR |
94,920.000
KWH |
100,080.000
KWH |
| WINSTON
PARK ELEM |
171,120.000
KWH |
143,040.000
KWH |
|