Building |
Nov-08 |
Nov-09 |
| APOLLO MIDDLE |
223,440.000 KWH |
247,440.000 KWH |
| ARTHUR ASHE MIDDLE |
303,600.000 KWH |
309,600.000 KWH |
| ATLANTIC VOC CENTER |
525,601.000 KWH |
517,657.000 KWH |
| ATLANTIC WEST ELEM |
132,120.000 KWH |
123,600.000 KWH |
| ATTUCKS MIDDLE |
233,040.000 KWH |
277,028.000 KWH |
| BAIR MIDDLE |
179,040.000 KWH |
181,920.000 KWH |
| BANYAN ELEM |
138,960.000 KWH |
125,400.000 KWH |
| BAYVIEW ELEM |
99,960.000 KWH |
89,040.000 KWH |
| BECON |
246,760.000 KWH |
174,700.000 KWH |
| BENNETT ELEM |
104,640.000 KWH |
102,480.000 KWH |
| BETHUNE ELEM |
185,760.000 KWH |
193,080.000 KWH |
| BOULEVARD HEIGHTS ELEM |
128,760.000 KWH |
129,120.000 KWH |
| BOYD ANDERSON HIGH |
431,309.000 KWH |
499,284.000 KWH |
| BRIGHT HORIZONS CTR |
103,680.000 KWH |
108,480.000 KWH |
| BROADVIEW ELEM |
119,664.000 KWH |
133,871.000 KWH |
| BROWARD ESTATES ELEM |
107,811.000 KWH |
133,707.000 KWH |
| BROWARD FIRE ACADEMY |
31,727.000 KWH |
36,640.000 KWH |
| CASTLE HILL ELEM |
154,440.000 KWH |
126,840.000 KWH |
| CENTRAL PARK ELEM |
144,720.000 KWH |
189,240.000 KWH |
| CHALLENGER ELEMENTARY |
134,160.000 KWH |
150,120.000 KWH |
| CHAPEL TRAIL ELEM |
172,336.000 KWH |
186,447.000 KWH |
| CHARLES DREW ELEM |
119,760.000 KWH |
126,360.000 KWH |
| COCONUT CREEK ELEM |
106,349.000 KWH |
101,318.000 KWH |
| COCONUT CREEK HIGH |
350,663.000 KWH |
360,313.000 KWH |
| COCONUT PALM ELEMENTARY |
138,000.000 KWH |
124,440.000 KWH |
| COLBERT ELEM |
124,320.000 KWH |
101,280.000 KWH |
| COLLINS ELEM |
60,000.000 KWH |
72,480.000 KWH |
| COMMUNITY SCHOOL NORTH |
24,240.000 KWH |
25,080.000 KWH |
| COMMUNITY SCHOOL SOUTH |
7,384.000 KWH |
9,077.000 KWH |
| COOPER CITY COMM |
6,314.000 KWH |
2,233.000 KWH |
| COOPER CITY ELEM |
117,840.000 KWH |
125,760.000 KWH |
| COOPER CITY HIGH |
518,980.000 KWH |
510,598.000 KWH |
| CORAL COVE ELEMENTARY |
109,200.000 KWH |
139,440.000 KWH |
| CORAL GLADES HIGH |
394,320.000 KWH |
377,760.000 KWH |
| CORAL PARK ELEM |
131,760.000 KWH |
126,840.000 KWH |
| CORAL SPRINGS ELEM |
113,040.000 KWH |
132,960.000 KWH |
| CORAL SPRINGS HIGH |
434,373.000 KWH |
466,361.000 KWH |
| CORAL SPRINGS MIDDLE |
199,640.000 KWH |
236,440.000 KWH |
| COUNTRY HILLS ELEM |
149,040.000 KWH |
174,960.000 KWH |
| COUNTRY ISLES ELEM |
156,600.000 KWH |
186,120.000 KWH |
| CRESTHAVEN ELEM |
106,560.000 KWH |
123,360.000 KWH |
| CROISSANT PARK ELEM |
118,380.000 KWH |
135,543.000 KWH |
| CROSS CREEK |
75,720.000 KWH |
86,760.000 KWH |
| CRYSTAL LAKE COMM SCHOOL |
6,226.000 KWH |
6,786.000 KWH |
| CRYSTAL LAKE MIDDLE |
203,154.000 KWH |
252,575.000 KWH |
| CYPRESS BAY HIGH |
554,800.000 KWH |
529,200.000 KWH |
| CYPRESS BAY HIGH ANNEX |
67,440.000 KWH |
55,680.000 KWH |
| CYPRESS ELEM |
97,920.000 KWH |
104,160.000 KWH |
| CYPRESS RUN ALTERNATIVE |
67,851.000 KWH |
70,203.000 KWH |
| DANIA ELEM |
129,785.000 KWH |
126,849.000 KWH |
| DAVE THOMAS ED CENTER (WEST) |
106,560.000 KWH |
96,960.000 KWH |
| DAVE THOMAS EDUCATION CENTER |
41,484.000 KWH |
40,716.000 KWH |
| DAVIE ELEM |
117,573.000 KWH |
119,440.000 KWH |
| DEERFIELD BEACH ELEM |
138,000.000 KWH |
181,531.000 KWH |
| DEERFIELD BEACH HIGH |
414,412.000 KWH |
416,414.000 KWH |
| DEERFIELD BEACH MID |
205,067.000 KWH |
287,708.000 KWH |
| DEERFIELD PARK ELEM |
110,880.000 KWH |
122,280.000 KWH |
| DILLARD ELEM |
133,440.000 KWH |
141,120.000 KWH |
| DILLARD HIGH SCHOOL |
608,317.000 KWH |
602,581.000 KWH |
| DISCOVERY ELEMENTARY |
.000 KWH |
153,360.000 KWH |
| DOLPHIN BAY ELEMENTARY |
106,560.000 KWH |
113,760.000 KWH |
| DREW RESOURCE CTR |
63,645.000 KWH |
85,314.000 KWH |
| DRIFTWOOD ELEM |
97,787.000 KWH |
106,298.000 KWH |
| DRIFTWOOD MIDDLE |
357,513.000 KWH |
337,558.000 KWH |
| EAGLE POINT ELEM |
207,360.000 KWH |
211,800.000 KWH |
| EAGLE RIDGE ELEM |
141,000.000 KWH |
155,520.000 KWH |
| ECIA SPECIAL PROGRAMS |
22,302.000 KWH |
23,098.000 KWH |
| EDGEWOOD CENTER |
54,016.000 KWH |
49,216.000 KWH |
| ELY HIGH |
762,336.000 KWH |
650,816.000 KWH |
| EMBASSY CREEK ELEM |
111,120.000 KWH |
133,920.000 KWH |
| ENDEAVOR LEARNING CENTER |
85,920.000 KWH |
84,480.000 KWH |
| EVERGLADES ELEMENTARY |
198,703.000 KWH |
157,190.000 KWH |
| EVERGLADES HIGH |
488,280.000 KWH |
483,840.000 KWH |
| FAIRWAY ELEM |
185,040.000 KWH |
181,200.000 KWH |
| FALCON COVE MIDDLE |
379,383.000 KWH |
319,215.000 KWH |
| FLAMINGO ELEM |
114,088.000 KWH |
124,048.000 KWH |
| FLANAGAN HIGH |
499,185.000 KWH |
541,481.000 KWH |
| FLORANADA ELEM |
123,456.000 KWH |
135,816.000 KWH |
| FOREST GLEN MIDDLE |
189,359.000 KWH |
212,760.000 KWH |
| FOREST HILLS ELEM |
121,080.000 KWH |
121,320.000 KWH |
| FORT LAUDERDALE HIGH |
566,489.000 KWH |
441,920.000 KWH |
| FOX TRAIL ELEMENTARY |
152,280.000 KWH |
164,760.000 KWH |
| GATOR RUN ELEMENTARY |
129,840.000 KWH |
191,520.000 KWH |
| GLADES MIDDLE |
300,000.000 KWH |
312,400.000 KWH |
| GRIFFIN ELEM |
91,080.000 KWH |
94,680.000 KWH |
| GULFSTREAM MIDDLE SCHOOL |
69,120.000 KWH |
92,520.000 KWH |
| HALLANDALE ADULT CENTER |
156,569.000 KWH |
162,655.000 KWH |
| HALLANDALE ELEM |
123,840.000 KWH |
133,920.000 KWH |
| HALLANDALE HIGH |
291,276.000 KWH |
333,906.000 KWH |
| HARBORDALE ELEM |
71,928.000 KWH |
109,368.000 KWH |
| HAWKES BLUFF ELEM |
146,167.000 KWH |
159,840.000 KWH |
| HERON HEIGHTS ELEMENTARY |
.000 KWH |
114,480.000 KWH |
| HOLLYWOOD CENTRAL AUDITORIUM |
34,980.000 KWH |
43,620.000 KWH |
| HOLLYWOOD CENTRAL ELEM |
90,240.000 KWH |
107,880.000 KWH |
| HOLLYWOOD HILLS COMMUNITY |
2,207.000 KWH |
2,781.000 KWH |
| HOLLYWOOD HILLS ELEMENTARY |
150,480.000 KWH |
261,000.000 KWH |
| HOLLYWOOD HILLS HIGH |
351,529.000 KWH |
383,633.000 KWH |
| HOLLYWOOD PARK ELEM |
78,960.000 KWH |
90,720.000 KWH |
| HORIZON ELEM |
318,000.000 KWH |
76,440.000 KWH |
| HORTT ADMIN SITE |
53,550.000 KWH |
51,111.000 KWH |
| INDIAN RIDGE MIDDLE |
274,217.000 KWH |
292,279.000 KWH |
| INDIAN TRACE ELEM |
121,320.000 KWH |
127,680.000 KWH |
| JAMES HUNT ELEMENTARY |
120,840.000 KWH |
121,200.000 KWH |
| KATHLEEN WRIGHT ADMIN |
414,973.000 KWH |
368,623.000 KWH |
| LAKE FOREST ELEM |
138,000.000 KWH |
140,160.000 KWH |
| LAKESIDE ELEMENTARY |
117,840.000 KWH |
117,840.000 KWH |
| LANIER JAMES CENTER |
56,160.000 KWH |
53,520.000 KWH |
| LARKDALE ELEM |
79,090.000 KWH |
134,660.000 KWH |
| LAUDERDALE LAKES MIDDLE |
173,400.000 KWH |
180,490.000 KWH |
| LAUDERDALE MANORS ELEM |
189,840.000 KWH |
255,240.000 KWH |
| LAUDERHILL MIDDLE |
146,880.000 KWH |
159,480.000 KWH |
| LAUDERHILL MIDDLE/COMM |
3,810.000 KWH |
3,981.000 KWH |
| LAUDERHILL PT ELEM |
141,240.000 KWH |
149,400.000 KWH |
| LIBERTY ELEMENTARY |
152,880.000 KWH |
163,680.000 KWH |
| LLOYD ESTATES ELEM |
90,240.000 KWH |
140,040.000 KWH |
| LOCKHART STADIUM |
69,707.000 KWH |
82,108.000 KWH |
| LYONS CREEK MIDDLE |
289,920.000 KWH |
340,080.000 KWH |
| MANATEE BAY ELEMENTARY |
162,915.000 KWH |
173,657.000 KWH |
| MAPLEWOOD ELEM |
124,080.000 KWH |
143,760.000 KWH |
| MARGATE ELEM |
182,880.000 KWH |
170,280.000 KWH |
| MARGATE MIDDLE |
204,247.000 KWH |
216,173.000 KWH |
| MARKHAM ELEM |
100,006.000 KWH |
117,729.000 KWH |
| MARTIN LUTHER KING ELEM |
176,898.000 KWH |
162,471.000 KWH |
| MCARTHUR HIGH |
451,829.000 KWH |
474,065.000 KWH |
| MCFATTER VO TECH |
315,360.000 KWH |
307,920.000 KWH |
| MCNAB ELEMENTARY |
129,892.000 KWH |
151,444.000 KWH |
| MCNICOL MIDDLE |
242,880.000 KWH |
264,480.000 KWH |
| MEADOWBROOK ELEM |
128,773.000 KWH |
142,800.000 KWH |
| MILLENNIUM MIDDLE |
281,760.000 KWH |
310,800.000 KWH |
| MIRAMAR ELEM |
137,880.000 KWH |
140,280.000 KWH |
| MIRAMAR HIGH |
499,213.000 KWH |
439,909.000 KWH |
| MIRROR LAKE ELEM |
89,040.000 KWH |
92,880.000 KWH |
| MONARCH HIGH |
390,800.000 KWH |
369,200.000 KWH |
| MORROW ELEM |
138,240.000 KWH |
119,520.000 KWH |
| MULTICULTURAL CENTER |
13,080.000 KWH |
19,560.000 KWH |
| N ANDREWS GARDENS ELEM |
187,104.000 KWH |
181,944.000 KWH |
| NEW RENAISSANCE MIDDLE |
225,235.000 KWH |
256,208.000 KWH |
| NEW RIVER CIRCLE SITE |
50,304.000 KWH |
60,924.000 KWH |
| NEW RIVER MIDDLE SCHOOL |
214,680.000 KWH |
244,200.000 KWH |
| NOB HILL ELEM |
120,840.000 KWH |
111,360.000 KWH |
| NORCREST ELEM |
248,644.000 KWH |
128,867.000 KWH |
| NORTH AREA MAINT/WHSE |
32,400.000 KWH |
34,200.000 KWH |
| NORTH BUS PARKING LOT |
48,715.000 KWH |
54,957.000 KWH |
| NORTH CENTRAL SUPERINTENDENT |
86,400.000 KWH |
73,020.000 KWH |
| NORTH FORK ELEM |
126,000.000 KWH |
117,000.000 KWH |
| NORTH LAUDERDALE ELEM |
104,400.000 KWH |
108,720.000 KWH |
| NORTH SIDE ELEMENTARY |
112,440.000 KWH |
111,480.000 KWH |
| NORTH WEST TRANSPORTATION |
21,360.000 KWH |
22,920.000 KWH |
| NORTHEAST HIGH |
362,698.000 KWH |
351,452.000 KWH |
| NOVA BLANCHE FORMAN/EISENHOWER ELEM |
248,800.000 KWH |
243,200.000 KWH |
| NOVA CENTER - NOVA MIDDLE |
.000 KWH |
29,220.000 KWH |
| NOVA EISENHOWER ELEMENTARY |
9,687.000 KWH |
7,153.000 KWH |
| NOVA HIGH |
31,770.000 KWH |
37,817.000 KWH |
| NOVA HIGH - MECH PLANT |
753,600.000 KWH |
630,400.000 KWH |
| OAKLAND PARK ELEM |
121,920.000 KWH |
144,240.000 KWH |
| OAKRIDGE ELEM |
130,318.000 KWH |
110,708.000 KWH |
| OFF CAMPUS ALTERNATIVE CENTER |
.000 KWH |
1,651.000 KWH |
| OLSEN MIDDLE |
167,040.000 KWH |
220,800.000 KWH |
| OLSEN MIDDLE ANNEX |
102,920.000 KWH |
134,840.000 KWH |
| ORANGE BROOK ELEM |
114,720.000 KWH |
114,960.000 KWH |
| ORIOLE ELEM |
95,280.000 KWH |
111,120.000 KWH |
| PALM COVE ELEM |
139,200.000 KWH |
144,600.000 KWH |
| PALMVIEW ELEM |
137,160.000 KWH |
118,920.000 KWH |
| PANTHER RUN ELEM |
95,160.000 KWH |
105,120.000 KWH |
| PARK LAKES ELEMENTARY |
183,360.000 KWH |
205,920.000 KWH |
| PARK LAKES ELEMENTARY ANNEX |
19,048.000 KWH |
38,128.000 KWH |
| PARK RIDGE ELEM |
93,480.000 KWH |
100,080.000 KWH |
| PARK SPRINGS ELEM |
137,040.000 KWH |
147,360.000 KWH |
| PARK TRAILS ELEMENTARY |
162,360.000 KWH |
158,520.000 KWH |
| PARKSIDE ELEMENTARY |
125,280.000 KWH |
131,280.000 KWH |
| PARKWAY MIDDLE |
333,365.000 KWH |
339,582.000 KWH |
| PASADENA LAKES ELEM |
151,258.000 KWH |
154,931.000 KWH |
| PEMBROKE LAKES ELEM |
100,920.000 KWH |
105,060.000 KWH |
| PEMBROKE PINES ELEM |
105,433.000 KWH |
122,945.000 KWH |
| PERRY ELEM |
116,685.000 KWH |
145,312.000 KWH |
| PERRY MIDDLE |
222,480.000 KWH |
196,800.000 KWH |
| PETERS ELEM |
166,000.000 KWH |
114,426.000 KWH |
| PHYSICAL PLANT OPERATIONS |
95,529.000 KWH |
108,972.000 KWH |
| PINE RIDGE CTR |
76,080.000 KWH |
84,960.000 KWH |
| PINES LAKES ELEM |
131,400.000 KWH |
161,760.000 KWH |
| PINES MIDDLE |
232,648.000 KWH |
252,328.000 KWH |
| PINEWOOD ELEM |
177,360.000 KWH |
144,480.000 KWH |
| PIONEER MIDDLE |
198,685.000 KWH |
227,876.000 KWH |
| PIONEER MIDDLE ANNEX |
34,860.000 KWH |
28,200.000 KWH |
| PIPER HIGH |
425,452.000 KWH |
464,995.000 KWH |
| PLANTATION ELEM |
130,582.000 KWH |
124,414.000 KWH |
| PLANTATION HIGH |
403,965.000 KWH |
393,089.000 KWH |
| PLANTATION MIDDLE |
202,485.000 KWH |
238,618.000 KWH |
| PLANTATION PARK ELEM |
77,468.000 KWH |
89,040.000 KWH |
| POMPANO BEACH ELEM |
154,680.000 KWH |
150,840.000 KWH |
| POMPANO BEACH HIGH |
292,409.000 KWH |
368,620.000 KWH |
| POMPANO BEACH MIDDLE |
198,408.000 KWH |
258,408.000 KWH |
| PORTABLE AT PINES |
57,810.000 KWH |
74,274.000 KWH |
| PPO ZONE 2 - LEASED |
23,681.000 KWH |
22,418.000 KWH |
| QUIET WATERS ELEM |
133,320.000 KWH |
190,680.000 KWH |
| RAMBLEWOOD ELEM |
158,880.000 KWH |
135,360.000 KWH |
| RAMBLEWOOD MIDDLE |
240,065.000 KWH |
262,516.000 KWH |
| RICKARDS MIDDLE |
175,928.000 KWH |
198,836.000 KWH |
| RIVERGLADES ELEM |
100,800.000 KWH |
101,160.000 KWH |
| RIVERLAND ELEM |
113,160.000 KWH |
115,800.000 KWH |
| RIVERSIDE ELEM |
137,760.000 KWH |
170,880.000 KWH |
| ROCK ISLAND ADMIN |
67,992.000 KWH |
74,472.000 KWH |
| ROYAL PALM ELEMENTARY |
157,460.000 KWH |
186,314.000 KWH |
| SANDERS PARK ELEM |
103,200.000 KWH |
98,000.000 KWH |
| SANDPIPER ELEM |
135,360.000 KWH |
186,000.000 KWH |
| SAWGRASS ELEM |
143,400.000 KWH |
153,600.000 KWH |
| SAWGRASS SPRINGS MIDDLE |
198,360.000 KWH |
209,880.000 KWH |
| SEA CASTLE ELEM |
171,120.000 KWH |
146,880.000 KWH |
| SEAGULL SCHOOL |
97,864.000 KWH |
115,654.000 KWH |
| SEMINOLE MIDDLE |
205,200.000 KWH |
216,240.000 KWH |
| SHERIDAN HILLS ELEM |
89,962.000 KWH |
99,889.000 KWH |
| SHERIDAN PARK ELEM |
119,520.000 KWH |
129,120.000 KWH |
| SHERIDAN VOCATIONAL |
328,080.000 KWH |
307,920.000 KWH |
| SILVER LAKES ELEMENTARY |
101,400.000 KWH |
119,640.000 KWH |
| SILVER LAKES MIDDLE |
166,080.000 KWH |
170,370.000 KWH |
| SILVER PALMS ELEM |
135,600.000 KWH |
174,240.000 KWH |
| SILVER RIDGE ELEM |
180,840.000 KWH |
189,120.000 KWH |
| SILVER SHORES ELEMENTARY |
125,160.000 KWH |
140,040.000 KWH |
| SILVER TRAIL MIDDLE |
241,680.000 KWH |
259,200.000 KWH |
| SOUTH AREA BUS PARKING |
33,866.000 KWH |
43,246.000 KWH |
| SOUTH AREA MAINTENANCE |
17,211.000 KWH |
19,109.000 KWH |
| SOUTH BROWARD HIGH |
428,779.000 KWH |
433,268.000 KWH |
| SOUTH PLANTATION HIGH |
502,707.000 KWH |
501,050.000 KWH |
| Southwest Area Bus Complex |
22,501.000 KWH |
25,534.000 KWH |
| STEPHEN FOSTER ELEM |
128,028.000 KWH |
136,962.000 KWH |
| STIRLING ELEM |
99,360.000 KWH |
111,600.000 KWH |
| STONEMAN DOUGLAS HIGH |
496,000.000 KWH |
544,000.000 KWH |
| STRANAHAN HIGH |
412,125.000 KWH |
433,456.000 KWH |
| SUNLAND PARK ELEM |
109,080.000 KWH |
101,760.000 KWH |
| SUNRISE MIDDLE |
242,268.000 KWH |
235,297.000 KWH |
| SUNSET LAKES ELEMENTARY |
120,840.000 KWH |
158,160.000 KWH |
| SUNSET SCHOOL |
107,832.000 KWH |
117,552.000 KWH |
| SUNSHINE ELEMENTARY |
145,198.000 KWH |
131,071.000 KWH |
| TAMARAC ELEM |
171,300.000 KWH |
197,190.000 KWH |
| TARAVELLA HIGH |
425,696.000 KWH |
497,183.000 KWH |
| TECHNOLOGY AND SUPPORT SERVICE |
342,480.000 KWH |
371,760.000 KWH |
| TEDDER ELEMENTARY SCHOOL |
127,393.000 KWH |
157,846.000 KWH |
| TEQUESTA TRACE MIDDLE |
222,240.000 KWH |
227,880.000 KWH |
| THE QUEST CENTER |
100,920.000 KWH |
89,400.000 KWH |
| THURGOOD MARSHALL ELEM |
116,184.000 KWH |
113,544.000 KWH |
| TRADEWINDS ELEM |
154,680.000 KWH |
191,760.000 KWH |
| Transportation Services Annex |
7,920.000 KWH |
3,840.000 KWH |
| TROPICAL ELEM |
115,899.000 KWH |
127,383.000 KWH |
| TWIN LAKES ADMIN |
58,080.000 KWH |
68,160.000 KWH |
| TWIN LAKES ANNEX/NEW WHSE |
2,458.000 KWH |
2,890.000 KWH |
| TWIN LAKES COMPLEX |
87,264.000 KWH |
113,799.000 KWH |
| VEHICLE MAINTENANCE |
80,640.000 KWH |
90,000.000 KWH |
| VILLAGE ELEM |
172,680.000 KWH |
144,540.000 KWH |
| VIRGINIA YOUNG ELEM |
89,040.000 KWH |
108,480.000 KWH |
| WALKER ELEM |
197,753.000 KWH |
249,847.000 KWH |
| WALTER C YOUNG MIDDLE |
431,123.000 KWH |
456,310.000 KWH |
| WATKINS ELEM |
117,720.000 KWH |
117,840.000 KWH |
| WELLEBY ELEM |
112,200.000 KWH |
123,120.000 KWH |
| WEST BROWARD HIG/LLL |
367,200.000 KWH |
424,000.000 KWH |
| WEST CENTRAL BUS COMPLEX |
71,983.000 KWH |
61,736.000 KWH |
| WEST HOLLYWOOD ELEM |
124,560.000 KWH |
113,520.000 KWH |
| WESTCHESTER ELEMENTARY |
134,555.000 KWH |
146,564.000 KWH |
| WESTERN HIGH |
424,572.000 KWH |
521,479.000 KWH |
| WESTGLADES MIDDLE |
298,320.000 KWH |
292,800.000 KWH |
| WESTPINE MIDDLE |
145,800.000 KWH |
181,080.000 KWH |
| WESTWOOD HEIGHTS ELEM |
138,066.000 KWH |
150,200.000 KWH |
| WHIDDON-ROGERS ED CENTER |
139,200.000 KWH |
157,600.000 KWH |
| WHISPERING PINES |
77,160.000 KWH |
94,200.000 KWH |
| WILLIAM DANDY MIDDLE |
185,880.000 KWH |
187,800.000 KWH |
| WILTON MANORS ELEM |
128,640.000 KWH |
130,620.000 KWH |
| WINGATE OAKS CTR |
94,080.000 KWH |
115,800.000 KWH |
| WINSTON PARK ELEM |
168,480.000 KWH |
174,240.000 KWH |
|