APOLLO MIDDLE 229,440.000 KWH 275,280.000 KWH
ARTHUR ASHE MIDDLE 360,000.000 KWH 327,600.000 KWH
ATLANTIC VOC CENTER 630,328.000 KWH 577,417.000 KWH
ATLANTIC WEST ELEM 187,680.000 KWH 156,000.000 KWH
ATTUCKS MIDDLE 321,851.000 KWH 253,200.000 KWH
BAIR MIDDLE 224,640.000 KWH 198,000.000 KWH
BANYAN ELEM 168,840.000 KWH 153,480.000 KWH
BAYVIEW ELEM 109,440.000 KWH 95,040.000 KWH
BECON 213,600.000 KWH 260,640.000 KWH
BENNETT ELEM 111,360.000 KWH 107,040.000 KWH
BETHUNE ELEM 229,560.000 KWH 191,040.000 KWH
BOULEVARD HEIGHTS ELEM 121,080.000 KWH 150,240.000 KWH
BOYD ANDERSON HIGH 485,723.000 KWH 414,071.000 KWH
BRIGHT HORIZONS CTR 154,560.000 KWH 112,080.000 KWH
BROADVIEW ELEM 167,990.000 KWH 138,258.000 KWH
BROWARD EDUCATION FOUNDATION 3,148.000 KWH .000 KWH
BROWARD ESTATES ELEM 208,597.000 KWH 145,704.000 KWH
BROWARD FIRE ACADEMY 37,200.000 KWH 37,645.000 KWH
CASTLE HILL ELEM 156,120.000 KWH 149,280.000 KWH
CENTRAL AREA ADMINISTRATIVE 167,990.000 KWH .000 KWH
CENTRAL PARK ELEM 3,148.000 KWH 167,280.000 KWH
CHALLENGER ELEMENTARY 208,597.000 KWH 164,640.000 KWH
CHAPEL TRAIL ELEM 37,200.000 KWH 224,989.000 KWH
CHARLES DREW ELEM 156,120.000 KWH 133,560.000 KWH
COCONUT CREEK ELEM 147,582.000 KWH 113,126.000 KWH
COCONUT CREEK HIGH 501,373.000 KWH 372,589.000 KWH
COCONUT PALM ELEMENTARY 191,760.000 KWH 170,760.000 KWH
COLBERT ELEM 126,000.000 KWH 136,080.000 KWH
COLLINS ELEM 85,200.000 KWH 71,520.000 KWH
COMMUNITY SCHOOL SOUTH .000 KWH 10,008.000 KWH
COOPER CITY COMM 9,616.000 KWH 8,660.000 KWH
COOPER CITY ELEM 140,640.000 KWH 143,760.000 KWH
COOPER CITY HIGH 646,391.000 KWH 590,845.000 KWH
CORAL COVE ELEMENTARY 142,560.000 KWH 125,760.000 KWH
CORAL GLADES HIGH 516,480.000 KWH 377,040.000 KWH
CORAL PARK ELEM 143,520.000 KWH 161,400.000 KWH
CORAL SPRINGS ELEM 150,240.000 KWH 138,960.000 KWH
CORAL SPRINGS COMMUNITY 486,529.000 KWH 497,900.000 KWH
CORAL SPRINGS HIGH 276,840.000 KWH 250,040.000 KWH
CORAL SPRINGS MIDDLE 218,280.000 KWH 161,640.000 KWH
COUNTRY HILLS ELEM 215,040.000 KWH 188,760.000 KWH
COUNTRY ISLES ELEM 137,040.000 KWH 122,400.000 KWH
CRESTHAVEN ELEM 154,403.000 KWH 136,933.000 KWH
CROISSANT PARK ELEM 95,220.000 KWH 87,360.000 KWH
CROSS CREEK 11,000.000 KWH 8,709.000 KWH
CRYSTAL LAKE COMM SCHOOL 274,205.000 KWH 227,125.000 KWH
CRYSTAL LAKE MIDDLE 565,200.000 KWH 581,200.000 KWH
CYPRESS BAY HIGH 254,124.000 KWH 81,360.000 KWH
CYPRESS BAY HIGH ANNEX 120,000.000 KWH 103,920.000 KWH
CYPRESS ELEM 58,695.000 KWH 81,845.000 KWH
CYPRESS RUN ALTERNATIVE 131,169.000 KWH 159,839.000 KWH
DANIA ELEM 140,640.000 KWH 108,480.000 KWH
DAVE THOMAS ED CENTER (WEST) 46,733.000 KWH 42,804.000 KWH
DAVE THOMAS EDUCATION CENTER 154,236.000 KWH 137,854.000 KWH
DAVIE ELEM 186,712.000 KWH 176,760.000 KWH
DEERFIELD BEACH ELEM 455,705.000 KWH 400,445.000 KWH
DEERFIELD BEACH HIGH 329,116.000 KWH 287,194.000 KWH
DEERFIELD BEACH MID 138,120.000 KWH 114,120.000 KWH
DEERFIELD PARK ELEM 175,080.000 KWH 151,680.000 KWH
DILLARD ELEM 6,382.000 KWH .000 KWH
DILLARD HIGH COMM 750,678.000 KWH 779,624.000 KWH
DILLARD HIGH SCHOOL 141,120.000 KWH 120,720.000 KWH
DOLPHIN BAY ELEMENTARY 102,679.000 KWH 81,770.000 KWH
DREW RESOURCE CTR 116,434.000 KWH 110,107.000 KWH
DRIFTWOOD ELEM 224,436.000 KWH 413,280.000 KWH
DRIFTWOOD MIDDLE 247,560.000 KWH 222,840.000 KWH
EAGLE POINT ELEM 198,240.000 KWH 160,440.000 KWH
EAGLE RIDGE ELEM 29,292.000 KWH 28,128.000 KWH
ECIA SPECIAL PROGRAMS 76,216.000 KWH 54,136.000 KWH
EDGEWOOD CENTER 743,536.000 KWH 720,426.000 KWH
ELY HIGH 119,280.000 KWH 116,280.000 KWH
EMBASSY CREEK ELEM 97,800.000 KWH 104,760.000 KWH
ENDEAVOR LEARNING CENTER 164,081.000 KWH 107,764.000 KWH
EVERGLADES 9TH GRADE ANNEX 271,857.000 KWH 251,979.000 KWH
EVERGLADES ELEMENTARY 734,160.000 KWH 539,760.000 KWH
EVERGLADES HIGH 236,520.000 KWH 230,520.000 KWH
FAIRWAY ELEM 444,534.000 KWH 399,866.000 KWH
FALCON COVE MIDDLE 159,928.000 KWH 131,848.000 KWH
FLAMINGO ELEM 670,475.000 KWH 534,220.000 KWH
FLANAGAN HIGH 157,896.000 KWH 131,136.000 KWH
FLORANADA ELEM 280,703.000 KWH 217,957.000 KWH
FOREST GLEN MIDDLE 147,120.000 KWH 135,840.000 KWH
FOREST HILLS ELEM 616,700.000 KWH 638,213.000 KWH
FORT LAUDERDALE HIGH 190,440.000 KWH 193,080.000 KWH
FORT LAUDERDALE HIGH ANNEX 273,600.000 KWH 297,840.000 KWH
FOX TRAIL ELEMENTARY 344,400.000 KWH 333,600.000 KWH
GATOR RUN ELEMENTARY 129,840.000 KWH 108,120.000 KWH
GLADES MIDDLE 105,000.000 KWH 90,720.000 KWH
GRIFFIN ELEM 221,913.000 KWH 186,093.000 KWH
GULFSTREAM MIDDLE SCHOOL 208,080.000 KWH 138,960.000 KWH
HALLANDALE ADULT CENTER 326,044.000 KWH 312,344.000 KWH
HALLANDALE ELEM 118,896.000 KWH 79,368.000 KWH
HALLANDALE HIGH 189,360.000 KWH 161,767.000 KWH
HARBORDALE ELEM 37,560.000 KWH 34,500.000 KWH
HAWKES BLUFF ELEM 123,360.000 KWH 102,480.000 KWH
HOLLYWOOD CENTRAL AUDITORIUM 3,619.000 KWH 3,028.000 KWH
HOLLYWOOD CENTRAL ELEM 95,280.000 KWH 170,640.000 KWH
HOLLYWOOD HILLS COMMUNITY 452,299.000 KWH 389,444.000 KWH
HOLLYWOOD HILLS ELEMENTARY 123,360.000 KWH 93,120.000 KWH
HOLLYWOOD HILLS HIGH 153,600.000 KWH 113,520.000 KWH
HOLLYWOOD PARK ELEM 72,555.000 KWH 64,273.000 KWH
HORIZON ELEM 377,525.000 KWH 319,859.000 KWH
HORTT ADMIN SITE 150,840.000 KWH 131,040.000 KWH
INDIAN RIDGE MIDDLE 172,560.000 KWH 162,840.000 KWH
INDIAN TRACE ELEM 437,283.000 KWH 400,250.000 KWH
JAMES HUNT ELEMENTARY 218,208.000 KWH 184,200.000 KWH
KATHLEEN WRIGHT ADMIN 162,480.000 KWH 141,120.000 KWH
LAKE FOREST ELEM 70,800.000 KWH 63,600.000 KWH
LAKESIDE ELEMENTARY 154,797.000 KWH 135,308.000 KWH
LANIER JAMES CENTER 204,120.000 KWH 182,640.000 KWH
LARKDALE ELEM 272,160.000 KWH 215,280.000 KWH
LAUDERDALE LAKES MIDDLE 193,320.000 KWH 173,640.000 KWH
LAUDERDALE MANORS ELEM 5,578.000 KWH 4,350.000 KWH
LAUDERHILL MIDDLE 155,400.000 KWH 164,520.000 KWH
LAUDERHILL MIDDLE/COMM 171,360.000 KWH 167,280.000 KWH
LAUDERHILL PT ELEM 106,560.000 KWH 100,320.000 KWH
LIBERTY ELEMENTARY 83,520.000 KWH 67,200.000 KWH
LLOYD ESTATES ELEM 369,600.000 KWH 334,800.000 KWH
LOCKHART STADIUM 210,761.000 KWH 197,521.000 KWH
LYONS CREEK MIDDLE 165,720.000 KWH 141,720.000 KWH
MANATEE BAY ELEMENTARY 188,100.000 KWH 227,520.000 KWH
MAPLEWOOD ELEM 307,609.000 KWH 237,144.000 KWH
MARGATE ELEM 129,526.000 KWH 124,410.000 KWH
MARGATE MIDDLE 168,120.000 KWH 164,509.000 KWH
MARKHAM ELEM 502,773.000 KWH 471,173.000 KWH
MARTIN LUTHER KING ELEM 378,720.000 KWH 359,280.000 KWH
MCARTHUR HIGH 195,840.000 KWH 135,417.000 KWH
MCFATTER VO TECH 316,800.000 KWH 271,920.000 KWH
MCNAB ELEMENTARY 138,393.000 KWH 174,421.000 KWH
MCNICOL MIDDLE 394,320.000 KWH 328,320.000 KWH
MEADOWBROOK ELEM 151,920.000 KWH 121,200.000 KWH
MILLENNIUM MIDDLE 547,254.000 KWH 546,650.000 KWH
MIRAMAR ELEM 107,280.000 KWH 104,160.000 KWH
MIRAMAR HIGH 462,800.000 KWH 429,600.000 KWH
MIRROR LAKE ELEM 160,440.000 KWH 163,800.000 KWH
MONARCH HIGH 26,040.000 KWH 14,640.000 KWH
MORROW ELEM 216,744.000 KWH 220,824.000 KWH
MULTICULTURAL CENTER 267,023.000 KWH 246,858.000 KWH
N ANDREWS GARDENS ELEM 181,164.000 KWH 54,984.000 KWH
NEW RENAISSANCE MIDDLE 313,200.000 KWH 243,360.000 KWH
NEW RIVER MIDDLE SCHOOL 134,040.000 KWH 138,360.000 KWH
NOB HILL ELEM 170,872.000 KWH 260,749.000 KWH
NORCREST ELEM 43,920.000 KWH 37,620.000 KWH
NORTH AREA MAINT/WHSE 7,477.000 KWH 10,135.000 KWH
NORTH AREA SUPERINTENDENT 80,318.000 KWH 82,506.000 KWH
NORTH BUS PARKING LOT 111,960.000 KWH 97,500.000 KWH
NORTH CENTRAL SUPERINTENDENT 182,160.000 KWH 138,120.000 KWH
NORTH FORK ELEM 146,640.000 KWH 126,480.000 KWH
NORTH LAUDERDALE ELEM 154,080.000 KWH 132,360.000 KWH
NORTH SIDE ELEMENTARY 382,112.000 KWH 387,896.000 KWH
NORTH WEST TRANSPORTATION 342,400.000 KWH 304,400.000 KWH
NORTHEAST HIGH 14,767.000 KWH 13,656.000 KWH
NOVA BLANCHE FORMAN/EISENHOWER ELEM 6,803.000 KWH 29,146.000 KWH
NOVA EISENHOWER ELEMENTARY 772,800.000 KWH 899,200.000 KWH
NOVA HIGH 74.000 KWH .000 KWH
NOVA HIGH - MECH PLANT 160,800.000 KWH 151,320.000 KWH
NOVA HIGH COMM/GED 158,634.000 KWH 131,901.000 KWH
OAKLAND PARK ELEM 198,600.000 KWH 171,480.000 KWH
OAKRIDGE ELEM 136,760.000 KWH 112,760.000 KWH
OLSEN MIDDLE 187,680.000 KWH 131,040.000 KWH
OLSEN MIDDLE ANNEX 122,880.000 KWH 102,960.000 KWH
ORANGEBROOK ELEM 225,600.000 KWH 154,320.000 KWH
ORIOLE ELEM 194,400.000 KWH 125,520.000 KWH
PALM COVE ELEM 142,200.000 KWH 111,960.000 KWH
PALMVIEW ELEM 229,920.000 KWH 203,520.000 KWH
PANTHER RUN ELEM 35,664.000 KWH 19,768.000 KWH
PARK LAKES ELEMENTARY 120,360.000 KWH 89,400.000 KWH
PARK LAKES ELEMENTARY ANNEX 177,840.000 KWH 158,400.000 KWH
PARK RIDGE ELEM 226,680.000 KWH 209,400.000 KWH
PARK SPRINGS ELEM 189,600.000 KWH 165,120.000 KWH
PARK TRAILS ELEMENTARY 437,582.000 KWH 377,165.000 KWH
PARKSIDE ELEMENTARY 222,535.000 KWH 184,737.000 KWH
PARKWAY MIDDLE 130,740.000 KWH 115,440.000 KWH
PASADENA LAKES ELEM 108,980.000 KWH 109,583.000 KWH
PEMBROKE LAKES ELEM 149,254.000 KWH 157,546.000 KWH
PEMBROKE PINES ELEM 241,920.000 KWH 186,480.000 KWH
PERRY ELEM 166,946.000 KWH 210,291.000 KWH
PERRY MIDDLE 124,080.000 KWH 105,240.000 KWH
PETERS ELEM 102,720.000 KWH 85,440.000 KWH
PHYSICAL PLANT OPERATIONS 177,000.000 KWH 150,720.000 KWH
PINE RIDGE CTR 605,224.000 KWH 254,008.000 KWH
PINES LAKES ELEM 150,600.000 KWH 190,440.000 KWH
PINES MIDDLE 241,106.000 KWH 216,180.000 KWH
PINEWOOD ELEM 43,620.000 KWH 43,320.000 KWH
PIONEER MIDDLE 550,137.000 KWH 532,069.000 KWH
PIONEER MIDDLE ANNEX 154,843.000 KWH 142,780.000 KWH
PIPER HIGH 503,580.000 KWH 445,559.000 KWH
PLANTATION ELEM 250,948.000 KWH 239,466.000 KWH
PLANTATION HIGH 110,553.000 KWH 89,586.000 KWH
PLANTATION MIDDLE 142,920.000 KWH 141,480.000 KWH
PLANTATION PARK ELEM 383,468.000 KWH 299,095.000 KWH
POMPANO BEACH ELEM 279,576.000 KWH 238,008.000 KWH
POMPANO BEACH HIGH 25,990.000 KWH 24,046.000 KWH
POMPANO BEACH MIDDLE 177,000.000 KWH 169,980.000 KWH
PPO ZONE 2 - LEASED 165,360.000 KWH 167,520.000 KWH
QUIET WATERS ELEM 329,520.000 KWH 304,630.000 KWH
RAMBLEWOOD ELEM 247,739.000 KWH 198,129.000 KWH
RAMBLEWOOD MIDDLE 135,000.000 KWH 111,840.000 KWH
RICKARDS MIDDLE 124,560.000 KWH 119,640.000 KWH
RIVERGLADES ELEM 240,720.000 KWH 159,360.000 KWH
RIVERLAND ELEM 103,752.000 KWH 91,992.000 KWH
RIVERSIDE ELEM 187,423.000 KWH 184,137.000 KWH
ROCK ISLAND ADMIN 117,600.000 KWH 108,800.000 KWH
ROYAL PALM ELEMENTARY 256,800.000 KWH 172,680.000 KWH
SAFETY DEPARTMENT 183,960.000 KWH 171,000.000 KWH
SANDERS PARK ELEM 256,560.000 KWH 244,320.000 KWH
SANDPIPER ELEM 205,200.000 KWH 188,640.000 KWH
SAWGRASS ELEM 158,628.000 KWH 107,885.000 KWH
SAWGRASS SPRINGS MIDDLE 258,480.000 KWH 216,720.000 KWH
SEA CASTLE ELEM 117,441.000 KWH 105,156.000 KWH
SEAGULL SCHOOL 171,600.000 KWH 135,600.000 KWH
SEMINOLE MIDDLE 417,120.000 KWH 353,760.000 KWH
SHERIDAN HILLS ELEM 148,080.000 KWH 122,040.000 KWH
SHERIDAN PARK ELEM 271,920.000 KWH 186,960.000 KWH
SHERIDAN VOCATIONAL 180,720.000 KWH 158,520.000 KWH
SILVER LAKES ELEMENTARY 246,000.000 KWH 235,200.000 KWH
SILVER LAKES MIDDLE 259,440.000 KWH 139,440.000 KWH
SILVER PALMS ELEM 302,160.000 KWH 278,640.000 KWH
SILVER RIDGE ELEM 46,147.000 KWH 41,812.000 KWH
SILVER SHORES ELEMENTARY 21,325.000 KWH 19,016.000 KWH
SILVER TRAIL MIDDLE 488,681.000 KWH 433,201.000 KWH
SOUTH AREA BUS PARKING 573,860.000 KWH 561,626.000 KWH
SOUTH AREA MAINTENANCE 1,995.000 KWH 35,898.000 KWH
SOUTH BROWARD HIGH 150,315.000 KWH 160,799.000 KWH
SOUTH PLANTATION HIGH 115,920.000 KWH 110,160.000 KWH
SOUTH WEST BUS LOT 585,200.000 KWH 495,935.000 KWH
STEPHEN FOSTER ELEM 503,464.000 KWH 501,010.000 KWH
STIRLING ELEM 129,600.000 KWH 109,920.000 KWH
STONEMAN DOUGLAS HIGH 267,632.000 KWH 252,635.000 KWH
STRANAHAN HIGH 162,000.000 KWH 144,000.000 KWH
SUNLAND PARK ELEM 162,672.000 KWH 105,912.000 KWH
SUNRISE MIDDLE 135,881.000 KWH 110,318.000 KWH
SUNSET LAKES ELEMENTARY 206,640.000 KWH 176,400.000 KWH
SUNSET SCHOOL 566,517.000 KWH 498,787.000 KWH
SUNSHINE ELEMENTARY 363,840.000 KWH 360,240.000 KWH
TAMARAC ELEM 161,969.000 KWH 147,843.000 KWH
TARAVELLA HIGH 295,680.000 KWH 228,840.000 KWH
TECHNOLOGY AND SUPPORT SERVICE 117,960.000 KWH 114,600.000 KWH
TEDDER ELEMENTARY SCHOOL 142,704.000 KWH 135,144.000 KWH
TEQUESTA TRACE MIDDLE 224,280.000 KWH 183,360.000 KWH
THE QUEST CENTER .000 KWH 12,360.000 KWH
THURGOOD MARSHALL ELEM 123,942.000 KWH 125,694.000 KWH
TRADEWINDS ELEM 68,640.000 KWH 63,360.000 KWH
TROPICAL ELEM 4,203.000 KWH 2,738.000 KWH
TWIN LAKES ANNEX/NEW WHSE 120,483.000 KWH 111,566.000 KWH
TWIN LAKES COMPLEX 98,640.000 KWH 91,680.000 KWH
VEHICLE MAINTENANCE 193,920.000 KWH 197,280.000 KWH
VILLAGE ELEM 147,840.000 KWH 96,360.000 KWH
VIRGINIA YOUNG ELEM 292,651.000 KWH 221,102.000 KWH
WALKER ELEM 477,707.000 KWH 452,540.000 KWH
WALTER C YOUNG MIDDLE 157,920.000 KWH 154,080.000 KWH
WATKINS ELEM 133,200.000 KWH 129,600.000 KWH
WELLEBY ELEM .000 KWH 436,800.000 KWH
WEST CENTRAL BUS COMPLEX 64,396.000 KWH 68,894.000 KWH
WEST HOLLYWOOD ELEM 124,920.000 KWH 122,400.000 KWH
WESTCHESTER ELEMENTARY 170,725.000 KWH 169,419.000 KWH
WESTERN HIGH 500,975.000 KWH 499,553.000 KWH
WESTGLADES MIDDLE 317,280.000 KWH 311,040.000 KWH
WESTPINE MIDDLE 205,200.000 KWH 164,400.000 KWH
WESTWOOD HEIGHTS ELEM 191,756.000 KWH 158,443.000 KWH
WHIDDON-ROGERS ED CENTER 180,000.000 KWH 180,800.000 KWH
WHISPERING PINES 92,160.000 KWH 85,440.000 KWH
WILLIAM DANDY MIDDLE 261,840.000 KWH 237,840.000 KWH
WILTON MANORS ELEM 158,760.000 KWH 138,420.000 KWH
WINGATE OAKS CTR 117,960.000 KWH 103,560.000 KWH
WINSTON PARK ELEM 216,240.000 KWH 193,200.000 KWH