Building
Name |
Oct-07 |
Oct-08 |
| APOLLO
MIDDLE |
229,440.000
KWH |
275,280.000
KWH |
| ARTHUR
ASHE MIDDLE |
360,000.000
KWH |
327,600.000
KWH |
| ATLANTIC
VOC CENTER |
630,328.000
KWH |
577,417.000
KWH |
| ATLANTIC
WEST ELEM |
187,680.000
KWH |
156,000.000
KWH |
| ATTUCKS
MIDDLE |
321,851.000
KWH |
253,200.000
KWH |
| BAIR
MIDDLE |
224,640.000
KWH |
198,000.000
KWH |
| BANYAN
ELEM |
168,840.000
KWH |
153,480.000
KWH |
| BAYVIEW
ELEM |
109,440.000
KWH |
95,040.000
KWH |
| BECON |
213,600.000
KWH |
260,640.000
KWH |
| BENNETT
ELEM |
111,360.000
KWH |
107,040.000
KWH |
| BETHUNE
ELEM |
229,560.000
KWH |
191,040.000
KWH |
| BOULEVARD
HEIGHTS ELEM |
121,080.000
KWH |
150,240.000
KWH |
| BOYD
ANDERSON HIGH |
485,723.000
KWH |
414,071.000
KWH |
| BRIGHT
HORIZONS CTR |
154,560.000
KWH |
112,080.000
KWH |
| BROADVIEW
ELEM |
167,990.000
KWH |
138,258.000
KWH |
| BROWARD
EDUCATION FOUNDATION |
3,148.000
KWH |
.000
KWH |
| BROWARD
ESTATES ELEM |
208,597.000
KWH |
145,704.000
KWH |
| BROWARD
FIRE ACADEMY |
37,200.000
KWH |
37,645.000
KWH |
| CASTLE
HILL ELEM |
156,120.000
KWH |
149,280.000
KWH |
| CENTRAL
AREA ADMINISTRATIVE |
167,990.000
KWH |
.000
KWH |
| CENTRAL
PARK ELEM |
3,148.000
KWH |
167,280.000
KWH |
| CHALLENGER
ELEMENTARY |
208,597.000
KWH |
164,640.000
KWH |
| CHAPEL
TRAIL ELEM |
37,200.000
KWH |
224,989.000
KWH |
| CHARLES
DREW ELEM |
156,120.000
KWH |
133,560.000
KWH |
| COCONUT
CREEK ELEM |
147,582.000
KWH |
113,126.000
KWH |
| COCONUT
CREEK HIGH |
501,373.000
KWH |
372,589.000
KWH |
| COCONUT
PALM ELEMENTARY |
191,760.000
KWH |
170,760.000
KWH |
| COLBERT
ELEM |
126,000.000
KWH |
136,080.000
KWH |
| COLLINS
ELEM |
85,200.000
KWH |
71,520.000
KWH |
| COMMUNITY
SCHOOL SOUTH |
.000
KWH |
10,008.000
KWH |
| COOPER
CITY COMM |
9,616.000
KWH |
8,660.000
KWH |
| COOPER
CITY ELEM |
140,640.000
KWH |
143,760.000
KWH |
| COOPER
CITY HIGH |
646,391.000
KWH |
590,845.000
KWH |
| CORAL
COVE ELEMENTARY |
142,560.000
KWH |
125,760.000
KWH |
| CORAL
GLADES HIGH |
516,480.000
KWH |
377,040.000
KWH |
| CORAL
PARK ELEM |
143,520.000
KWH |
161,400.000
KWH |
| CORAL
SPRINGS ELEM |
150,240.000
KWH |
138,960.000
KWH |
| CORAL
SPRINGS COMMUNITY |
486,529.000
KWH |
497,900.000
KWH |
| CORAL
SPRINGS HIGH |
276,840.000
KWH |
250,040.000
KWH |
| CORAL
SPRINGS MIDDLE |
218,280.000
KWH |
161,640.000
KWH |
| COUNTRY
HILLS ELEM |
215,040.000
KWH |
188,760.000
KWH |
| COUNTRY
ISLES ELEM |
137,040.000
KWH |
122,400.000
KWH |
| CRESTHAVEN
ELEM |
154,403.000
KWH |
136,933.000
KWH |
| CROISSANT
PARK ELEM |
95,220.000
KWH |
87,360.000
KWH |
| CROSS
CREEK |
11,000.000
KWH |
8,709.000
KWH |
| CRYSTAL
LAKE COMM SCHOOL |
274,205.000
KWH |
227,125.000
KWH |
| CRYSTAL
LAKE MIDDLE |
565,200.000
KWH |
581,200.000
KWH |
| CYPRESS
BAY HIGH |
254,124.000
KWH |
81,360.000
KWH |
| CYPRESS
BAY HIGH ANNEX |
120,000.000
KWH |
103,920.000
KWH |
| CYPRESS
ELEM |
58,695.000
KWH |
81,845.000
KWH |
| CYPRESS
RUN ALTERNATIVE |
131,169.000
KWH |
159,839.000
KWH |
| DANIA
ELEM |
140,640.000
KWH |
108,480.000
KWH |
| DAVE
THOMAS ED CENTER (WEST) |
46,733.000
KWH |
42,804.000
KWH |
| DAVE
THOMAS EDUCATION CENTER |
154,236.000
KWH |
137,854.000
KWH |
| DAVIE
ELEM |
186,712.000
KWH |
176,760.000
KWH |
| DEERFIELD
BEACH ELEM |
455,705.000
KWH |
400,445.000
KWH |
| DEERFIELD
BEACH HIGH |
329,116.000
KWH |
287,194.000
KWH |
| DEERFIELD
BEACH MID |
138,120.000
KWH |
114,120.000
KWH |
| DEERFIELD
PARK ELEM |
175,080.000
KWH |
151,680.000
KWH |
| DILLARD
ELEM |
6,382.000
KWH |
.000
KWH |
| DILLARD
HIGH COMM |
750,678.000
KWH |
779,624.000
KWH |
| DILLARD
HIGH SCHOOL |
141,120.000
KWH |
120,720.000
KWH |
| DOLPHIN
BAY ELEMENTARY |
102,679.000
KWH |
81,770.000
KWH |
| DREW
RESOURCE CTR |
116,434.000
KWH |
110,107.000
KWH |
| DRIFTWOOD
ELEM |
224,436.000
KWH |
413,280.000
KWH |
| DRIFTWOOD
MIDDLE |
247,560.000
KWH |
222,840.000
KWH |
| EAGLE
POINT ELEM |
198,240.000
KWH |
160,440.000
KWH |
| EAGLE
RIDGE ELEM |
29,292.000
KWH |
28,128.000
KWH |
| ECIA
SPECIAL PROGRAMS |
76,216.000
KWH |
54,136.000
KWH |
| EDGEWOOD
CENTER |
743,536.000
KWH |
720,426.000
KWH |
| ELY
HIGH |
119,280.000
KWH |
116,280.000
KWH |
| EMBASSY
CREEK ELEM |
97,800.000
KWH |
104,760.000
KWH |
| ENDEAVOR
LEARNING CENTER |
164,081.000
KWH |
107,764.000
KWH |
| EVERGLADES
9TH GRADE ANNEX |
271,857.000
KWH |
251,979.000
KWH |
| EVERGLADES
ELEMENTARY |
734,160.000
KWH |
539,760.000
KWH |
| EVERGLADES
HIGH |
236,520.000
KWH |
230,520.000
KWH |
| FAIRWAY
ELEM |
444,534.000
KWH |
399,866.000
KWH |
| FALCON
COVE MIDDLE |
159,928.000
KWH |
131,848.000
KWH |
| FLAMINGO
ELEM |
670,475.000
KWH |
534,220.000
KWH |
| FLANAGAN
HIGH |
157,896.000
KWH |
131,136.000
KWH |
| FLORANADA
ELEM |
280,703.000
KWH |
217,957.000
KWH |
| FOREST
GLEN MIDDLE |
147,120.000
KWH |
135,840.000
KWH |
| FOREST
HILLS ELEM |
616,700.000
KWH |
638,213.000
KWH |
| FORT
LAUDERDALE HIGH |
190,440.000
KWH |
193,080.000
KWH |
| FORT
LAUDERDALE HIGH ANNEX |
273,600.000
KWH |
297,840.000
KWH |
| FOX
TRAIL ELEMENTARY |
344,400.000
KWH |
333,600.000
KWH |
| GATOR
RUN ELEMENTARY |
129,840.000
KWH |
108,120.000
KWH |
| GLADES
MIDDLE |
105,000.000
KWH |
90,720.000
KWH |
| GRIFFIN
ELEM |
221,913.000
KWH |
186,093.000
KWH |
| GULFSTREAM
MIDDLE SCHOOL |
208,080.000
KWH |
138,960.000
KWH |
| HALLANDALE
ADULT CENTER |
326,044.000
KWH |
312,344.000
KWH |
| HALLANDALE
ELEM |
118,896.000
KWH |
79,368.000
KWH |
| HALLANDALE
HIGH |
189,360.000
KWH |
161,767.000
KWH |
| HARBORDALE
ELEM |
37,560.000
KWH |
34,500.000
KWH |
| HAWKES
BLUFF ELEM |
123,360.000
KWH |
102,480.000
KWH |
| HOLLYWOOD
CENTRAL AUDITORIUM |
3,619.000
KWH |
3,028.000
KWH |
| HOLLYWOOD
CENTRAL ELEM |
95,280.000
KWH |
170,640.000
KWH |
| HOLLYWOOD
HILLS COMMUNITY |
452,299.000
KWH |
389,444.000
KWH |
| HOLLYWOOD
HILLS ELEMENTARY |
123,360.000
KWH |
93,120.000
KWH |
| HOLLYWOOD
HILLS HIGH |
153,600.000
KWH |
113,520.000
KWH |
| HOLLYWOOD
PARK ELEM |
72,555.000
KWH |
64,273.000
KWH |
| HORIZON
ELEM |
377,525.000
KWH |
319,859.000
KWH |
| HORTT
ADMIN SITE |
150,840.000
KWH |
131,040.000
KWH |
| INDIAN
RIDGE MIDDLE |
172,560.000
KWH |
162,840.000
KWH |
| INDIAN
TRACE ELEM |
437,283.000
KWH |
400,250.000
KWH |
| JAMES
HUNT ELEMENTARY |
218,208.000
KWH |
184,200.000
KWH |
| KATHLEEN
WRIGHT ADMIN |
162,480.000
KWH |
141,120.000
KWH |
| LAKE
FOREST ELEM |
70,800.000
KWH |
63,600.000
KWH |
| LAKESIDE
ELEMENTARY |
154,797.000
KWH |
135,308.000
KWH |
| LANIER
JAMES CENTER |
204,120.000
KWH |
182,640.000
KWH |
| LARKDALE
ELEM |
272,160.000
KWH |
215,280.000
KWH |
| LAUDERDALE
LAKES MIDDLE |
193,320.000
KWH |
173,640.000
KWH |
| LAUDERDALE
MANORS ELEM |
5,578.000
KWH |
4,350.000
KWH |
| LAUDERHILL
MIDDLE |
155,400.000
KWH |
164,520.000
KWH |
| LAUDERHILL
MIDDLE/COMM |
171,360.000
KWH |
167,280.000
KWH |
| LAUDERHILL
PT ELEM |
106,560.000
KWH |
100,320.000
KWH |
| LIBERTY
ELEMENTARY |
83,520.000
KWH |
67,200.000
KWH |
| LLOYD
ESTATES ELEM |
369,600.000
KWH |
334,800.000
KWH |
| LOCKHART
STADIUM |
210,761.000
KWH |
197,521.000
KWH |
| LYONS
CREEK MIDDLE |
165,720.000
KWH |
141,720.000
KWH |
| MANATEE
BAY ELEMENTARY |
188,100.000
KWH |
227,520.000
KWH |
| MAPLEWOOD
ELEM |
307,609.000
KWH |
237,144.000
KWH |
| MARGATE
ELEM |
129,526.000
KWH |
124,410.000
KWH |
| MARGATE
MIDDLE |
168,120.000
KWH |
164,509.000
KWH |
| MARKHAM
ELEM |
502,773.000
KWH |
471,173.000
KWH |
| MARTIN
LUTHER KING ELEM |
378,720.000
KWH |
359,280.000
KWH |
| MCARTHUR
HIGH |
195,840.000
KWH |
135,417.000
KWH |
| MCFATTER
VO TECH |
316,800.000
KWH |
271,920.000
KWH |
| MCNAB
ELEMENTARY |
138,393.000
KWH |
174,421.000
KWH |
| MCNICOL
MIDDLE |
394,320.000
KWH |
328,320.000
KWH |
| MEADOWBROOK
ELEM |
151,920.000
KWH |
121,200.000
KWH |
| MILLENNIUM
MIDDLE |
547,254.000
KWH |
546,650.000
KWH |
| MIRAMAR
ELEM |
107,280.000
KWH |
104,160.000
KWH |
| MIRAMAR
HIGH |
462,800.000
KWH |
429,600.000
KWH |
| MIRROR
LAKE ELEM |
160,440.000
KWH |
163,800.000
KWH |
| MONARCH
HIGH |
26,040.000
KWH |
14,640.000
KWH |
| MORROW
ELEM |
216,744.000
KWH |
220,824.000
KWH |
| MULTICULTURAL
CENTER |
267,023.000
KWH |
246,858.000
KWH |
| N
ANDREWS GARDENS ELEM |
181,164.000
KWH |
54,984.000
KWH |
| NEW
RENAISSANCE MIDDLE |
313,200.000
KWH |
243,360.000
KWH |
| NEW
RIVER MIDDLE SCHOOL |
134,040.000
KWH |
138,360.000
KWH |
| NOB
HILL ELEM |
170,872.000
KWH |
260,749.000
KWH |
| NORCREST
ELEM |
43,920.000
KWH |
37,620.000
KWH |
| NORTH
AREA MAINT/WHSE |
7,477.000
KWH |
10,135.000
KWH |
| NORTH
AREA SUPERINTENDENT |
80,318.000
KWH |
82,506.000
KWH |
| NORTH
BUS PARKING LOT |
111,960.000
KWH |
97,500.000
KWH |
| NORTH
CENTRAL SUPERINTENDENT |
182,160.000
KWH |
138,120.000
KWH |
| NORTH
FORK ELEM |
146,640.000
KWH |
126,480.000
KWH |
| NORTH
LAUDERDALE ELEM |
154,080.000
KWH |
132,360.000
KWH |
| NORTH
SIDE ELEMENTARY |
382,112.000
KWH |
387,896.000
KWH |
| NORTH
WEST TRANSPORTATION |
342,400.000
KWH |
304,400.000
KWH |
| NORTHEAST
HIGH |
14,767.000
KWH |
13,656.000
KWH |
| NOVA
BLANCHE FORMAN/EISENHOWER ELEM |
6,803.000
KWH |
29,146.000
KWH |
| NOVA
EISENHOWER ELEMENTARY |
772,800.000
KWH |
899,200.000
KWH |
| NOVA
HIGH |
74.000
KWH |
.000
KWH |
| NOVA
HIGH - MECH PLANT |
160,800.000
KWH |
151,320.000
KWH |
| NOVA
HIGH COMM/GED |
158,634.000
KWH |
131,901.000
KWH |
| OAKLAND
PARK ELEM |
198,600.000
KWH |
171,480.000
KWH |
| OAKRIDGE
ELEM |
136,760.000
KWH |
112,760.000
KWH |
| OLSEN
MIDDLE |
187,680.000
KWH |
131,040.000
KWH |
| OLSEN
MIDDLE ANNEX |
122,880.000
KWH |
102,960.000
KWH |
| ORANGEBROOK
ELEM |
225,600.000
KWH |
154,320.000
KWH |
| ORIOLE
ELEM |
194,400.000
KWH |
125,520.000
KWH |
| PALM
COVE ELEM |
142,200.000
KWH |
111,960.000
KWH |
| PALMVIEW
ELEM |
229,920.000
KWH |
203,520.000
KWH |
| PANTHER
RUN ELEM |
35,664.000
KWH |
19,768.000
KWH |
| PARK
LAKES ELEMENTARY |
120,360.000
KWH |
89,400.000
KWH |
| PARK
LAKES ELEMENTARY ANNEX |
177,840.000
KWH |
158,400.000
KWH |
| PARK
RIDGE ELEM |
226,680.000
KWH |
209,400.000
KWH |
| PARK
SPRINGS ELEM |
189,600.000
KWH |
165,120.000
KWH |
| PARK
TRAILS ELEMENTARY |
437,582.000
KWH |
377,165.000
KWH |
| PARKSIDE
ELEMENTARY |
222,535.000
KWH |
184,737.000
KWH |
| PARKWAY
MIDDLE |
130,740.000
KWH |
115,440.000
KWH |
| PASADENA
LAKES ELEM |
108,980.000
KWH |
109,583.000
KWH |
| PEMBROKE
LAKES ELEM |
149,254.000
KWH |
157,546.000
KWH |
| PEMBROKE
PINES ELEM |
241,920.000
KWH |
186,480.000
KWH |
| PERRY
ELEM |
166,946.000
KWH |
210,291.000
KWH |
| PERRY
MIDDLE |
124,080.000
KWH |
105,240.000
KWH |
| PETERS
ELEM |
102,720.000
KWH |
85,440.000
KWH |
| PHYSICAL
PLANT OPERATIONS |
177,000.000
KWH |
150,720.000
KWH |
| PINE
RIDGE CTR |
605,224.000
KWH |
254,008.000
KWH |
| PINES
LAKES ELEM |
150,600.000
KWH |
190,440.000
KWH |
| PINES
MIDDLE |
241,106.000
KWH |
216,180.000
KWH |
| PINEWOOD
ELEM |
43,620.000
KWH |
43,320.000
KWH |
| PIONEER
MIDDLE |
550,137.000
KWH |
532,069.000
KWH |
| PIONEER
MIDDLE ANNEX |
154,843.000
KWH |
142,780.000
KWH |
| PIPER
HIGH |
503,580.000
KWH |
445,559.000
KWH |
| PLANTATION
ELEM |
250,948.000
KWH |
239,466.000
KWH |
| PLANTATION
HIGH |
110,553.000
KWH |
89,586.000
KWH |
| PLANTATION
MIDDLE |
142,920.000
KWH |
141,480.000
KWH |
| PLANTATION
PARK ELEM |
383,468.000
KWH |
299,095.000
KWH |
| POMPANO
BEACH ELEM |
279,576.000
KWH |
238,008.000
KWH |
| POMPANO
BEACH HIGH |
25,990.000
KWH |
24,046.000
KWH |
| POMPANO
BEACH MIDDLE |
177,000.000
KWH |
169,980.000
KWH |
| PPO
ZONE 2 - LEASED |
165,360.000
KWH |
167,520.000
KWH |
| QUIET
WATERS ELEM |
329,520.000
KWH |
304,630.000
KWH |
| RAMBLEWOOD
ELEM |
247,739.000
KWH |
198,129.000
KWH |
| RAMBLEWOOD
MIDDLE |
135,000.000
KWH |
111,840.000
KWH |
| RICKARDS
MIDDLE |
124,560.000
KWH |
119,640.000
KWH |
| RIVERGLADES
ELEM |
240,720.000
KWH |
159,360.000
KWH |
| RIVERLAND
ELEM |
103,752.000
KWH |
91,992.000
KWH |
| RIVERSIDE
ELEM |
187,423.000
KWH |
184,137.000
KWH |
| ROCK
ISLAND ADMIN |
117,600.000
KWH |
108,800.000
KWH |
| ROYAL
PALM ELEMENTARY |
256,800.000
KWH |
172,680.000
KWH |
| SAFETY
DEPARTMENT |
183,960.000
KWH |
171,000.000
KWH |
| SANDERS
PARK ELEM |
256,560.000
KWH |
244,320.000
KWH |
| SANDPIPER
ELEM |
205,200.000
KWH |
188,640.000
KWH |
| SAWGRASS
ELEM |
158,628.000
KWH |
107,885.000
KWH |
| SAWGRASS
SPRINGS MIDDLE |
258,480.000
KWH |
216,720.000
KWH |
| SEA
CASTLE ELEM |
117,441.000
KWH |
105,156.000
KWH |
| SEAGULL
SCHOOL |
171,600.000
KWH |
135,600.000
KWH |
| SEMINOLE
MIDDLE |
417,120.000
KWH |
353,760.000
KWH |
| SHERIDAN
HILLS ELEM |
148,080.000
KWH |
122,040.000
KWH |
| SHERIDAN
PARK ELEM |
271,920.000
KWH |
186,960.000
KWH |
| SHERIDAN
VOCATIONAL |
180,720.000
KWH |
158,520.000
KWH |
| SILVER
LAKES ELEMENTARY |
246,000.000
KWH |
235,200.000
KWH |
| SILVER
LAKES MIDDLE |
259,440.000
KWH |
139,440.000
KWH |
| SILVER
PALMS ELEM |
302,160.000
KWH |
278,640.000
KWH |
| SILVER
RIDGE ELEM |
46,147.000
KWH |
41,812.000
KWH |
| SILVER
SHORES ELEMENTARY |
21,325.000
KWH |
19,016.000
KWH |
| SILVER
TRAIL MIDDLE |
488,681.000
KWH |
433,201.000
KWH |
| SOUTH
AREA BUS PARKING |
573,860.000
KWH |
561,626.000
KWH |
| SOUTH
AREA MAINTENANCE |
1,995.000
KWH |
35,898.000
KWH |
| SOUTH
BROWARD HIGH |
150,315.000
KWH |
160,799.000
KWH |
| SOUTH
PLANTATION HIGH |
115,920.000
KWH |
110,160.000
KWH |
| SOUTH
WEST BUS LOT |
585,200.000
KWH |
495,935.000
KWH |
| STEPHEN
FOSTER ELEM |
503,464.000
KWH |
501,010.000
KWH |
| STIRLING
ELEM |
129,600.000
KWH |
109,920.000
KWH |
| STONEMAN
DOUGLAS HIGH |
267,632.000
KWH |
252,635.000
KWH |
| STRANAHAN
HIGH |
162,000.000
KWH |
144,000.000
KWH |
| SUNLAND
PARK ELEM |
162,672.000
KWH |
105,912.000
KWH |
| SUNRISE
MIDDLE |
135,881.000
KWH |
110,318.000
KWH |
| SUNSET
LAKES ELEMENTARY |
206,640.000
KWH |
176,400.000
KWH |
| SUNSET
SCHOOL |
566,517.000
KWH |
498,787.000
KWH |
| SUNSHINE
ELEMENTARY |
363,840.000
KWH |
360,240.000
KWH |
| TAMARAC
ELEM |
161,969.000
KWH |
147,843.000
KWH |
| TARAVELLA
HIGH |
295,680.000
KWH |
228,840.000
KWH |
| TECHNOLOGY
AND SUPPORT SERVICE |
117,960.000
KWH |
114,600.000
KWH |
| TEDDER
ELEMENTARY SCHOOL |
142,704.000
KWH |
135,144.000
KWH |
| TEQUESTA
TRACE MIDDLE |
224,280.000
KWH |
183,360.000
KWH |
| THE
QUEST CENTER |
.000
KWH |
12,360.000
KWH |
| THURGOOD
MARSHALL ELEM |
123,942.000
KWH |
125,694.000
KWH |
| TRADEWINDS
ELEM |
68,640.000
KWH |
63,360.000
KWH |
| TROPICAL
ELEM |
4,203.000
KWH |
2,738.000
KWH |
| TWIN
LAKES ANNEX/NEW WHSE |
120,483.000
KWH |
111,566.000
KWH |
| TWIN
LAKES COMPLEX |
98,640.000
KWH |
91,680.000
KWH |
| VEHICLE
MAINTENANCE |
193,920.000
KWH |
197,280.000
KWH |
| VILLAGE
ELEM |
147,840.000
KWH |
96,360.000
KWH |
| VIRGINIA
YOUNG ELEM |
292,651.000
KWH |
221,102.000
KWH |
| WALKER
ELEM |
477,707.000
KWH |
452,540.000
KWH |
| WALTER
C YOUNG MIDDLE |
157,920.000
KWH |
154,080.000
KWH |
| WATKINS
ELEM |
133,200.000
KWH |
129,600.000
KWH |
| WELLEBY
ELEM |
.000
KWH |
436,800.000
KWH |
| WEST
CENTRAL BUS COMPLEX |
64,396.000
KWH |
68,894.000
KWH |
| WEST
HOLLYWOOD ELEM |
124,920.000
KWH |
122,400.000
KWH |
| WESTCHESTER
ELEMENTARY |
170,725.000
KWH |
169,419.000
KWH |
| WESTERN
HIGH |
500,975.000
KWH |
499,553.000
KWH |
| WESTGLADES
MIDDLE |
317,280.000
KWH |
311,040.000
KWH |
| WESTPINE
MIDDLE |
205,200.000
KWH |
164,400.000
KWH |
| WESTWOOD
HEIGHTS ELEM |
191,756.000
KWH |
158,443.000
KWH |
| WHIDDON-ROGERS
ED CENTER |
180,000.000
KWH |
180,800.000
KWH |
| WHISPERING
PINES |
92,160.000
KWH |
85,440.000
KWH |
| WILLIAM
DANDY MIDDLE |
261,840.000
KWH |
237,840.000
KWH |
| WILTON
MANORS ELEM |
158,760.000
KWH |
138,420.000
KWH |
| WINGATE
OAKS CTR |
117,960.000
KWH |
103,560.000
KWH |
| WINSTON
PARK ELEM |
216,240.000
KWH |
193,200.000
KWH |
|