Building |
Oct-08 |
Oct-09 |
| APOLLO MIDDLE |
275,280.000 KWH |
268,800.000 KWH |
| ARTHUR ASHE MIDDLE |
327,600.000 KWH |
323,200.000 KWH |
| ATLANTIC VOC CENTER |
577,417.000 KWH |
605,451.000 KWH |
| ATLANTIC WEST ELEM |
156,000.000 KWH |
132,720.000 KWH |
| ATTUCKS MIDDLE |
253,200.000 KWH |
300,680.000 KWH |
| BAIR MIDDLE |
198,000.000 KWH |
209,520.000 KWH |
| BANYAN ELEM |
153,480.000 KWH |
141,720.000 KWH |
| BAYVIEW ELEM |
95,040.000 KWH |
96,120.000 KWH |
| BECON |
260,640.000 KWH |
192,140.000 KWH |
| BENNETT ELEM |
107,040.000 KWH |
109,920.000 KWH |
| BETHUNE ELEM |
191,040.000 KWH |
216,120.000 KWH |
| BOULEVARD HEIGHTS ELEM |
150,240.000 KWH |
141,600.000 KWH |
| BOYD ANDERSON HIGH |
414,071.000 KWH |
519,076.000 KWH |
| BRIGHT HORIZONS CTR |
112,080.000 KWH |
127,680.000 KWH |
| BROADVIEW ELEM |
138,258.000 KWH |
157,105.000 KWH |
| BROWARD ESTATES ELEM |
145,704.000 KWH |
148,176.000 KWH |
| BROWARD FIRE ACADEMY |
37,645.000 KWH |
41,095.000 KWH |
| CASTLE HILL ELEM |
149,280.000 KWH |
150,000.000 KWH |
| CENTRAL PARK ELEM |
167,280.000 KWH |
199,440.000 KWH |
| CHALLENGER ELEMENTARY |
164,640.000 KWH |
194,280.000 KWH |
| CHAPEL TRAIL ELEM |
224,989.000 KWH |
186,935.000 KWH |
| CHARLES DREW ELEM |
133,560.000 KWH |
139,800.000 KWH |
| COCONUT CREEK ELEM |
113,126.000 KWH |
108,164.000 KWH |
| COCONUT CREEK HIGH |
372,589.000 KWH |
377,591.000 KWH |
| COCONUT PALM ELEMENTARY |
170,760.000 KWH |
135,240.000 KWH |
| COLBERT ELEM |
136,080.000 KWH |
137,280.000 KWH |
| COLLINS ELEM |
71,520.000 KWH |
81,120.000 KWH |
| COMMUNITY SCHOOL NORTH |
29,640.000 KWH |
28,920.000 KWH |
| COMMUNITY SCHOOL SOUTH |
10,008.000 KWH |
10,800.000 KWH |
| COOPER CITY COMM |
8,660.000 KWH |
6,671.000 KWH |
| COOPER CITY ELEM |
143,760.000 KWH |
135,600.000 KWH |
| COOPER CITY HIGH |
590,845.000 KWH |
533,393.000 KWH |
| CORAL COVE ELEMENTARY |
125,760.000 KWH |
134,400.000 KWH |
| CORAL GLADES HIGH |
377,040.000 KWH |
412,320.000 KWH |
| CORAL PARK ELEM |
161,400.000 KWH |
137,160.000 KWH |
| CORAL SPRINGS ELEM |
138,960.000 KWH |
129,600.000 KWH |
| CORAL SPRINGS HIGH |
497,900.000 KWH |
491,121.000 KWH |
| CORAL SPRINGS MIDDLE |
250,040.000 KWH |
230,440.000 KWH |
| COUNTRY HILLS ELEM |
161,640.000 KWH |
222,360.000 KWH |
| COUNTRY ISLES ELEM |
188,760.000 KWH |
195,600.000 KWH |
| CRESTHAVEN ELEM |
122,400.000 KWH |
145,680.000 KWH |
| CROISSANT PARK ELEM |
136,933.000 KWH |
141,343.000 KWH |
| CROSS CREEK |
87,360.000 KWH |
96,720.000 KWH |
| CRYSTAL LAKE COMM SCHOOL |
8,709.000 KWH |
9,582.000 KWH |
| CRYSTAL LAKE MIDDLE |
227,125.000 KWH |
280,679.000 KWH |
| CYPRESS BAY HIGH |
581,200.000 KWH |
618,000.000 KWH |
| CYPRESS BAY HIGH ANNEX |
81,360.000 KWH |
76,800.000 KWH |
| CYPRESS ELEM |
103,920.000 KWH |
118,080.000 KWH |
| CYPRESS RUN ALTERNATIVE |
81,845.000 KWH |
80,991.000 KWH |
| DANIA ELEM |
159,839.000 KWH |
140,279.000 KWH |
| DAVE THOMAS ED CENTER (WEST) |
108,480.000 KWH |
107,040.000 KWH |
| DAVE THOMAS EDUCATION CENTER |
42,804.000 KWH |
45,886.000 KWH |
| DAVIE ELEM |
137,854.000 KWH |
131,349.000 KWH |
| DEERFIELD BEACH ELEM |
176,760.000 KWH |
178,457.000 KWH |
| DEERFIELD BEACH HIGH |
400,445.000 KWH |
472,954.000 KWH |
| DEERFIELD BEACH MID |
287,194.000 KWH |
316,553.000 KWH |
| DEERFIELD PARK ELEM |
114,120.000 KWH |
151,680.000 KWH |
| DILLARD ELEM |
151,680.000 KWH |
153,000.000 KWH |
| DILLARD HIGH SCHOOL |
779,624.000 KWH |
648,088.000 KWH |
| DISCOVERY ELEMENTARY |
.000 KWH |
185,040.000 KWH |
| DOLPHIN BAY ELEMENTARY |
120,720.000 KWH |
122,640.000 KWH |
| DREW RESOURCE CTR |
81,770.000 KWH |
104,108.000 KWH |
| DRIFTWOOD ELEM |
110,107.000 KWH |
119,773.000 KWH |
| DRIFTWOOD MIDDLE |
413,280.000 KWH |
381,059.000 KWH |
| EAGLE POINT ELEM |
222,840.000 KWH |
231,480.000 KWH |
| EAGLE RIDGE ELEM |
160,440.000 KWH |
165,960.000 KWH |
| ECIA SPECIAL PROGRAMS |
28,128.000 KWH |
29,854.000 KWH |
| EDGEWOOD CENTER |
54,136.000 KWH |
45,136.000 KWH |
| ELY HIGH |
718,176.000 KWH |
712,096.000 KWH |
| EMBASSY CREEK ELEM |
116,280.000 KWH |
145,680.000 KWH |
| ENDEAVOR LEARNING CENTER |
104,760.000 KWH |
92,640.000 KWH |
| EVERGLADES ELEMENTARY |
251,979.000 KWH |
184,593.000 KWH |
| EVERGLADES HIGH |
539,760.000 KWH |
505,200.000 KWH |
| FAIRWAY ELEM |
230,520.000 KWH |
194,640.000 KWH |
| FALCON COVE MIDDLE |
399,866.000 KWH |
388,282.000 KWH |
| FLAMINGO ELEM |
131,848.000 KWH |
143,968.000 KWH |
| FLANAGAN HIGH |
534,220.000 KWH |
557,670.000 KWH |
| FLORANADA ELEM |
131,136.000 KWH |
156,096.000 KWH |
| FOREST GLEN MIDDLE |
217,957.000 KWH |
225,494.000 KWH |
| FOREST HILLS ELEM |
135,840.000 KWH |
130,920.000 KWH |
| FORT LAUDERDALE HIGH |
638,213.000 KWH |
465,799.000 KWH |
| FOX TRAIL ELEMENTARY |
193,080.000 KWH |
183,960.000 KWH |
| GATOR RUN ELEMENTARY |
297,840.000 KWH |
204,480.000 KWH |
| GLADES MIDDLE |
333,600.000 KWH |
332,000.000 KWH |
| GRIFFIN ELEM |
108,120.000 KWH |
104,160.000 KWH |
| GULFSTREAM MIDDLE SCHOOL |
90,720.000 KWH |
93,600.000 KWH |
| HALLANDALE ADULT CENTER |
186,093.000 KWH |
189,867.000 KWH |
| HALLANDALE ELEM |
138,960.000 KWH |
147,360.000 KWH |
| HALLANDALE HIGH |
312,344.000 KWH |
388,177.000 KWH |
| HARBORDALE ELEM |
79,368.000 KWH |
125,688.000 KWH |
| HAWKES BLUFF ELEM |
161,767.000 KWH |
181,203.000 KWH |
| HERON HEIGHTS ELEMENTARY |
.000 KWH |
148,800.000 KWH |
| HOLLYWOOD CENTRAL AUDITORIUM |
34,500.000 KWH |
44,400.000 KWH |
| HOLLYWOOD CENTRAL ELEM |
102,480.000 KWH |
118,560.000 KWH |
| HOLLYWOOD HILLS COMMUNITY |
3,028.000 KWH |
3,298.000 KWH |
| HOLLYWOOD HILLS ELEMENTARY |
170,640.000 KWH |
206,640.000 KWH |
| HOLLYWOOD HILLS HIGH |
389,444.000 KWH |
493,063.000 KWH |
| HOLLYWOOD PARK ELEM |
93,120.000 KWH |
98,400.000 KWH |
| HORIZON ELEM |
113,520.000 KWH |
123,360.000 KWH |
| HORTT ADMIN SITE |
64,273.000 KWH |
58,031.000 KWH |
| INDIAN RIDGE MIDDLE |
319,859.000 KWH |
315,438.000 KWH |
| INDIAN TRACE ELEM |
131,040.000 KWH |
142,200.000 KWH |
| JAMES HUNT ELEMENTARY |
162,840.000 KWH |
131,400.000 KWH |
| KATHLEEN WRIGHT ADMIN |
400,250.000 KWH |
399,384.000 KWH |
| LAKE FOREST ELEM |
184,200.000 KWH |
194,400.000 KWH |
| LAKESIDE ELEMENTARY |
141,120.000 KWH |
129,360.000 KWH |
| LANIER JAMES CENTER |
63,600.000 KWH |
79,200.000 KWH |
| LARKDALE ELEM |
135,308.000 KWH |
136,680.000 KWH |
| LAUDERDALE LAKES MIDDLE |
182,640.000 KWH |
205,578.000 KWH |
| LAUDERDALE MANORS ELEM |
215,280.000 KWH |
231,120.000 KWH |
| LAUDERHILL MIDDLE |
173,640.000 KWH |
181,320.000 KWH |
| LAUDERHILL MIDDLE/COMM |
4,350.000 KWH |
4,907.000 KWH |
| LAUDERHILL PT ELEM |
164,520.000 KWH |
155,880.000 KWH |
| LIBERTY ELEMENTARY |
167,280.000 KWH |
192,720.000 KWH |
| LLOYD ESTATES ELEM |
100,320.000 KWH |
160,320.000 KWH |
| LOCKHART STADIUM |
67,200.000 KWH |
91,053.000 KWH |
| LYONS CREEK MIDDLE |
334,800.000 KWH |
368,640.000 KWH |
| MANATEE BAY ELEMENTARY |
197,521.000 KWH |
208,100.000 KWH |
| MAPLEWOOD ELEM |
141,720.000 KWH |
151,440.000 KWH |
| MARGATE ELEM |
227,520.000 KWH |
187,440.000 KWH |
| MARGATE MIDDLE |
237,144.000 KWH |
235,857.000 KWH |
| MARKHAM ELEM |
124,410.000 KWH |
127,089.000 KWH |
| MARTIN LUTHER KING ELEM |
164,509.000 KWH |
170,606.000 KWH |
| MCARTHUR HIGH |
471,173.000 KWH |
469,198.000 KWH |
| MCFATTER VO TECH |
359,280.000 KWH |
358,080.000 KWH |
| MCNAB ELEMENTARY |
135,417.000 KWH |
163,616.000 KWH |
| MCNICOL MIDDLE |
271,920.000 KWH |
298,560.000 KWH |
| MEADOWBROOK ELEM |
174,421.000 KWH |
186,240.000 KWH |
| MILLENNIUM MIDDLE |
328,320.000 KWH |
346,800.000 KWH |
| MIRAMAR ELEM |
121,200.000 KWH |
144,360.000 KWH |
| MIRAMAR HIGH |
546,650.000 KWH |
456,245.000 KWH |
| MIRROR LAKE ELEM |
104,160.000 KWH |
100,560.000 KWH |
| MONARCH HIGH |
429,600.000 KWH |
431,600.000 KWH |
| MORROW ELEM |
163,800.000 KWH |
132,600.000 KWH |
| MULTICULTURAL CENTER |
14,640.000 KWH |
25,560.000 KWH |
| N ANDREWS GARDENS ELEM |
220,824.000 KWH |
214,704.000 KWH |
| NEW RENAISSANCE MIDDLE |
246,858.000 KWH |
260,079.000 KWH |
| NEW RIVER CIRCLE SITE |
54,984.000 KWH |
72,324.000 KWH |
| NEW RIVER MIDDLE SCHOOL |
243,360.000 KWH |
249,960.000 KWH |
| NOB HILL ELEM |
138,360.000 KWH |
111,600.000 KWH |
| NORCREST ELEM |
260,749.000 KWH |
145,133.000 KWH |
| NORTH AREA MAINT/WHSE |
37,620.000 KWH |
36,000.000 KWH |
| NORTH BUS PARKING LOT |
56,946.000 KWH |
59,915.000 KWH |
| NORTH CENTRAL SUPERINTENDENT |
97,500.000 KWH |
75,900.000 KWH |
| NORTH FORK ELEM |
138,120.000 KWH |
148,200.000 KWH |
| NORTH LAUDERDALE ELEM |
126,480.000 KWH |
115,680.000 KWH |
| NORTH SIDE ELEMENTARY |
132,360.000 KWH |
112,560.000 KWH |
| NORTH WEST TRANSPORTATION |
25,560.000 KWH |
25,620.000 KWH |
| NORTHEAST HIGH |
387,896.000 KWH |
314,523.000 KWH |
| NOVA BLANCHE FORMAN/EISENHOWER ELEM |
304,400.000 KWH |
280,400.000 KWH |
| NOVA CENTER - NOVA MIDDLE |
.000 KWH |
39,720.000 KWH |
| NOVA EISENHOWER ELEMENTARY |
13,656.000 KWH |
8,972.000 KWH |
| NOVA HIGH |
29,146.000 KWH |
40,835.000 KWH |
| NOVA HIGH - MECH PLANT |
899,200.000 KWH |
737,600.000 KWH |
| OAKLAND PARK ELEM |
151,320.000 KWH |
183,240.000 KWH |
| OAKRIDGE ELEM |
131,901.000 KWH |
126,429.000 KWH |
| OFF CAMPUS ALTERNATIVE CENTER |
.000 KWH |
1,935.000 KWH |
| OLSEN MIDDLE |
171,480.000 KWH |
216,720.000 KWH |
| OLSEN MIDDLE ANNEX |
112,760.000 KWH |
153,560.000 KWH |
| ORANGE BROOK ELEM |
131,040.000 KWH |
128,880.000 KWH |
| ORIOLE ELEM |
102,960.000 KWH |
126,240.000 KWH |
| PALM COVE ELEM |
154,320.000 KWH |
154,080.000 KWH |
| PALMVIEW ELEM |
125,520.000 KWH |
140,880.000 KWH |
| PANTHER RUN ELEM |
111,960.000 KWH |
137,640.000 KWH |
| PARK LAKES ELEMENTARY |
203,520.000 KWH |
213,600.000 KWH |
| PARK LAKES ELEMENTARY ANNEX |
19,768.000 KWH |
45,448.000 KWH |
| PARK RIDGE ELEM |
89,400.000 KWH |
116,640.000 KWH |
| PARK SPRINGS ELEM |
158,400.000 KWH |
149,520.000 KWH |
| PARK TRAILS ELEMENTARY |
209,400.000 KWH |
181,080.000 KWH |
| PARKSIDE ELEMENTARY |
165,120.000 KWH |
157,680.000 KWH |
| PARKWAY MIDDLE |
377,165.000 KWH |
357,026.000 KWH |
| PASADENA LAKES ELEM |
184,737.000 KWH |
173,338.000 KWH |
| PEMBROKE LAKES ELEM |
115,440.000 KWH |
117,300.000 KWH |
| PEMBROKE PINES ELEM |
109,583.000 KWH |
122,095.000 KWH |
| PERRY ELEM |
157,546.000 KWH |
157,128.000 KWH |
| PERRY MIDDLE |
186,480.000 KWH |
203,520.000 KWH |
| PETERS ELEM |
210,291.000 KWH |
139,836.000 KWH |
| PHYSICAL PLANT OPERATIONS |
105,540.000 KWH |
112,851.000 KWH |
| PINE RIDGE CTR |
85,440.000 KWH |
90,720.000 KWH |
| PINES LAKES ELEM |
150,720.000 KWH |
182,160.000 KWH |
| PINES MIDDLE |
254,008.000 KWH |
258,088.000 KWH |
| PINEWOOD ELEM |
190,440.000 KWH |
155,640.000 KWH |
| PIONEER MIDDLE |
216,180.000 KWH |
222,179.000 KWH |
| PIONEER MIDDLE ANNEX |
43,320.000 KWH |
33,360.000 KWH |
| PIPER HIGH |
532,069.000 KWH |
511,576.000 KWH |
| PLANTATION ELEM |
142,780.000 KWH |
153,207.000 KWH |
| PLANTATION HIGH |
445,559.000 KWH |
419,303.000 KWH |
| PLANTATION MIDDLE |
239,466.000 KWH |
275,241.000 KWH |
| PLANTATION PARK ELEM |
89,586.000 KWH |
99,960.000 KWH |
| POMPANO BEACH ELEM |
141,480.000 KWH |
139,080.000 KWH |
| POMPANO BEACH HIGH |
309,230.000 KWH |
368,308.000 KWH |
| POMPANO BEACH MIDDLE |
238,008.000 KWH |
293,448.000 KWH |
| PORTABLE AT PINES |
107,764.000 KWH |
93,988.000 KWH |
| PPO ZONE 2 - LEASED |
24,046.000 KWH |
23,067.000 KWH |
| QUIET WATERS ELEM |
169,980.000 KWH |
207,060.000 KWH |
| RAMBLEWOOD ELEM |
167,520.000 KWH |
150,480.000 KWH |
| RAMBLEWOOD MIDDLE |
304,630.000 KWH |
279,369.000 KWH |
| RICKARDS MIDDLE |
198,129.000 KWH |
204,231.000 KWH |
| RIVERGLADES ELEM |
111,840.000 KWH |
106,320.000 KWH |
| RIVERLAND ELEM |
119,640.000 KWH |
123,240.000 KWH |
| RIVERSIDE ELEM |
159,360.000 KWH |
178,080.000 KWH |
| ROCK ISLAND ADMIN |
91,992.000 KWH |
91,872.000 KWH |
| ROYAL PALM ELEMENTARY |
184,137.000 KWH |
207,621.000 KWH |
| SANDERS PARK ELEM |
108,800.000 KWH |
111,200.000 KWH |
| SANDPIPER ELEM |
172,680.000 KWH |
193,680.000 KWH |
| SAWGRASS ELEM |
171,000.000 KWH |
169,560.000 KWH |
| SAWGRASS SPRINGS MIDDLE |
244,320.000 KWH |
228,720.000 KWH |
| SEA CASTLE ELEM |
188,640.000 KWH |
184,560.000 KWH |
| SEAGULL SCHOOL |
107,885.000 KWH |
130,796.000 KWH |
| SEMINOLE MIDDLE |
216,720.000 KWH |
241,920.000 KWH |
| SHERIDAN HILLS ELEM |
105,156.000 KWH |
115,014.000 KWH |
| SHERIDAN PARK ELEM |
135,600.000 KWH |
140,880.000 KWH |
| SHERIDAN VOCATIONAL |
353,760.000 KWH |
344,019.000 KWH |
| SILVER LAKES ELEMENTARY |
122,040.000 KWH |
133,800.000 KWH |
| SILVER LAKES MIDDLE |
186,960.000 KWH |
196,560.000 KWH |
| SILVER PALMS ELEM |
158,520.000 KWH |
225,600.000 KWH |
| SILVER RIDGE ELEM |
235,200.000 KWH |
220,920.000 KWH |
| SILVER SHORES ELEMENTARY |
139,440.000 KWH |
158,040.000 KWH |
| SILVER TRAIL MIDDLE |
278,640.000 KWH |
281,520.000 KWH |
| SOUTH AREA BUS PARKING |
41,812.000 KWH |
46,542.000 KWH |
| SOUTH AREA MAINTENANCE |
19,016.000 KWH |
23,060.000 KWH |
| SOUTH BROWARD HIGH |
433,201.000 KWH |
471,337.000 KWH |
| SOUTH PLANTATION HIGH |
561,626.000 KWH |
505,992.000 KWH |
| Southwest Area Bus Complex |
35,898.000 KWH |
29,435.000 KWH |
| STEPHEN FOSTER ELEM |
160,799.000 KWH |
152,887.000 KWH |
| STIRLING ELEM |
110,160.000 KWH |
134,280.000 KWH |
| STONEMAN DOUGLAS HIGH |
495,935.000 KWH |
592,000.000 KWH |
| STRANAHAN HIGH |
501,010.000 KWH |
470,163.000 KWH |
| SUNLAND PARK ELEM |
109,920.000 KWH |
110,160.000 KWH |
| SUNRISE MIDDLE |
252,635.000 KWH |
238,745.000 KWH |
| SUNSET LAKES ELEMENTARY |
144,000.000 KWH |
180,960.000 KWH |
| SUNSET SCHOOL |
105,912.000 KWH |
123,792.000 KWH |
| SUNSHINE ELEMENTARY |
110,318.000 KWH |
131,171.000 KWH |
| TAMARAC ELEM |
197,010.000 KWH |
224,580.000 KWH |
| TARAVELLA HIGH |
498,787.000 KWH |
517,095.000 KWH |
| TECHNOLOGY AND SUPPORT SERVICE |
360,240.000 KWH |
364,800.000 KWH |
| TEDDER ELEMENTARY SCHOOL |
147,843.000 KWH |
172,384.000 KWH |
| TEQUESTA TRACE MIDDLE |
228,840.000 KWH |
267,120.000 KWH |
| THE QUEST CENTER |
114,600.000 KWH |
98,400.000 KWH |
| THURGOOD MARSHALL ELEM |
135,144.000 KWH |
146,664.000 KWH |
| TRADEWINDS ELEM |
183,360.000 KWH |
215,760.000 KWH |
| Transportation Services Annex |
12,360.000 KWH |
6,600.000 KWH |
| TROPICAL ELEM |
125,694.000 KWH |
148,981.000 KWH |
| TWIN LAKES ADMIN |
63,360.000 KWH |
67,680.000 KWH |
| TWIN LAKES ANNEX/NEW WHSE |
2,738.000 KWH |
2,370.000 KWH |
| TWIN LAKES COMPLEX |
111,266.000 KWH |
115,617.000 KWH |
| VEHICLE MAINTENANCE |
91,680.000 KWH |
92,640.000 KWH |
| VILLAGE ELEM |
197,280.000 KWH |
171,360.000 KWH |
| VIRGINIA YOUNG ELEM |
96,360.000 KWH |
121,200.000 KWH |
| WALKER ELEM |
221,102.000 KWH |
292,818.000 KWH |
| WALTER C YOUNG MIDDLE |
452,540.000 KWH |
466,612.000 KWH |
| WATKINS ELEM |
154,080.000 KWH |
134,640.000 KWH |
| WELLEBY ELEM |
129,600.000 KWH |
127,560.000 KWH |
| WEST BROWARD HIG/LLL |
436,800.000 KWH |
452,800.000 KWH |
| WEST CENTRAL BUS COMPLEX |
68,894.000 KWH |
65,613.000 KWH |
| WEST HOLLYWOOD ELEM |
122,400.000 KWH |
130,680.000 KWH |
| WESTCHESTER ELEMENTARY |
169,419.000 KWH |
159,383.000 KWH |
| WESTERN HIGH |
499,553.000 KWH |
684,775.000 KWH |
| WESTGLADES MIDDLE |
311,040.000 KWH |
316,560.000 KWH |
| WESTPINE MIDDLE |
164,400.000 KWH |
191,880.000 KWH |
| WESTWOOD HEIGHTS ELEM |
158,443.000 KWH |
157,419.000 KWH |
| WHIDDON-ROGERS ED CENTER |
180,800.000 KWH |
174,400.000 KWH |
| WHISPERING PINES |
85,440.000 KWH |
96,720.000 KWH |
| WILLIAM DANDY MIDDLE |
237,840.000 KWH |
206,640.000 KWH |
| WILTON MANORS ELEM |
138,420.000 KWH |
134,520.000 KWH |
| WINGATE OAKS CTR |
103,560.000 KWH |
122,280.000 KWH |
| WINSTON PARK ELEM |
193,200.000 KWH |
198,720.000 KWH |
|