Utility Savings
Building Name
Sept-07
Sept-08
APOLLO MIDDLE 310,800.000 KWH 288,480.000 KWH
ARTHUR ASHE MIDDLE 369,600.000 KWH 346,000.000 KWH
ATLANTIC VOC CENTER 647,105.000 KWH 636,716.000 KWH
ATLANTIC WEST ELEM 205,560.000 KWH 168,960.000 KWH
ATTUCKS MIDDLE 341,222.000 KWH 295,200.000 KWH
BAIR MIDDLE 237,600.000 KWH 214,080.000 KWH
BANYAN ELEM 170,400.000 KWH 160,560.000 KWH
BAYVIEW ELEM 98,760.000 KWH 113,640.000 KWH
BECON 227,720.000 KWH 246,080.000 KWH
BENNETT ELEM 120,480.000 KWH 125,280.000 KWH
BETHUNE ELEM 249,960.000 KWH 226,440.000 KWH
BOULEVARD HEIGHTS ELEM 130,680.000 KWH 171,720.000 KWH
BOYD ANDERSON HIGH 492,639.000 KWH 519,419.000 KWH
BRIGHT HORIZONS CTR 158,880.000 KWH 164,880.000 KWH
BROADVIEW ELEM 160,950.000 KWH 161,646.000 KWH
BROWARD EDUCATION FOUNDATION 6,062.000 KWH .000 KWH
BROWARD ESTATES ELEM 212,089.000 KWH 148,333.000 KWH
BROWARD FIRE ACADEMY 38,520.000 KWH 33,259.000 KWH
CASTLE HILL ELEM 157,440.000 KWH 158,640.000 KWH
CENTRAL PARK ELEM 31,800.000 KWH .000 KWH
  204,600.000 KWH 185,400.000 KWH
CHALLENGER ELEMENTARY 197,400.000 KWH 198,240.000 KWH
CHAPEL TRAIL ELEM 252,070.000 KWH 255,017.000 KWH
CHARLES DREW ELEM 113,160.000 KWH 142,440.000 KWH
COCONUT CREEK ELEM 140,842.000 KWH 126,733.000 KWH
COCONUT CREEK HIGH 539,009.000 KWH 428,110.000 KWH
COCONUT PALM ELEMENTARY 239,280.000 KWH 196,560.000 KWH
COLBERT ELEM 138,960.000 KWH 128,640.000 KWH
COLLINS ELEM 89,520.000 KWH 87,120.000 KWH
COMMUNITY SCHOOL SOUTH .000 KWH 4,851.000 KWH
COOPER CITY COMM 11,008.000 KWH 9,232.000 KWH
COOPER CITY ELEM 181,920.000 KWH 148,320.000 KWH
COOPER CITY HIGH 714,061.000 KWH 675,386.000 KWH
CORAL COVE ELEMENTARY 150,240.000 KWH 151,200.000 KWH
CORAL GLADES HIGH 509,520.000 KWH 535,920.000 KWH
CORAL PARK ELEM 163,920.000 KWH 200,640.000 KWH
CORAL SPRINGS ELEM 148,080.000 KWH 154,800.000 KWH
CORAL SPRINGS COMMUNITY 517,652.000 KWH 560,293.000 KWH
CORAL SPRINGS HIGH 302,040.000 KWH 267,240.000 KWH
CORAL SPRINGS MIDDLE 195,960.000 KWH 177,360.000 KWH
COUNTRY HILLS ELEM 216,240.000 KWH 218,520.000 KWH
COUNTRY ISLES ELEM 132,840.000 KWH 144,240.000 KWH
CRESTHAVEN ELEM 151,469.000 KWH 162,263.000 KWH
CROISSANT PARK ELEM 117,540.000 KWH 131,820.000 KWH
CROSS CREEK 11,204.000 KWH 10,978.000 KWH
CRYSTAL LAKE COMM SCHOOL 269,179.000 KWH 271,051.000 KWH
CRYSTAL LAKE MIDDLE 597,600.000 KWH 638,000.000 KWH
CYPRESS BAY HIGH 283,104.000 KWH 93,120.000 KWH
CYPRESS BAY HIGH ANNEX 128,880.000 KWH 171,600.000 KWH
CYPRESS ELEM 70,943.000 KWH 102,410.000 KWH
CYPRESS RUN ALTERNATIVE 141,456.000 KWH 171,439.000 KWH
DANIA ELEM 146,880.000 KWH 116,880.000 KWH
DAVE THOMAS ED CENTER (WEST) 48,549.000 KWH 44,258.000 KWH
DAVE THOMAS EDUCATION CENTER 159,886.000 KWH 147,010.000 KWH
DAVIE ELEM 187,891.000 KWH 216,000.000 KWH
DEERFIELD BEACH ELEM 465,418.000 KWH 484,274.000 KWH
DEERFIELD BEACH HIGH 327,584.000 KWH 336,428.000 KWH
DEERFIELD BEACH MID 146,160.000 KWH 143,520.000 KWH
DEERFIELD PARK ELEM 182,160.000 KWH 177,600.000 KWH
DILLARD ELEM 7,299.000 KWH .000 KWH
DILLARD HIGH COMM 813,585.000 KWH 829,799.000 KWH
DILLARD HIGH SCHOOL 138,240.000 KWH 141,600.000 KWH
DOLPHIN BAY ELEMENTARY 127,987.000 KWH 95,032.000 KWH
DREW RESOURCE CTR 130,435.000 KWH 116,384.000 KWH
DRIFTWOOD ELEM 486,262.000 KWH 463,013.000 KWH
DRIFTWOOD MIDDLE 273,480.000 KWH 253,680.000 KWH
EAGLE POINT ELEM 186,000.000 KWH 204,600.000 KWH
EAGLE RIDGE ELEM 30,731.000 KWH 30,233.000 KWH
ECIA SPECIAL PROGRAMS 96,856.000 KWH 62,536.000 KWH
EDGEWOOD CENTER 798,392.000 KWH 771,244.000 KWH
ELY HIGH 116,040.000 KWH 134,040.000 KWH
EMBASSY CREEK ELEM 121,800.000 KWH 118,680.000 KWH
ENDEAVOR LEARNING CENTER 182,322.000 KWH 121,286.000 KWH
EVERGLADES 9TH GRADE ANNEX 303,145.000 KWH 274,342.000 KWH
EVERGLADES ELEMENTARY 681,720.000 KWH 669,480.000 KWH
EVERGLADES HIGH 239,160.000 KWH 234,120.000 KWH
FAIRWAY ELEM 502,357.000 KWH 417,884.000 KWH
FALCON COVE MIDDLE 161,248.000 KWH 159,688.000 KWH
FLAMINGO ELEM 690,007.000 KWH 590,765.000 KWH
FLANAGAN HIGH 158,496.000 KWH 163,536.000 KWH
FLORANADA ELEM 342,594.000 KWH 262,017.000 KWH
FOREST GLEN MIDDLE 156,720.000 KWH 158,880.000 KWH
FOREST HILLS ELEM 628,972.000 KWH 647,513.000 KWH
FORT LAUDERDALE HIGH 204,840.000 KWH 200,640.000 KWH
FORT LAUDERDALE HIGH ANNEX 320,160.000 KWH 378,960.000 KWH
FOX TRAIL ELEMENTARY 348,800.000 KWH 384,800.000 KWH
GATOR RUN ELEMENTARY 128,520.000 KWH 149,400.000 KWH
GLADES MIDDLE 108,720.000 KWH 96,240.000 KWH
GRIFFIN ELEM 232,105.000 KWH 201,369.000 KWH
GULFSTREAM MIDDLE SCHOOL 198,480.000 KWH 156,720.000 KWH
HALLANDALE ADULT CENTER 313,738.000 KWH 339,931.000 KWH
HALLANDALE ELEM 120,456.000 KWH 86,328.000 KWH
HALLANDALE HIGH 191,529.000 KWH 221,773.000 KWH
HARBORDALE ELEM 37,980.000 KWH 46,320.000 KWH
HAWKES BLUFF ELEM 123,600.000 KWH 117,240.000 KWH
HOLLYWOOD CENTRAL AUDITORIUM 4,035.000 KWH 4,188.000 KWH
HOLLYWOOD CENTRAL ELEM 106,680.000 KWH 173,280.000 KWH
HOLLYWOOD HILLS COMMUNITY 465,477.000 KWH 436,127.000 KWH
HOLLYWOOD HILLS ELEMENTARY 123,600.000 KWH 134,160.000 KWH
HOLLYWOOD HILLS HIGH 131,880.000 KWH 137,880.000 KWH
HOLLYWOOD PARK ELEM 88,688.000 KWH 85,861.000 KWH
HORIZON ELEM 358,867.000 KWH 358,656.000 KWH
HORTT ADMIN SITE 150,360.000 KWH 144,840.000 KWH
INDIAN RIDGE MIDDLE 172,800.000 KWH 166,920.000 KWH
INDIAN TRACE ELEM 446,435.000 KWH 424,906.000 KWH
JAMES HUNT ELEMENTARY 226,368.000 KWH 224,280.000 KWH
KATHLEEN WRIGHT ADMIN 171,840.000 KWH 157,200.000 KWH
LAKE FOREST ELEM 73,920.000 KWH 69,600.000 KWH
LAKESIDE ELEMENTARY 150,183.000 KWH 159,973.000 KWH
LANIER JAMES CENTER 219,600.000 KWH 207,240.000 KWH
LARKDALE ELEM 299,400.000 KWH 266,760.000 KWH
LAUDERDALE LAKES MIDDLE 218,160.000 KWH 187,080.000 KWH
LAUDERDALE MANORS ELEM 5,089.000 KWH 5,591.000 KWH
LAUDERHILL MIDDLE 154,320.000 KWH 170,520.000 KWH
LAUDERHILL MIDDLE/COMM 193,920.000 KWH 212,640.000 KWH
LAUDERHILL PT ELEM 119,040.000 KWH 117,840.000 KWH
LIBERTY ELEMENTARY 88,652.000 KWH 89,044.000 KWH
LLOYD ESTATES ELEM 410,160.000 KWH 363,840.000 KWH
LOCKHART STADIUM 203,509.000 KWH 221,687.000 KWH
LYONS CREEK MIDDLE 162,600.000 KWH 163,320.000 KWH
MANATEE BAY ELEMENTARY 243,780.000 KWH 231,960.000 KWH
MAPLEWOOD ELEM 360,243.000 KWH 185,818.000 KWH
MARGATE ELEM 145,275.000 KWH 144,143.000 KWH
MARGATE MIDDLE 171,569.000 KWH 205,981.000 KWH
MARKHAM ELEM 614,400.000 KWH 495,714.000 KWH
MARTIN LUTHER KING ELEM 393,120.000 KWH 373,200.000 KWH
MCARTHUR HIGH 186,120.000 KWH 169,265.000 KWH
MCFATTER VO TECH 315,600.000 KWH 296,160.000 KWH
MCNAB ELEMENTARY 134,732.000 KWH 203,888.000 KWH
MCNICOL MIDDLE 346,800.000 KWH 337,920.000 KWH
MEADOWBROOK ELEM 161,040.000 KWH 149,040.000 KWH
MILLENNIUM MIDDLE 564,797.000 KWH 508,777.000 KWH
MIRAMAR ELEM 116,400.000 KWH 110,400.000 KWH
MIRAMAR HIGH 436,800.000 KWH 527,200.000 KWH
MIRROR LAKE ELEM 190,440.000 KWH 147,600.000 KWH
MONARCH HIGH 23,640.000 KWH 18,240.000 KWH
MORROW ELEM 239,184.000 KWH 287,064.000 KWH
MULTICULTURAL CENTER 374,543.000 KWH 322,685.000 KWH
N ANDREWS GARDENS ELEM 192,624.000 KWH 96,384.000 KWH
NEW RENAISSANCE MIDDLE 379,680.000 KWH 229,080.000 KWH
NEW RIVER MIDDLE SCHOOL 144,000.000 KWH 158,400.000 KWH
NOB HILL ELEM 197,305.000 KWH 299,528.000 KWH
NORCREST ELEM 39,420.000 KWH 43,980.000 KWH
NORTH AREA MAINT/WHSE 8,528.000 KWH .000 KWH
NORTH AREA SUPERINTENDENT 92,370.000 KWH 96,798.000 KWH
NORTH BUS PARKING LOT 120,480.000 KWH 111,180.000 KWH
NORTH CENTRAL SUPERINTENDENT 217,560.000 KWH 58,320.000 KWH
NORTH FORK ELEM 122,880.000 KWH 155,280.000 KWH
NORTH LAUDERDALE ELEM 170,880.000 KWH 147,720.000 KWH
NORTH SIDE ELEMENTARY 415,152.000 KWH 445,744.000 KWH
NORTH WEST TRANSPORTATION 384,400.000 KWH 309,200.000 KWH
NORTHEAST HIGH 15,862.000 KWH 13,836.000 KWH
NOVA BLANCHE FORMAN/EISENHOWER ELEM 7,388.000 KWH 14,074.000 KWH
NOVA EISENHOWER ELEMENTARY 828,800.000 KWH 726,400.000 KWH
NOVA HIGH 30.000 KWH .000 KWH
NOVA HIGH - MECH PLANT 166,080.000 KWH 164,400.000 KWH
NOVA HIGH COMM/GED 148,415.000 KWH 156,562.000 KWH
OAKLAND PARK ELEM 214,680.000 KWH 195,120.000 KWH
OAKRIDGE ELEM 155,000.000 KWH 153,560.000 KWH
OLSEN MIDDLE 281,040.000 KWH 136,800.000 KWH
OLSEN MIDDLE ANNEX 134,640.000 KWH 139,680.000 KWH
ORANGEBROOK ELEM 193,440.000 KWH 177,360.000 KWH
ORIOLE ELEM 199,080.000 KWH 160,080.000 KWH
PALM COVE ELEM 156,720.000 KWH 128,040.000 KWH
PALMVIEW ELEM 248,160.000 KWH 227,520.000 KWH
PANTHER RUN ELEM 38,664.000 KWH 18,328.000 KWH
PARK LAKES ELEMENTARY 124,560.000 KWH 131,040.000 KWH
PARK LAKES ELEMENTARY ANNEX 231,360.000 KWH 191,280.000 KWH
PARK RIDGE ELEM 277,560.000 KWH 256,080.000 KWH
PARK SPRINGS ELEM 189,840.000 KWH 195,360.000 KWH
PARK TRAILS ELEMENTARY 418,565.000 KWH 376,323.000 KWH
PARKSIDE ELEMENTARY 254,551.000 KWH 211,682.000 KWH
PARKWAY MIDDLE 159,660.000 KWH 141,120.000 KWH
PASADENA LAKES ELEM 123,222.000 KWH 127,322.000 KWH
PEMBROKE LAKES ELEM 175,622.000 KWH 167,473.000 KWH
PEMBROKE PINES ELEM 271,200.000 KWH 216,720.000 KWH
PERRY ELEM 194,384.000 KWH 170,954.000 KWH
PERRY MIDDLE 118,080.000 KWH 124,080.000 KWH
PETERS ELEM 103,440.000 KWH 100,320.000 KWH
PHYSICAL PLANT OPERATIONS 215,760.000 KWH 161,400.000 KWH
PINE RIDGE CTR 660,804.000 KWH 265,048.000 KWH
PINES LAKES ELEM 171,000.000 KWH 218,760.000 KWH
PINES MIDDLE 273,686.000 KWH 234,217.000 KWH
PINEWOOD ELEM 49,320.000 KWH 50,820.000 KWH
PIONEER MIDDLE 585,047.000 KWH 609,301.000 KWH
PIONEER MIDDLE ANNEX 203,017.000 KWH 161,109.000 KWH
PIPER HIGH 484,959.000 KWH 487,557.000 KWH
PLANTATION ELEM 262,130.000 KWH 251,884.000 KWH
PLANTATION HIGH 140,427.000 KWH 114,957.000 KWH
PLANTATION MIDDLE 135,000.000 KWH 150,000.000 KWH
PLANTATION PARK ELEM 346,217.000 KWH 355,823.000 KWH
POMPANO BEACH ELEM 280,656.000 KWH 288,408.000 KWH
POMPANO BEACH HIGH 27,441.000 KWH 27,225.000 KWH
POMPANO BEACH MIDDLE 199,320.000 KWH 182,700.000 KWH
PPO ZONE 2 - LEASED 166,800.000 KWH 204,240.000 KWH
QUIET WATERS ELEM 342,960.000 KWH 333,894.000 KWH
RAMBLEWOOD ELEM 305,330.000 KWH 239,444.000 KWH
RAMBLEWOOD MIDDLE 138,960.000 KWH 132,240.000 KWH
RICKARDS MIDDLE 135,720.000 KWH 130,680.000 KWH
RIVERGLADES ELEM 279,840.000 KWH 208,800.000 KWH
RIVERLAND ELEM 106,392.000 KWH 100,992.000 KWH
RIVERSIDE ELEM 200,332.000 KWH 207,767.000 KWH
ROCK ISLAND ADMIN 121,200.000 KWH 125,200.000 KWH
ROYAL PALM ELEMENTARY 251,400.000 KWH 214,560.000 KWH
SAFETY DEPARTMENT 184,680.000 KWH 180,480.000 KWH
SANDERS PARK ELEM 263,400.000 KWH 286,560.000 KWH
SANDPIPER ELEM 180,720.000 KWH 205,680.000 KWH
SAWGRASS ELEM 165,990.000 KWH 176,354.000 KWH
SAWGRASS SPRINGS MIDDLE 257,520.000 KWH 261,960.000 KWH
SEA CASTLE ELEM 125,998.000 KWH 124,594.000 KWH
SEAGULL SCHOOL 207,840.000 KWH 114,240.000 KWH
SEMINOLE MIDDLE 466,560.000 KWH 379,680.000 KWH
SHERIDAN HILLS ELEM 183,960.000 KWH 149,880.000 KWH
SHERIDAN PARK ELEM 268,200.000 KWH 217,920.000 KWH
SHERIDAN VOCATIONAL 208,800.000 KWH 185,280.000 KWH
SILVER LAKES ELEMENTARY 252,840.000 KWH 254,040.000 KWH
SILVER LAKES MIDDLE 213,480.000 KWH 182,400.000 KWH
SILVER PALMS ELEM 301,920.000 KWH 303,360.000 KWH
SILVER RIDGE ELEM 47,315.000 KWH 50,267.000 KWH
SILVER SHORES ELEMENTARY 25,216.000 KWH 21,251.000 KWH
SILVER TRAIL MIDDLE 507,961.000 KWH 484,882.000 KWH
SOUTH AREA BUS PARKING 624,782.000 KWH 505,874.000 KWH
SOUTH AREA MAINTENANCE 2,097.000 KWH 34,071.000 KWH
SOUTH BROWARD HIGH 166,563.000 KWH 171,140.000 KWH
SOUTH PLANTATION HIGH 131,160.000 KWH 132,840.000 KWH
SOUTH WEST BUS LOT 563,600.000 KWH 544,800.000 KWH
STEPHEN FOSTER ELEM 603,030.000 KWH 497,055.000 KWH
STIRLING ELEM 134,640.000 KWH 124,320.000 KWH
STONEMAN DOUGLAS HIGH 269,061.000 KWH 282,105.000 KWH
STRANAHAN HIGH 157,200.000 KWH 164,400.000 KWH
SUNLAND PARK ELEM 154,752.000 KWH 128,352.000 KWH
SUNRISE MIDDLE 156,632.000 KWH 125,015.000 KWH
SUNSET LAKES ELEMENTARY 284,250.000 KWH 200,640.000 KWH
SUNSET SCHOOL 529,652.000 KWH 644,941.000 KWH
SUNSHINE ELEMENTARY 392,400.000 KWH 387,360.000 KWH
TAMARAC ELEM 184,467.000 KWH 182,682.000 KWH
TARAVELLA HIGH 301,560.000 KWH 258,120.000 KWH
TECHNOLOGY AND SUPPORT SERVICE 132,960.000 KWH 107,520.000 KWH
TEDDER ELEMENTARY SCHOOL 143,304.000 KWH 146,424.000 KWH
TEQUESTA TRACE MIDDLE 289,440.000 KWH 186,240.000 KWH
THE QUEST CENTER .000 KWH 14,280.000 KWH
THURGOOD MARSHALL ELEM 121,147.000 KWH 169,407.000 KWH
TRADEWINDS ELEM 69,600.000 KWH 72,720.000 KWH
TROPICAL ELEM 3,542.000 KWH 3,387.000 KWH
TWIN LAKES ANNEX/NEW WHSE 120,557.000 KWH 131,608.000 KWH
TWIN LAKES COMPLEX 97,200.000 KWH 106,080.000 KWH
VEHICLE MAINTENANCE 225,960.000 KWH 222,540.000 KWH
VILLAGE ELEM 146,160.000 KWH 114,120.000 KWH
VIRGINIA YOUNG ELEM 322,654.000 KWH 245,264.000 KWH
WALKER ELEM 533,617.000 KWH 513,082.000 KWH
WALTER C YOUNG MIDDLE 161,280.000 KWH 180,480.000 KWH
WATKINS ELEM 140,520.000 KWH 154,560.000 KWH
WELLEBY ELEM .000 KWH 518,400.000 KWH
WEST CENTRAL BUS COMPLEX 69,405.000 KWH 70,872.000 KWH
WEST HOLLYWOOD ELEM 137,640.000 KWH 130,440.000 KWH
WESTCHESTER ELEMENTARY 184,361.000 KWH 185,528.000 KWH
WESTERN HIGH 526,257.000 KWH 563,631.000 KWH
WESTGLADES MIDDLE 383,280.000 KWH 326,400.000 KWH
WESTPINE MIDDLE 195,480.000 KWH 200,880.000 KWH
WESTWOOD HEIGHTS ELEM 203,853.000 KWH 210,532.000 KWH
WHIDDON-ROGERS ED CENTER 188,400.000 KWH 203,200.000 KWH
WHISPERING PINES 94,800.000 KWH 90,840.000 KWH
WILLIAM DANDY MIDDLE 245,040.000 KWH 237,360.000 KWH
WILTON MANORS ELEM 167,760.000 KWH 163,500.000 KWH
WINGATE OAKS CTR 132,240.000 KWH 127,320.000 KWH
WINSTON PARK ELEM 221,520.000 KWH 200,880.000 KWH