Utility Savings
Building Name
Feb-08
Feb-09
APOLLO MIDDLE 221,040.000 KWH 190,560.000 KWH
ARTHUR ASHE MIDDLE 325,200.000 KWH 287,200.000 KWH
ATLANTIC VOC CENTER 497,825.000 KWH 422,404.000 KWH
ATLANTIC WEST ELEM 132,600.000 KWH 124,080.000 KWH
ATTUCKS MIDDLE 243,429.000 KWH 214,560.000 KWH
BAIR MIDDLE 195,840.000 KWH 164,400.000 KWH
BANYAN ELEM 135,960.000 KWH 120,120.000 KWH
BAYVIEW ELEM 84,240.000 KWH 72,000.000 KWH
BECON 249,240.000 KWH 243,280.000 KWH
BENNETT ELEM 86,640.000 KWH 89,760.000 KWH
BETHUNE ELEM 178,800.000 KWH 160,560.000 KWH
BOULEVARD HEIGHTS ELEM 93,720.000 KWH 102,960.000 KWH
BOYD ANDERSON HIGH 408,338.000 KWH 361,383.000 KWH
BRIGHT HORIZONS CTR 102,000.000 KWH 89,040.000 KWH
BROADVIEW ELEM 128,425.000 KWH 104,777.000 KWH
BROWARD EDUCATION FOUNDATION 1,094.000 KWH .000 KWH
BROWARD ESTATES ELEM 113,966.000 KWH 117,902.000 KWH
BROWARD FIRE ACADEMY 27,060.000 KWH 29,062.000 KWH
CASTLE HILL ELEM 134,520.000 KWH 120,480.000 KWH
CENTRAL PARK ELEM 142,320.000 KWH 117,360.000 KWH
CHALLENGER ELEMENTARY 88,080.000 KWH 103,680.000 KWH
CHAPEL TRAIL ELEM 197,550.000 KWH 152,304.000 KWH
CHARLES DREW ELEM 111,360.000 KWH 105,480.000 KWH
COCONUT CREEK ELEM 109,693.000 KWH 90,716.000 KWH
COCONUT CREEK HIGH 368,497.000 KWH 306,791.000 KWH
COCONUT PALM ELEMENTARY 156,600.000 KWH 120,120.000 KWH
COLBERT ELEM 145,920.000 KWH 80,640.000 KWH
COLLINS ELEM 73,440.000 KWH 56,880.000 KWH
COOPER CITY COMM 22,560.000 KWH 16,800.000 KWH
COMMUNITY SCHOOL NORTH .000 KWH 9,237.000 KWH
COMMUNITY SCHOOL SOUTH 5,309.000 KWH 4,968.000 KWH
COOPER CITY ELEM 116,640.000 KWH 96,720.000 KWH
COOPER CITY HIGH 571,163.000 KWH 420,761.000 KWH
CORAL COVE ELEMENTARY 118,560.000 KWH 104,880.000 KWH
CORAL GLADES HIGH 441,120.000 KWH 386,160.000 KWH
CORAL PARK ELEM 112,200.000 KWH 112,440.000 KWH
CORAL SPRINGS ELEM 118,080.000 KWH 101,280.000 KWH
CORAL SPRINGS HIGH 417,566.000 KWH 363,743.000 KWH
CORAL SPRINGS MIDDLE 216,440.000 KWH 182,840.000 KWH
COUNTRY HILLS ELEM 155,640.000 KWH 140,040.000 KWH
COUNTRY ISLES ELEM 172,115.000 KWH 153,120.000 KWH
CRESTHAVEN ELEM 108,600.000 KWH 93,840.000 KWH
CROISSANT PARK ELEM 125,616.000 KWH 104,375.000 KWH
CROSS CREEK 75,120.000 KWH 65,460.000 KWH
CRYSTAL LAKE COMM SCHOOL 7,298.000 KWH 5,758.000 KWH
CRYSTAL LAKE MIDDLE 218,004.000 KWH 186,722.000 KWH
CYPRESS BAY HIGH 480,000.000 KWH 488,000.000 KWH
CYPRESS BAY HIGH ANNEX 41,760.000 KWH 55,440.000 KWH
CYPRESS ELEM 108,480.000 KWH 88,080.000 KWH
CYPRESS RUN ALTERNATIVE 47,646.000 KWH 69,662.000 KWH
DANIA ELEM 99,975.000 KWH 122,581.000 KWH
DAVE THOMAS ED CENTER (WEST) 103,680.000 KWH 98,640.000 KWH
DAVE THOMAS EDUCATION CENTER 41,022.000 KWH 34,222.000 KWH
DAVIE ELEM 122,508.000 KWH 116,875.000 KWH
DEERFIELD BEACH ELEM 175,080.000 KWH 144,738.000 KWH
DEERFIELD BEACH HIGH 374,409.000 KWH 342,470.000 KWH
DEERFIELD BEACH MID 247,468.000 KWH 197,798.000 KWH
DEERFIELD PARK ELEM 121,080.000 KWH 105,960.000 KWH
DILLARD ELEM 141,480.000 KWH 119,520.000 KWH
DILLARD HIGH COMM 3,825.000 KWH .000 KWH
DILLARD HIGH SCHOOL 681,440.000 KWH 638,286.000 KWH
DOLPHIN BAY ELEMENTARY 115,440.000 KWH 95,520.000 KWH
DREW RESOURCE CTR 77,963.000 KWH 49,173.000 KWH
DRIFTWOOD ELEM 98,997.000 KWH 74,953.000 KWH
DRIFTWOOD MIDDLE 348,483.000 KWH 291,215.000 KWH
EAGLE POINT ELEM 221,880.000 KWH 193,680.000 KWH
EAGLE RIDGE ELEM 151,560.000 KWH 130,920.000 KWH
ECIA SPECIAL PROGRAMS 19,075.000 KWH 20,708.000 KWH
EDGEWOOD CENTER 39,256.000 KWH 36,616.000 KWH
ELY HIGH 681,205.000 KWH 635,586.000 KWH
EMBASSY CREEK ELEM 95,520.000 KWH 103,800.000 KWH
ENDEAVOR LEARNING CENTER 87,000.000 KWH 78,600.000 KWH
EVERGLADES ELEMENTARY 182,239.000 KWH 152,179.000 KWH
EVERGLADES HIGH 619,560.000 KWH 472,560.000 KWH
FAIRWAY ELEM 213,960.000 KWH 209,640.000 KWH
FALCON COVE MIDDLE 375,570.000 KWH 289,466.000 KWH
FLAMINGO ELEM 126,328.000 KWH 105,208.000 KWH
FLANAGAN HIGH 486,957.000 KWH 426,542.000 KWH
FLORANADA ELEM 142,056.000 KWH 111,336.000 KWH
FOREST GLEN MIDDLE 213,909.000 KWH 148,768.000 KWH
FOREST HILLS ELEM 112,080.000 KWH 106,080.000 KWH
FORT LAUDERDALE HIGH 547,578.000 KWH 467,695.000 KWH
FOX TRAIL ELEMENTARY 145,080.000 KWH 133,320.000 KWH
GATOR RUN ELEMENTARY 205,560.000 KWH 157,800.000 KWH
GLADES MIDDLE 289,600.000 KWH 244,800.000 KWH
GRIFFIN ELEM 109,680.000 KWH 111,240.000 KWH
GULFSTREAM MIDDLE SCHOOL 81,240.000 KWH 72,360.000 KWH
HALLANDALE ADULT CENTER 165,762.000 KWH 136,973.000 KWH
HALLANDALE ELEM 180,960.000 KWH 121,200.000 KWH
HALLANDALE HIGH 275,009.000 KWH 260,968.000 KWH
HARBORDALE ELEM 81,816.000 KWH 60,528.000 KWH
HAWKES BLUFF ELEM 147,130.000 KWH 132,722.000 KWH
HOLLYWOOD CENTRAL AUDITORIUM 36,660.000 KWH 29,520.000 KWH
HOLLYWOOD CENTRAL ELEM 103,320.000 KWH 85,200.000 KWH
HOLLYWOOD HILLS COMMUNITY 2,685.000 KWH 2,229.000 KWH
HOLLYWOOD HILLS ELEMENTARY 4,800.000 KWH 124,080.000 KWH
HOLLYWOOD HILLS HIGH 376,273.000 KWH 318,152.000 KWH
HOLLYWOOD PARK ELEM 90,960.000 KWH 69,600.000 KWH
HORIZON ELEM 104,520.000 KWH 89,640.000 KWH
HORTT ADMIN SITE 54,376.000 KWH 43,750.000 KWH
INDIAN RIDGE MIDDLE 289,469.000 KWH 251,304.000 KWH
INDIAN TRACE ELEM 120,120.000 KWH 111,720.000 KWH
JAMES HUNT ELEMENTARY 130,680.000 KWH 98,520.000 KWH
KATHLEEN WRIGHT ADMIN 408,529.000 KWH 337,731.000 KWH
LAKE FOREST ELEM 191,448.000 KWH 138,840.000 KWH
LAKESIDE ELEMENTARY 133,680.000 KWH 99,360.000 KWH
LANIER JAMES CENTER 58,320.000 KWH 48,960.000 KWH
LARKDALE ELEM 113,072.000 KWH 110,194.000 KWH
LAUDERDALE LAKES MIDDLE 159,120.000 KWH 157,320.000 KWH
LAUDERDALE MANORS ELEM 177,600.000 KWH 101,760.000 KWH
LAUDERHILL MIDDLE 150,960.000 KWH 124,800.000 KWH
LAUDERHILL MIDDLE/COMM 3,491.000 KWH 3,306.000 KWH
LAUDERHILL PT ELEM 142,680.000 KWH 138,480.000 KWH
LIBERTY ELEMENTARY 145,920.000 KWH 135,120.000 KWH
LLOYD ESTATES ELEM 92,400.000 KWH 92,520.000 KWH
LOCKHART STADIUM 56,700.000 KWH 30,733.000 KWH
LYONS CREEK MIDDLE 298,560.000 KWH 306,000.000 KWH
MANATEE BAY ELEMENTARY 150,346.000 KWH 139,018.000 KWH
MAPLEWOOD ELEM 148,920.000 KWH 118,680.000 KWH
MARGATE ELEM 145,020.000 KWH 141,000.000 KWH
MARGATE MIDDLE 202,540.000 KWH 186,392.000 KWH
MARKHAM ELEM 120,985.000 KWH 117,903.000 KWH
MARTIN LUTHER KING ELEM 130,712.000 KWH 112,961.000 KWH
MCARTHUR HIGH 419,993.000 KWH 410,823.000 KWH
MCFATTER VO TECH 338,400.000 KWH 290,400.000 KWH
MCNAB ELEMENTARY 154,560.000 KWH 118,608.000 KWH
MCNICOL MIDDLE 174,240.000 KWH 216,720.000 KWH
MEADOWBROOK ELEM 97,855.000 KWH 79,023.000 KWH
MILLENNIUM MIDDLE 290,400.000 KWH 284,880.000 KWH
MIRAMAR ELEM 136,800.000 KWH 103,920.000 KWH
MIRAMAR HIGH 429,609.000 KWH 374,979.000 KWH
MIRROR LAKE ELEM 80,640.000 KWH 80,880.000 KWH
MONARCH HIGH 339,600.000 KWH 301,600.000 KWH
MORROW ELEM 125,160.000 KWH 104,760.000 KWH
MULTICULTURAL CENTER 14,400.000 KWH 6,960.000 KWH
N ANDREWS GARDENS ELEM 156,264.000 KWH 146,787.000 KWH
NEW RENAISSANCE MIDDLE 231,001.000 KWH 220,424.000 KWH
NEW RIVER MIDDLE SCHOOL 125,664.000 KWH 34,824.000 KWH
NOB HILL ELEM 261,480.000 KWH 193,800.000 KWH
NORCREST ELEM 111,600.000 KWH 98,400.000 KWH
NORTH AREA MAINT/WHSE 125,556.000 KWH 163,097.000 KWH
NORTH AREA SUPERINTENDENT 32,880.000 KWH 28,260.000 KWH
NORTH BUS PARKING LOT 68,917.000 KWH 64,437.000 KWH
NORTH CENTRAL SUPERINTENDENT 86,460.000 KWH 75,000.000 KWH
NORTH FORK ELEM 110,520.000 KWH 90,120.000 KWH
NORTH LAUDERDALE ELEM 106,080.000 KWH 93,600.000 KWH
NORTH SIDE ELEMENTARY 125,400.000 KWH 86,760.000 KWH
NORTHEAST HIGH 343,997.000 KWH 320,885.000 KWH
NOVA BLANCHE FORMAN/EISENHOWER ELEM 251,815.000 KWH 205,200.000 KWH
NOVA EISENHOWER ELEMENTARY 8,693.000 KWH 8,840.000 KWH
NOVA HIGH 8,838.000 KWH 31,882.000 KWH
NOVA HIGH - MECH PLANT 596,800.000 KWH 616,000.000 KWH
NOVA HIGH COMM/GED 48.000 KWH .000 KWH
OAKLAND PARK ELEM 133,440.000 KWH 133,320.000 KWH
OAKRIDGE ELEM 119,462.000 KWH 106,610.000 KWH
OLSEN MIDDLE 171,600.000 KWH 183,960.000 KWH
OLSEN MIDDLE ANNEX 89,960.000 KWH 82,040.000 KWH
ORANGEBROOK ELEM 132,480.000 KWH 115,680.000 KWH
ORIOLE ELEM 95,760.000 KWH 87,840.000 KWH
PALM COVE ELEM 142,080.000 KWH 137,280.000 KWH
PALMVIEW ELEM 115,680.000 KWH 104,760.000 KWH
PANTHER RUN ELEM 107,040.000 KWH 92,760.000 KWH
PARK LAKES ELEMENTARY 183,600.000 KWH 151,680.000 KWH
PARK LAKES ELEMENTARY ANNEX 21,624.000 KWH 17,488.000 KWH
PARK RIDGE ELEM 91,440.000 KWH 76,080.000 KWH
PARK SPRINGS ELEM 147,120.000 KWH 131,520.000 KWH
PARK TRAILS ELEMENTARY 171,240.000 KWH 137,520.000 KWH
PARKSIDE ELEMENTARY 143,760.000 KWH 123,120.000 KWH
PARKWAY MIDDLE 365,734.000 KWH 319,361.000 KWH
PASADENA LAKES ELEM 134,539.000 KWH 123,996.000 KWH
PEMBROKE LAKES ELEM 110,160.000 KWH 98,100.000 KWH
PEMBROKE PINES ELEM 119,525.000 KWH 117,426.000 KWH
PERRY ELEM 128,634.000 KWH 122,194.000 KWH
PERRY MIDDLE 207,600.000 KWH 173,760.000 KWH
PETERS ELEM 90,027.000 KWH 114,828.000 KWH
PHYSICAL PLANT OPERATIONS 100,005.000 KWH 89,887.000 KWH
PINE RIDGE CTR 78,480.000 KWH 69,120.000 KWH
PINES LAKES ELEM 136,320.000 KWH 120,480.000 KWH
PINES MIDDLE 233,128.000 KWH 236,248.000 KWH
PINEWOOD ELEM 129,720.000 KWH 116,640.000 KWH
PIONEER MIDDLE 185,892.000 KWH 166,334.000 KWH
PIONEER MIDDLE ANNEX 32,220.000 KWH 31,500.000 KWH
PIPER HIGH 404,286.000 KWH 420,611.000 KWH
PLANTATION ELEM 131,376.000 KWH 106,879.000 KWH
PLANTATION HIGH 390,374.000 KWH 364,787.000 KWH
PLANTATION MIDDLE 192,220.000 KWH 169,261.000 KWH
PLANTATION PARK ELEM 91,401.000 KWH 73,122.000 KWH
POMPANO BEACH ELEM 119,160.000 KWH 119,880.000 KWH
POMPANO BEACH HIGH 308,327.000 KWH 266,793.000 KWH
POMPANO BEACH MIDDLE 211,896.000 KWH 182,208.000 KWH
PPO ZONE 2 - LEASED 103,029.000 KWH 43,326.000 KWH
QUIET WATERS ELEM 23,948.000 KWH 24,190.000 KWH
RAMBLEWOOD ELEM 142,080.000 KWH 95,220.000 KWH
RAMBLEWOOD MIDDLE 136,080.000 KWH 118,320.000 KWH
RICKARDS MIDDLE 272,880.000 KWH 221,591.000 KWH
RIVERGLADES ELEM 178,997.000 KWH 163,346.000 KWH
RIVERLAND ELEM 99,960.000 KWH 93,960.000 KWH
RIVERSIDE ELEM 111,240.000 KWH 107,880.000 KWH
ROCK ISLAND ADMIN 134,520.000 KWH 124,080.000 KWH
ROYAL PALM ELEMENTARY 54,912.000 KWH 51,672.000 KWH
SAFETY DEPARTMENT 168,447.000 KWH 142,670.000 KWH
SANDERS PARK ELEM 97,200.000 KWH 86,800.000 KWH
SANDPIPER ELEM 167,160.000 KWH 134,160.000 KWH
SAWGRASS ELEM 152,520.000 KWH 137,880.000 KWH
SAWGRASS SPRINGS MIDDLE 213,960.000 KWH 177,720.000 KWH
SEA CASTLE ELEM 166,560.000 KWH 157,200.000 KWH
SEAGULL SCHOOL 107,458.000 KWH 86,188.000 KWH
SEMINOLE MIDDLE 210,360.000 KWH 178,440.000 KWH
SHERIDAN HILLS ELEM 88,864.000 KWH 74,014.000 KWH
SHERIDAN PARK ELEM 110,160.000 KWH 99,120.000 KWH
SHERIDAN VOCATIONAL 352,320.000 KWH 259,920.000 KWH
SILVER LAKES ELEMENTARY 112,680.000 KWH 96,840.000 KWH
SILVER LAKES MIDDLE 212,400.000 KWH 144,360.000 KWH
SILVER PALMS ELEM 151,680.000 KWH 149,280.000 KWH
SILVER RIDGE ELEM 176,280.000 KWH 164,280.000 KWH
SILVER SHORES ELEMENTARY 136,800.000 KWH 109,080.000 KWH
SILVER TRAIL MIDDLE 246,720.000 KWH 231,840.000 KWH
SOUTH AREA BUS PARKING 36,112.000 KWH 36,115.000 KWH
SOUTH AREA MAINTENANCE 16,814.000 KWH 15,980.000 KWH
SOUTH BROWARD HIGH 408,268.000 KWH 361,949.000 KWH
SOUTH PLANTATION HIGH 471,307.000 KWH 411,721.000 KWH
SOUTH WEST BUS LOT 442.000 KWH 18,120.000 KWH
STEPHEN FOSTER ELEM 114,082.000 KWH 113,646.000 KWH
STIRLING ELEM 92,040.000 KWH 81,360.000 KWH
STONEMAN DOUGLAS HIGH 474,400.000 KWH 445,497.000 KWH
STRANAHAN HIGH 402,028.000 KWH 334,990.000 KWH
SUNLAND PARK ELEM 100,920.000 KWH 90,840.000 KWH
SUNRISE MIDDLE 224,818.000 KWH 185,473.000 KWH
SUNSET LAKES ELEMENTARY 127,080.000 KWH 126,480.000 KWH
SUNSET SCHOOL 104,112.000 KWH 92,832.000 KWH
SUNSHINE ELEMENTARY 113,518.000 KWH 112,200.000 KWH
TAMARAC ELEM 153,120.000 KWH 145,440.000 KWH
TARAVELLA HIGH 475,766.000 KWH 386,143.000 KWH
TECHNOLOGY AND SUPPORT SERVICE 351,600.000 KWH 331,440.000 KWH
TEDDER ELEMENTARY SCHOOL 128,551.000 KWH 114,219.000 KWH
TEQUESTA TRACE MIDDLE 211,800.000 KWH 208,680.000 KWH
THE QUEST CENTER 93,240.000 KWH 87,840.000 KWH
THURGOOD MARSHALL ELEM 116,664.000 KWH 105,744.000 KWH
TRADEWINDS ELEM 183,960.000 KWH 153,720.000 KWH
TRANSPORTATION SERVICE ANNEX .000 KWH 2,640.000 KWH
TROPICAL ELEM 100,868.000 KWH 101,177.000 KWH
TWIN LAKES ADMIN 59,520.000 KWH 56,160.000 KWH
TWIN LAKES ANNEX/NEW WHSE 2,524.000 KWH 2,566.000 KWH
TWIN LAKES COMPLEX 105,404.000 KWH 87,683.000 KWH
VEHICLE MAINTENANCE 86,400.000 KWH 75,840.000 KWH
VILLAGE ELEM 161,700.000 KWH 176,280.000 KWH
VIRGINIA YOUNG ELEM 104,160.000 KWH 83,160.000 KWH
WALKER ELEM 228,362.000 KWH 155,883.000 KWH
WALTER C YOUNG MIDDLE 416,317.000 KWH 390,115.000 KWH
WATKINS ELEM 153,840.000 KWH 126,600.000 KWH
WELLEBY ELEM 110,880.000 KWH 96,960.000 KWH
WEST BROWARD HIG/LLL .000 KWH 342,400.000 KWH
WEST CENTRAL BUS COMPLEX 59,417.000 KWH 70,967.000 KWH
WEST HOLLYWOOD ELEM 114,000.000 KWH 90,240.000 KWH
WESTCHESTER ELEMENTARY 142,386.000 KWH 130,834.000 KWH
WESTERN HIGH 396,860.000 KWH 376,934.000 KWH
WESTGLADES MIDDLE 277,920.000 KWH 260,640.000 KWH
WESTPINE MIDDLE 173,880.000 KWH 142,200.000 KWH
WESTWOOD HEIGHTS ELEM 162,036.000 KWH 134,422.000 KWH
WHIDDON-ROGERS ED CENTER 153,600.000 KWH 121,600.000 KWH
WHISPERING PINES 78,720.000 KWH 74,280.000 KWH
WILLIAM DANDY MIDDLE 226,320.000 KWH 176,520.000 KWH
WILTON MANORS ELEM 141,480.000 KWH 121,320.000 KWH
WINGATE OAKS CTR 101,760.000 KWH 85,680.000 KWH
WINSTON PARK ELEM 162,480.000 KWH 139,680.000 KWH