Building
Name |
Jan-08 |
Jan-09 |
| APOLLO
MIDDLE |
210,720.000
KWH |
208,080.000
KWH |
| ARTHUR
ASHE MIDDLE |
314,000.000
KWH |
263,600.000
KWH |
| ATLANTIC
VOC CENTER |
514,007.000
KWH |
434,030.000
KWH |
| ATLANTIC
WEST ELEM |
121,080.000
KWH |
119,760.000
KWH |
| ATTUCKS
MIDDLE |
264,003.000
KWH |
205,440.000
KWH |
| BAIR
MIDDLE |
194,640.000
KWH |
166,080.000
KWH |
| BANYAN
ELEM |
123,720.000
KWH |
111,720.000
KWH |
| BAYVIEW
ELEM |
81,360.000
KWH |
73,440.000
KWH |
| BECON |
286,680.000
KWH |
256,240.000
KWH |
| BENNETT
ELEM |
91,440.000
KWH |
94,800.000
KWH |
| BETHUNE
ELEM |
189,960.000
KWH |
163,680.000
KWH |
| BOULEVARD
HEIGHTS ELEM |
81,600.000
KWH |
116,520.000
KWH |
| BOYD
ANDERSON HIGH |
447,540.000
KWH |
375,319.000
KWH |
| BRIGHT
HORIZONS CTR |
110,160.000
KWH |
87,600.000
KWH |
| BROADVIEW
ELEM |
124,246.000
KWH |
112,477.000
KWH |
| BROWARD
EDUCATION FOUNDATION |
1,353.000
KWH |
.000
KWH |
| BROWARD
ESTATES ELEM |
104,657.000
KWH |
106,217.000
KWH |
| BROWARD
FIRE ACADEMY |
28,260.000
KWH |
32,521.000
KWH |
| CASTLE
HILL ELEM |
126,840.000
KWH |
135,720.000
KWH |
| CENTRAL
PARK ELEM |
128,160.000
KWH |
114,000.000
KWH |
| CHALLENGER
ELEMENTARY |
163,800.000
KWH |
96,720.000
KWH |
| CHAPEL
TRAIL ELEM |
171,177.000
KWH |
171,915.000
KWH |
| CHARLES
DREW ELEM |
99,720.000
KWH |
104,760.000
KWH |
| COCONUT
CREEK ELEM |
87,659.000
KWH |
84,651.000
KWH |
| COCONUT
CREEK HIGH |
335,506.000
KWH |
321,206.000
KWH |
| COCONUT
PALM ELEMENTARY |
134,760.000
KWH |
114,600.000
KWH |
| COLBERT
ELEM |
151,920.000
KWH |
111,360.000
KWH |
| COLLINS
ELEM |
76,800.000
KWH |
59,760.000
KWH |
| COOPER
CITY COMM |
19,200.000
KWH |
21,600.000
KWH |
| COMMUNITY
SCHOOL NORTH |
.000
KWH |
10,490.000
KWH |
| COMMUNITY
SCHOOL SOUTH |
4,975.000
KWH |
3,870.000
KWH |
| COOPER
CITY ELEM |
107,520.000
KWH |
94,320.000
KWH |
| COOPER
CITY HIGH |
532,607.000
KWH |
443,848.000
KWH |
| CORAL
COVE ELEMENTARY |
88,800.000
KWH |
99,120.000
KWH |
| CORAL
GLADES HIGH |
420,240.000
KWH |
313,680.000
KWH |
| CORAL
PARK ELEM |
98,760.000
KWH |
115,320.000
KWH |
| CORAL
SPRINGS ELEM |
96,720.000
KWH |
109,920.000
KWH |
| CORAL
SPRINGS HIGH |
361,494.000
KWH |
379,791.000
KWH |
| CORAL
SPRINGS MIDDLE |
207,640.000
KWH |
170,440.000
KWH |
| COUNTRY
HILLS ELEM |
192,480.000
KWH |
121,800.000
KWH |
| COUNTRY
ISLES ELEM |
152,640.000
KWH |
163,560.000
KWH |
| CRESTHAVEN
ELEM |
109,200.000
KWH |
94,560.000
KWH |
| CROISSANT
PARK ELEM |
106,300.000
KWH |
100,877.000
KWH |
| CROSS
CREEK |
68,760.000
KWH |
68,880.000
KWH |
| CRYSTAL
LAKE COMM SCHOOL |
6,846.000
KWH |
5,530.000
KWH |
| CRYSTAL
LAKE MIDDLE |
226,408.000
KWH |
184,488.000
KWH |
| CYPRESS
BAY HIGH |
517,200.000
KWH |
526,000.000
KWH |
| CYPRESS
BAY HIGH ANNEX |
41,520.000
KWH |
61,920.000
KWH |
| CYPRESS
ELEM |
107,280.000
KWH |
91,200.000
KWH |
| CYPRESS
RUN ALTERNATIVE |
45,533.000
KWH |
63,498.000
KWH |
| DANIA
ELEM |
117,790.000
KWH |
149,245.000
KWH |
| DAVE
THOMAS ED CENTER (WEST) |
99,360.000
KWH |
107,760.000
KWH |
| DAVE
THOMAS EDUCATION CENTER |
43,262.000
KWH |
34,695.000
KWH |
| DAVIE
ELEM |
110,860.000
KWH |
94,551.000
KWH |
| DEERFIELD
BEACH ELEM |
163,685.000
KWH |
141,929.000
KWH |
| DEERFIELD
BEACH HIGH |
396,960.000
KWH |
360,478.000
KWH |
| DEERFIELD
BEACH MID |
243,477.000
KWH |
192,982.000
KWH |
| DEERFIELD
PARK ELEM |
126,480.000
KWH |
99,600.000
KWH |
| DILLARD
ELEM |
126,600.000
KWH |
141,600.000
KWH |
| DILLARD
HIGH COMM |
3,144.000
KWH |
.000
KWH |
| DILLARD
HIGH SCHOOL |
672,784.000
KWH |
649,461.000
KWH |
| DOLPHIN
BAY ELEMENTARY |
106,080.000
KWH |
97,680.000
KWH |
| DREW
RESOURCE CTR |
67,703.000
KWH |
53,824.000
KWH |
| DRIFTWOOD
ELEM |
105,876.000
KWH |
73,830.000
KWH |
| DRIFTWOOD
MIDDLE |
383,018.000
KWH |
347,858.000
KWH |
| EAGLE
POINT ELEM |
222,600.000
KWH |
194,640.000
KWH |
| EAGLE
RIDGE ELEM |
144,480.000
KWH |
120,120.000
KWH |
| ECIA
SPECIAL PROGRAMS |
20,014.000
KWH |
18,088.000
KWH |
| EDGEWOOD
CENTER |
36,016.000
KWH |
31,336.000
KWH |
| ELY
HIGH |
743,002.000
KWH |
602,577.000
KWH |
| EMBASSY
CREEK ELEM |
83,160.000
KWH |
96,600.000
KWH |
| ENDEAVOR
LEARNING CENTER |
81,240.000
KWH |
79,920.000
KWH |
| EVERGLADES
ELEMENTARY |
169,753.000
KWH |
172,646.000
KWH |
| EVERGLADES
HIGH |
528,600.000
KWH |
517,200.000
KWH |
| FAIRWAY
ELEM |
207,000.000
KWH |
200,640.000
KWH |
| FALCON
COVE MIDDLE |
410,629.000
KWH |
403,989.000
KWH |
| FLAMINGO
ELEM |
120,328.000
KWH |
86,248.000
KWH |
| FLANAGAN
HIGH |
486,725.000
KWH |
448,933.000
KWH |
| FLORANADA
ELEM |
127,536.000
KWH |
113,616.000
KWH |
| FOREST
GLEN MIDDLE |
227,370.000
KWH |
228,258.000
KWH |
| FOREST
HILLS ELEM |
99,720.000
KWH |
115,560.000
KWH |
| FORT
LAUDERDALE HIGH |
557,732.000
KWH |
486,948.000
KWH |
| FOX
TRAIL ELEMENTARY |
137,520.000
KWH |
132,240.000
KWH |
| GATOR
RUN ELEMENTARY |
203,760.000
KWH |
176,160.000
KWH |
| GLADES
MIDDLE |
262,800.000
KWH |
297,200.000
KWH |
| GRIFFIN
ELEM |
96,960.000
KWH |
75,720.000
KWH |
| GULFSTREAM
MIDDLE SCHOOL |
89,160.000
KWH |
70,080.000
KWH |
| HALLANDALE
ADULT CENTER |
167,389.000
KWH |
144,678.000
KWH |
| HALLANDALE
ELEM |
171,600.000
KWH |
119,760.000
KWH |
| HALLANDALE
HIGH |
263,125.000
KWH |
263,316.000
KWH |
| HARBORDALE
ELEM |
83,496.000
KWH |
65,208.000
KWH |
| HAWKES
BLUFF ELEM |
138,960.000
KWH |
119,763.000
KWH |
| HOLLYWOOD
CENTRAL AUDITORIUM |
35,820.000
KWH |
31,080.000
KWH |
| HOLLYWOOD
CENTRAL ELEM |
106,080.000
KWH |
89,520.000
KWH |
| HOLLYWOOD
HILLS COMMUNITY |
2,735.000
KWH |
2,144.000
KWH |
| HOLLYWOOD
HILLS ELEMENTARY |
.000
KWH |
130,800.000
KWH |
| HOLLYWOOD
HILLS HIGH |
368,395.000
KWH |
324,836.000
KWH |
| HOLLYWOOD
PARK ELEM |
87,600.000
KWH |
66,480.000
KWH |
| HORIZON
ELEM |
101,040.000
KWH |
75,960.000
KWH |
| HORTT
ADMIN SITE |
49,661.000
KWH |
46,878.000
KWH |
| INDIAN
RIDGE MIDDLE |
291,180.000
KWH |
241,259.000
KWH |
| INDIAN
TRACE ELEM |
124,440.000
KWH |
109,680.000
KWH |
| JAMES
HUNT ELEMENTARY |
112,080.000
KWH |
93,240.000
KWH |
| KATHLEEN
WRIGHT ADMIN |
431,861.000
KWH |
357,641.000
KWH |
| LAKE
FOREST ELEM |
182,448.000
KWH |
167,760.000
KWH |
| LAKESIDE
ELEMENTARY |
117,600.000
KWH |
99,600.000
KWH |
| LANIER
JAMES CENTER |
57,120.000
KWH |
51,600.000
KWH |
| LARKDALE
ELEM |
106,736.000
KWH |
98,191.000
KWH |
| LAUDERDALE
LAKES MIDDLE |
166,560.000
KWH |
140,400.000
KWH |
| LAUDERDALE
MANORS ELEM |
274,920.000
KWH |
227,520.000
KWH |
| LAUDERHILL
MIDDLE |
158,160.000
KWH |
133,920.000
KWH |
| LAUDERHILL
MIDDLE/COMM |
3,237.000
KWH |
3,147.000
KWH |
| LAUDERHILL
PT ELEM |
150,120.000
KWH |
162,960.000
KWH |
| LIBERTY
ELEMENTARY |
126,240.000
KWH |
122,880.000
KWH |
| LLOYD
ESTATES ELEM |
91,920.000
KWH |
73,200.000
KWH |
| LOCKHART
STADIUM |
47,575.000
KWH |
41,601.000
KWH |
| LYONS
CREEK MIDDLE |
285,840.000
KWH |
330,000.000
KWH |
| MANATEE
BAY ELEMENTARY |
132,008.000
KWH |
121,329.000
KWH |
| MAPLEWOOD
ELEM |
131,880.000
KWH |
108,840.000
KWH |
| MARGATE
ELEM |
137,760.000
KWH |
142,440.000
KWH |
| MARGATE
MIDDLE |
188,407.000
KWH |
179,229.000
KWH |
| MARKHAM
ELEM |
101,859.000
KWH |
130,825.000
KWH |
| MARTIN
LUTHER KING ELEM |
142,122.000
KWH |
136,355.000
KWH |
| MCARTHUR
HIGH |
409,025.000
KWH |
411,327.000
KWH |
| MCFATTER
VO TECH |
360,240.000
KWH |
268,800.000
KWH |
| MCNAB
ELEMENTARY |
166,680.000
KWH |
121,438.000
KWH |
| MCNICOL
MIDDLE |
238,080.000
KWH |
244,320.000
KWH |
| MEADOWBROOK
ELEM |
94,866.000
KWH |
130,018.000
KWH |
| MILLENNIUM
MIDDLE |
272,400.000
KWH |
258,240.000
KWH |
| MIRAMAR
ELEM |
131,160.000
KWH |
128,040.000
KWH |
| MIRAMAR
HIGH |
431,353.000
KWH |
431,416.000
KWH |
| MIRROR
LAKE ELEM |
76,560.000
KWH |
73,680.000
KWH |
| MONARCH
HIGH |
353,600.000
KWH |
341,200.000
KWH |
| MORROW
ELEM |
108,120.000
KWH |
95,280.000
KWH |
| MULTICULTURAL
CENTER |
5,160.000
KWH |
9,360.000
KWH |
| N
ANDREWS GARDENS ELEM |
138,624.000
KWH |
149,184.000
KWH |
| NEW
RENAISSANCE MIDDLE |
219,942.000
KWH |
200,770.000
KWH |
| NEW
RIVER MIDDLE SCHOOL |
104,904.000
KWH |
41,424.000
KWH |
| NOB
HILL ELEM |
248,400.000
KWH |
160,920.000
KWH |
| NORCREST
ELEM |
96,720.000
KWH |
97,320.000
KWH |
| NORTH
AREA MAINT/WHSE |
127,580.000
KWH |
182,674.000
KWH |
| NORTH
AREA SUPERINTENDENT |
31,440.000
KWH |
28,920.000
KWH |
| NORTH
BUS PARKING LOT |
70,692.000
KWH |
68,404.000
KWH |
| NORTH
CENTRAL SUPERINTENDENT |
87,840.000
KWH |
83,400.000
KWH |
| NORTH
FORK ELEM |
141,360.000
KWH |
96,480.000
KWH |
| NORTH
LAUDERDALE ELEM |
99,840.000
KWH |
90,720.000
KWH |
| NORTH
SIDE ELEMENTARY |
110,760.000
KWH |
107,640.000
KWH |
| NORTHEAST
HIGH |
337,534.000
KWH |
354,936.000
KWH |
| NOVA
BLANCHE FORMAN/EISENHOWER ELEM |
233,600.000
KWH |
192,400.000
KWH |
| NOVA
EISENHOWER ELEMENTARY |
10,502.000
KWH |
10,562.000
KWH |
| NOVA
HIGH |
5,387.000
KWH |
28,345.000
KWH |
| NOVA
HIGH - MECH PLANT |
640,000.000
KWH |
692,800.000
KWH |
| NOVA
HIGH COMM/GED |
59.000
KWH |
.000
KWH |
| OAKLAND
PARK ELEM |
135,360.000
KWH |
105,480.000
KWH |
| OAKRIDGE
ELEM |
117,929.000
KWH |
110,963.000
KWH |
| OLSEN
MIDDLE |
177,840.000
KWH |
175,200.000
KWH |
| OLSEN
MIDDLE ANNEX |
104,840.000
KWH |
77,240.000
KWH |
| ORANGEBROOK
ELEM |
132,720.000
KWH |
107,280.000
KWH |
| ORIOLE
ELEM |
102,720.000
KWH |
82,080.000
KWH |
| PALM
COVE ELEM |
127,440.000
KWH |
136,560.000
KWH |
| PALMVIEW
ELEM |
131,400.000
KWH |
114,960.000
KWH |
| PANTHER
RUN ELEM |
71,040.000
KWH |
80,040.000
KWH |
| PARK
LAKES ELEMENTARY |
139,680.000
KWH |
162,240.000
KWH |
| PARK
LAKES ELEMENTARY ANNEX |
24,264.000
KWH |
17,608.000
KWH |
| PARK
RIDGE ELEM |
91,200.000
KWH |
73,680.000
KWH |
| PARK
SPRINGS ELEM |
129,840.000
KWH |
130,560.000
KWH |
| PARK
TRAILS ELEMENTARY |
168,960.000
KWH |
128,640.000
KWH |
| PARKSIDE
ELEMENTARY |
133,200.000
KWH |
120,960.000
KWH |
| PARKWAY
MIDDLE |
371,727.000
KWH |
313,341.000
KWH |
| PASADENA
LAKES ELEM |
145,917.000
KWH |
161,539.000
KWH |
| PEMBROKE
LAKES ELEM |
95,340.000
KWH |
99,960.000
KWH |
| PEMBROKE
PINES ELEM |
93,728.000
KWH |
97,581.000
KWH |
| PERRY
ELEM |
123,639.000
KWH |
104,606.000
KWH |
| PERRY
MIDDLE |
195,360.000
KWH |
186,240.000
KWH |
| PETERS
ELEM |
132,978.000
KWH |
150,528.000
KWH |
| PHYSICAL
PLANT OPERATIONS |
94,900.000
KWH |
93,725.000
KWH |
| PINE
RIDGE CTR |
78,240.000
KWH |
72,240.000
KWH |
| PINES
LAKES ELEM |
130,080.000
KWH |
142,200.000
KWH |
| PINES
MIDDLE |
216,328.000
KWH |
218,008.000
KWH |
| PINEWOOD
ELEM |
138,720.000
KWH |
118,440.000
KWH |
| PIONEER
MIDDLE |
155,279.000
KWH |
171,202.000
KWH |
| PIONEER
MIDDLE ANNEX |
28,620.000
KWH |
31,680.000
KWH |
| PIPER
HIGH |
368,162.000
KWH |
433,346.000
KWH |
| PLANTATION
ELEM |
122,891.000
KWH |
111,622.000
KWH |
| PLANTATION
HIGH |
344,253.000
KWH |
290,223.000
KWH |
| PLANTATION
MIDDLE |
194,823.000
KWH |
175,619.000
KWH |
| PLANTATION
PARK ELEM |
73,404.000
KWH |
70,017.000
KWH |
| POMPANO
BEACH ELEM |
115,200.000
KWH |
156,720.000
KWH |
| POMPANO
BEACH HIGH |
326,919.000
KWH |
308,557.000
KWH |
| POMPANO
BEACH MIDDLE |
201,576.000
KWH |
182,568.000
KWH |
| PPO
ZONE 2 - LEASED |
70,476.000
KWH |
49,388.000
KWH |
| QUIET
WATERS ELEM |
25,089.000
KWH |
27,465.000
KWH |
| RAMBLEWOOD
ELEM |
153,180.000
KWH |
92,160.000
KWH |
| RAMBLEWOOD
MIDDLE |
118,560.000
KWH |
144,000.000
KWH |
| RICKARDS
MIDDLE |
305,280.000
KWH |
200,480.000
KWH |
| RIVERGLADES
ELEM |
168,303.000
KWH |
169,908.000
KWH |
| RIVERLAND
ELEM |
94,200.000
KWH |
93,000.000
KWH |
| RIVERSIDE
ELEM |
95,760.000
KWH |
127,800.000
KWH |
| ROCK
ISLAND ADMIN |
125,160.000
KWH |
131,880.000
KWH |
| ROYAL
PALM ELEMENTARY |
70,752.000
KWH |
36,792.000
KWH |
| SAFETY
DEPARTMENT |
146,792.000
KWH |
146,386.000
KWH |
| SANDERS
PARK ELEM |
101,600.000
KWH |
87,600.000
KWH |
| SANDPIPER
ELEM |
151,800.000
KWH |
143,880.000
KWH |
| SAWGRASS
ELEM |
131,400.000
KWH |
126,720.000
KWH |
| SAWGRASS
SPRINGS MIDDLE |
167,760.000
KWH |
182,400.000
KWH |
| SEA
CASTLE ELEM |
152,880.000
KWH |
150,000.000
KWH |
| SEAGULL
SCHOOL |
98,846.000
KWH |
86,766.000
KWH |
| SEMINOLE
MIDDLE |
224,880.000
KWH |
165,720.000
KWH |
| SHERIDAN
HILLS ELEM |
81,597.000
KWH |
79,678.000
KWH |
| SHERIDAN
PARK ELEM |
114,240.000
KWH |
104,640.000
KWH |
| SHERIDAN
VOCATIONAL |
355,200.000
KWH |
269,520.000
KWH |
| SILVER
LAKES ELEMENTARY |
65,160.000
KWH |
92,400.000
KWH |
| SILVER
LAKES MIDDLE |
205,200.000
KWH |
145,320.000
KWH |
| SILVER
PALMS ELEM |
143,160.000
KWH |
125,520.000
KWH |
| SILVER
RIDGE ELEM |
181,200.000
KWH |
169,200.000
KWH |
| SILVER
SHORES ELEMENTARY |
129,360.000
KWH |
107,040.000
KWH |
| SILVER
TRAIL MIDDLE |
225,120.000
KWH |
212,400.000
KWH |
| SOUTH
AREA BUS PARKING |
33,027.000
KWH |
33,974.000
KWH |
| SOUTH
AREA MAINTENANCE |
19,751.000
KWH |
15,583.000
KWH |
| SOUTH
BROWARD HIGH |
439,214.000
KWH |
379,183.000
KWH |
| SOUTH
PLANTATION HIGH |
411,305.000
KWH |
340,386.000
KWH |
| SOUTH
WEST BUS LOT |
321.000
KWH |
19,570.000
KWH |
| STEPHEN
FOSTER ELEM |
122,556.000
KWH |
115,998.000
KWH |
| STIRLING
ELEM |
92,040.000
KWH |
84,600.000
KWH |
| STONEMAN
DOUGLAS HIGH |
470,800.000
KWH |
403,200.000
KWH |
| STRANAHAN
HIGH |
371,920.000
KWH |
293,659.000
KWH |
| SUNLAND
PARK ELEM |
118,320.000
KWH |
102,240.000
KWH |
| SUNRISE
MIDDLE |
262,212.000
KWH |
200,877.000
KWH |
| SUNSET
LAKES ELEMENTARY |
77,280.000
KWH |
172,920.000
KWH |
| SUNSET
SCHOOL |
135,192.000
KWH |
98,472.000
KWH |
| SUNSHINE
ELEMENTARY |
107,242.000
KWH |
106,116.000
KWH |
| TAMARAC
ELEM |
213,990.000
KWH |
135,840.000
KWH |
| TARAVELLA
HIGH |
413,704.000
KWH |
425,313.000
KWH |
| TECHNOLOGY
AND SUPPORT SERVICE |
387,600.000
KWH |
404,640.000
KWH |
| TEDDER
ELEMENTARY SCHOOL |
141,238.000
KWH |
106,220.000
KWH |
| TEQUESTA
TRACE MIDDLE |
228,000.000
KWH |
202,440.000
KWH |
| THE
QUEST CENTER |
89,760.000
KWH |
98,640.000
KWH |
| THURGOOD
MARSHALL ELEM |
99,624.000
KWH |
101,784.000
KWH |
| TRADEWINDS
ELEM |
190,680.000
KWH |
183,720.000
KWH |
| TRANSPORTATION
SERVICE ANNEX |
.000
KWH |
3,120.000
KWH |
| TROPICAL
ELEM |
105,095.000
KWH |
102,608.000
KWH |
| TWIN
LAKES ADMIN |
55,440.000
KWH |
60,240.000
KWH |
| TWIN
LAKES ANNEX/NEW WHSE |
3,441.000
KWH |
4,151.000
KWH |
| TWIN
LAKES COMPLEX |
97,698.000
KWH |
97,625.000
KWH |
| VEHICLE
MAINTENANCE |
81,360.000
KWH |
79,680.000
KWH |
| VILLAGE
ELEM |
160,200.000
KWH |
186,360.000
KWH |
| VIRGINIA
YOUNG ELEM |
112,080.000
KWH |
86,160.000
KWH |
| WALKER
ELEM |
233,573.000
KWH |
170,881.000
KWH |
| WALTER
C YOUNG MIDDLE |
402,978.000
KWH |
397,534.000
KWH |
| WATKINS
ELEM |
141,480.000
KWH |
123,240.000
KWH |
| WELLEBY
ELEM |
97,680.000
KWH |
103,200.000
KWH |
| WEST
BROWARD HIG/LLL |
.000
KWH |
384,000.000
KWH |
| WEST
CENTRAL BUS COMPLEX |
70,551.000
KWH |
70,578.000
KWH |
| WEST
HOLLYWOOD ELEM |
110,640.000
KWH |
131,520.000
KWH |
| WESTCHESTER
ELEMENTARY |
130,480.000
KWH |
122,629.000
KWH |
| WESTERN
HIGH |
392,659.000
KWH |
343,972.000
KWH |
| WESTGLADES
MIDDLE |
250,560.000
KWH |
238,080.000
KWH |
| WESTPINE
MIDDLE |
157,200.000
KWH |
158,880.000
KWH |
| WESTWOOD
HEIGHTS ELEM |
156,047.000
KWH |
124,277.000
KWH |
| WHIDDON-ROGERS
ED CENTER |
144,800.000
KWH |
115,200.000
KWH |
| WHISPERING
PINES |
75,960.000
KWH |
72,360.000
KWH |
| WILLIAM
DANDY MIDDLE |
212,160.000
KWH |
165,000.000
KWH |
| WILTON
MANORS ELEM |
135,480.000
KWH |
124,800.000
KWH |
| WINGATE
OAKS CTR |
94,440.000
KWH |
84,720.000
KWH |
| WINSTON
PARK ELEM |
157,920.000
KWH |
137,760.000