Building
Name |
July-07 |
July-08 |
| APOLLO
MIDDLE |
206,160.000
KWH |
218,640.000
KWH |
| ARTHUR
ASHE MIDDLE |
293,200.000
KWH |
318,000.000
KWH |
| ATLANTIC
VOC CENTER |
605,298.000
KWH |
599,099.000
KWH |
| ATLANTIC
WEST ELEM |
166,080.000
KWH |
143,040.000
KWH |
| ATTUCKS
MIDDLE |
300,376.000
KWH |
215,520.000
KWH |
| BAIR
MIDDLE |
201,360.000
KWH |
162,000.000
KWH |
| BANYAN
ELEM |
130,800.000
KWH |
102,120.000
KWH |
| BAYVIEW
ELEM |
75,840.000
KWH |
79,080.000
KWH |
| BECON |
211,520.000
KWH |
270,640.000
KWH |
| BENNETT
ELEM |
96,240.000
KWH |
124,800.000
KWH |
| BETHUNE
ELEM |
267,000.000
KWH |
204,480.000
KWH |
| BOULEVARD
HEIGHTS ELEM |
90,840.000
KWH |
122,160.000
KWH |
| BOYD
ANDERSON HIGH |
453,480.000
KWH |
478,754.000
KWH |
| BRIGHT
HORIZONS CTR |
129,360.000
KWH |
109,920.000
KWH |
| BROADVIEW
ELEM |
127,665.000
KWH |
125,911.000
KWH |
| BROWARD
EDUCATION FOUNDATION |
18,701.000
KWH |
.000
KWH |
| BROWARD
ESTATES ELEM |
163,606.000
KWH |
139,112.000
KWH |
| BROWARD
FIRE ACADEMY |
40,320.000
KWH |
36,574.000
KWH |
| CASTLE
HILL ELEM |
104,640.000
KWH |
135,720.000
KWH |
| CENTRAL
PARK ELEM |
36,720.000
KWH |
.000
KWH |
| CHALLENGER
ELEMENTARY |
177,720.000
KWH |
138,720.000
KWH |
| CHAPEL
TRAIL ELEM |
161,280.000
KWH |
140,160.000
KWH |
| CHARLES
DREW ELEM |
178,248.000
KWH |
175,636.000
KWH |
| COCONUT
CREEK ELEM |
92,040.000
KWH |
104,640.000
KWH |
| COCONUT
CREEK HIGH |
98,951.000
KWH |
73,213.000
KWH |
| COCONUT
PALM ELEMENTARY |
361,587.000
KWH |
290,986.000
KWH |
| COLBERT
ELEM |
147,720.000
KWH |
144,000.000
KWH |
| COLLINS
ELEM |
110,160.000
KWH |
120,960.000
KWH |
| COOPER
CITY COMM |
73,680.000
KWH |
60,960.000
KWH |
| COOPER
CITY ELEM |
11,262.000
KWH |
4,342.000
KWH |
| COOPER
CITY HIGH |
81,600.000
KWH |
103,680.000
KWH |
| CORAL
COVE ELEMENTARY |
590,816.000
KWH |
616,362.000
KWH |
| CORAL
GLADES HIGH |
93,360.000
KWH |
113,520.000
KWH |
| CORAL
PARK ELEM |
420,000.000
KWH |
410,640.000
KWH |
| CORAL
SPRINGS ELEM |
112,920.000
KWH |
100,800.000
KWH |
| CORAL
SPRINGS COMMUNITY |
128,640.000
KWH |
120,240.000
KWH |
| CORAL
SPRINGS HIGH |
416,518.000
KWH |
401,641.000
KWH |
| CORAL
SPRINGS MIDDLE |
237,640.000
KWH |
240,040.000
KWH |
| COUNTRY
HILLS ELEM |
155,400.000
KWH |
150,960.000
KWH |
| COUNTRY
ISLES ELEM |
180,720.000
KWH |
146,640.000
KWH |
| CRESTHAVEN
ELEM |
103,680.000
KWH |
95,280.000
KWH |
| CROISSANT
PARK ELEM |
118,419.000
KWH |
100,332.000
KWH |
| CROSS
CREEK |
68,700.000
KWH |
65,040.000
KWH |
| CRYSTAL
LAKE COMM SCHOOL |
12,011.000
KWH |
11,685.000
KWH |
| CRYSTAL
LAKE MIDDLE |
245,190.000
KWH |
221,464.000
KWH |
| CYPRESS
BAY HIGH |
484,800.000
KWH |
458,400.000
KWH |
| CYPRESS
BAY HIGH ANNEX |
272,364.000
KWH |
74,400.000
KWH |
| CYPRESS
ELEM |
135,600.000
KWH |
92,160.000
KWH |
| CYPRESS
RUN ALTERNATIVE |
51,876.000
KWH |
87,282.000
KWH |
| DANIA
ELEM |
117,916.000
KWH |
138,095.000
KWH |
| DAVE
THOMAS ED CENTER (WEST) |
104,640.000
KWH |
117,360.000
KWH |
| DAVE
THOMAS EDUCATION CENTER |
46,400.000
KWH |
48,984.000
KWH |
| DAVIE
ELEM |
163,862.000
KWH |
95,319.000
KWH |
| DEERFIELD
BEACH ELEM |
142,547.000
KWH |
203,400.000
KWH |
| DEERFIELD
BEACH HIGH |
388,983.000
KWH |
351,851.000
KWH |
| DEERFIELD
BEACH MID |
283,355.000
KWH |
252,518.000
KWH |
| DEERFIELD
PARK ELEM |
153,360.000
KWH |
101,520.000
KWH |
| DILLARD
ELEM |
129,720.000
KWH |
109,080.000
KWH |
| DILLARD
HIGH COMM |
5,504.000
KWH |
6,832.000
KWH |
| DILLARD
HIGH SCHOOL |
654,688.000
KWH |
593,922.000
KWH |
| DOLPHIN
BAY ELEMENTARY |
105,120.000
KWH |
100,080.000
KWH |
| DREW
RESOURCE CTR |
93,789.000
KWH |
72,685.000
KWH |
| DRIFTWOOD
ELEM |
146,357.000
KWH |
110,017.000
KWH |
| DRIFTWOOD
MIDDLE |
416,022.000
KWH |
440,339.000
KWH |
| EAGLE
POINT ELEM |
245,160.000
KWH |
198,960.000
KWH |
| EAGLE
RIDGE ELEM |
136,800.000
KWH |
201,120.000
KWH |
| ECIA
SPECIAL PROGRAMS |
41,387.000
KWH |
32,989.000
KWH |
| EDGEWOOD
CENTER |
81,736.000
KWH |
56,416.000
KWH |
| ELY
HIGH |
644,793.000
KWH |
573,390.000
KWH |
| EMBASSY
CREEK ELEM |
92,400.000
KWH |
95,400.000
KWH |
| ENDEAVOR
LEARNING CENTER |
31,080.000
KWH |
79,200.000
KWH |
| EVERGLADES
9TH GRADE ANNEX |
159,698.000
KWH |
120,684.000
KWH |
| EVERGLADES
ELEMENTARY |
205,854.000
KWH |
211,510.000
KWH |
| EVERGLADES
HIGH |
712,200.000
KWH |
485,640.000
KWH |
| FAIRWAY
ELEM |
205,920.000
KWH |
182,880.000
KWH |
| FALCON
COVE MIDDLE |
394,040.000
KWH |
375,801.000
KWH |
| FLAMINGO
ELEM |
117,448.000
KWH |
125,728.000
KWH |
| FLANAGAN
HIGH |
583,104.000
KWH |
447,433.000
KWH |
| FLORANADA
ELEM |
120,696.000
KWH |
116,976.000
KWH |
| FOREST
GLEN MIDDLE |
264,452.000
KWH |
197,982.000
KWH |
| FOREST
HILLS ELEM |
124,320.000
KWH |
118,680.000
KWH |
| FORT
LAUDERDALE HIGH |
478,645.000
KWH |
575,413.000
KWH |
| FORT
LAUDERDALE HIGH ANNEX |
139,920.000
KWH |
136,800.000
KWH |
| FOX
TRAIL ELEMENTARY |
234,960.000
KWH |
236,640.000
KWH |
| GATOR
RUN ELEMENTARY |
.000
KWH |
324,000.000
KWH |
| GRIFFIN
ELEM |
104,160.000
KWH |
68,280.000
KWH |
| GULFSTREAM
MIDDLE SCHOOL |
109,080.000
KWH |
80,640.000
KWH |
| HALLANDALE
ADULT CENTER |
205,669.000
KWH |
190,262.000
KWH |
| HALLANDALE
ELEM |
212,640.000
KWH |
156,480.000
KWH |
| HALLANDALE
HIGH |
329,406.000
KWH |
275,522.000
KWH |
| HARBORDALE
ELEM |
101,976.000
KWH |
34,848.000
KWH |
| HAWKES
BLUFF ELEM |
141,849.000
KWH |
158,420.000
KWH |
| HOLLYWOOD
CENTRAL AUDITORIUM |
47,400.000
KWH |
47,940.000
KWH |
| HOLLYWOOD
CENTRAL ELEM |
88,920.000
KWH |
89,760.000
KWH |
| HOLLYWOOD
HILLS COMMUNITY |
.000
KWH |
4,680.000
KWH |
| HOLLYWOOD
HILLS ELEMENTARY |
83,040.000
KWH |
168,000.000
KWH |
| HOLLYWOOD
HILLS HIGH |
327,392.000
KWH |
348,036.000
KWH |
| HOLLYWOOD
PARK ELEM |
97,920.000
KWH |
83,280.000
KWH |
| HORIZON
ELEM |
116,640.000
KWH |
130,560.000
KWH |
| HORTT
ADMIN SITE |
81,390.000
KWH |
76,790.000
KWH |
| INDIAN
RIDGE MIDDLE |
297,569.000
KWH |
256,895.000
KWH |
| INDIAN
TRACE ELEM |
135,720.000
KWH |
126,360.000
KWH |
| JAMES
HUNT ELEMENTARY |
134,280.000
KWH |
114,960.000
KWH |
| KATHLEEN
WRIGHT ADMIN |
456,426.000
KWH |
475,278.000
KWH |
| LAKE
FOREST ELEM |
187,608.000
KWH |
200,040.000
KWH |
| LAKESIDE
ELEMENTARY |
103,680.000
KWH |
106,560.000
KWH |
| LANIER
JAMES CENTER |
79,200.000
KWH |
66,960.000
KWH |
| LARKDALE
ELEM |
125,890.000
KWH |
149,772.000
KWH |
| LAUDERDALE
LAKES MIDDLE |
181,800.000
KWH |
177,120.000
KWH |
| LAUDERDALE
MANORS ELEM |
228,000.000
KWH |
223,200.000
KWH |
| LAUDERHILL
MIDDLE |
185,040.000
KWH |
177,480.000
KWH |
| LAUDERHILL
MIDDLE/COMM |
5,049.000
KWH |
4,140.000
KWH |
| LAUDERHILL
PT ELEM |
112,560.000
KWH |
138,720.000
KWH |
| LIBERTY
ELEMENTARY |
208,560.000
KWH |
175,200.000
KWH |
| LLOYD
ESTATES ELEM |
119,280.000
KWH |
106,320.000
KWH |
| LOCKHART
STADIUM |
47,250.000
KWH |
93,801.000
KWH |
| LYONS
CREEK MIDDLE |
306,480.000
KWH |
282,960.000
KWH |
| MANATEE
BAY ELEMENTARY |
135,392.000
KWH |
220,546.000
KWH |
| MAPLEWOOD
ELEM |
155,760.000
KWH |
107,280.000
KWH |
| MARGATE
ELEM |
150,780.000
KWH |
175,680.000
KWH |
| MARGATE
MIDDLE |
281,177.000
KWH |
211,370.000
KWH |
| MARKHAM
ELEM |
110,689.000
KWH |
137,194.000
KWH |
| MARTIN
LUTHER KING ELEM |
164,306.000
KWH |
151,643.000
KWH |
| MCARTHUR
HIGH |
408,174.000
KWH |
455,246.000
KWH |
| MCFATTER
VO TECH |
368,160.000
KWH |
351,600.000
KWH |
| MCNAB
ELEMENTARY |
150,480.000
KWH |
114,960.000
KWH |
| MCNICOL
MIDDLE |
291,120.000
KWH |
293,280.000
KWH |
| MEADOWBROOK
ELEM |
102,687.000
KWH |
117,879.000
KWH |
| MILLENNIUM
MIDDLE |
293,040.000
KWH |
288,480.000
KWH |
| MIRAMAR
ELEM |
162,600.000
KWH |
128,400.000
KWH |
| MIRAMAR
HIGH |
513,205.000
KWH |
460,492.000
KWH |
| MIRROR
LAKE ELEM |
78,720.000
KWH |
73,440.000
KWH |
| MONARCH
HIGH |
355,200.000
KWH |
412,400.000
KWH |
| MORROW
ELEM |
114,480.000
KWH |
90,840.000
KWH |
| MULTICULTURAL
CENTER |
29,640.000
KWH |
17,160.000
KWH |
| N
ANDREWS GARDENS ELEM |
213,120.000
KWH |
130,584.000
KWH |
| NEW
RENAISSANCE MIDDLE |
167,353.000
KWH |
146,728.000
KWH |
| NEW
RIVER MIDDLE SCHOOL |
198,204.000
KWH |
179,184.000
KWH |
| NOB
HILL ELEM |
242,280.000
KWH |
190,080.000
KWH |
| NORCREST
ELEM |
108,840.000
KWH |
80,400.000
KWH |
| NORTH
AREA MAINT/WHSE |
129,624.000
KWH |
99,935.000
KWH |
| NORTH
AREA SUPERINTENDENT |
29,760.000
KWH |
36,780.000
KWH |
| NORTH
BUS PARKING LOT |
81,181.000
KWH |
81,409.000
KWH |
| NORTH
CENTRAL SUPERINTENDENT |
5,314.000
KWH |
.000
KWH |
| NORTH
FORK ELEM |
107,160.000
KWH |
102,060.000
KWH |
| NORTH
LAUDERDALE ELEM |
128,280.000
KWH |
163,680.000
KWH |
| NORTH
SIDE ELEMENTARY |
116,160.000
KWH |
85,920.000
KWH |
| NORTH
WEST TRANSPORTATION |
120,240.000
KWH |
123,240.000
KWH |
| NORTHEAST
HIGH |
295,864.000
KWH |
336,538.000
KWH |
| NOVA
BLANCHE FORMAN/EISENHOWER ELEM |
272,400.000
KWH |
254,800.000
KWH |
| NOVA
EISENHOWER ELEMENTARY |
9,732.000
KWH |
7,424.000
KWH |
| NOVA
HIGH |
6,679.000
KWH |
7,928.000
KWH |
| NOVA
HIGH - MECH PLANT |
744,000.000
KWH |
620,800.000
KWH |
| NOVA
HIGH COMM/GED |
486.000
KWH |
.000
KWH |
| OAKLAND
PARK ELEM |
182,520.000
KWH |
148,920.000
KWH |
| OAKRIDGE
ELEM |
142,628.000
KWH |
96,243.000
KWH |
| OLSEN
MIDDLE |
183,000.000
KWH |
144,120.000
KWH |
| OLSEN
MIDDLE ANNEX |
117,320.000
KWH |
140,120.000
KWH |
| ORANGEBROOK
ELEM |
347,280.000
KWH |
104,640.000
KWH |
| ORIOLE
ELEM |
108,960.000
KWH |
92,640.000
KWH |
| PALM
COVE ELEM |
108,120.000
KWH |
123,840.000
KWH |
| PALMVIEW
ELEM |
181,440.000
KWH |
128,400.000
KWH |
| PANTHER
RUN ELEM |
94,320.000
KWH |
82,920.000
KWH |
| PARK
LAKES ELEMENTARY |
180,720.000
KWH |
181,680.000
KWH |
| PARK
LAKES ELEMENTARY ANNEX |
43,464.000
KWH |
19,648.000
KWH |
| PARK
RIDGE ELEM |
108,000.000
KWH |
134,760.000
KWH |
| PARK
SPRINGS ELEM |
122,160.000
KWH |
135,840.000
KWH |
| PARK
TRAILS ELEMENTARY |
164,280.000
KWH |
191,520.000
KWH |
| PARKSIDE
ELEMENTARY |
157,680.000
KWH |
162,960.000
KWH |
| PARKWAY
MIDDLE |
375,229.000
KWH |
324,343.000
KWH |
| PASADENA
LAKES ELEM |
192,668.000
KWH |
127,660.000
KWH |
| PEMBROKE
LAKES ELEM |
132,540.000
KWH |
140,160.000
KWH |
| PEMBROKE
PINES ELEM |
120,950.000
KWH |
106,406.000
KWH |
| PERRY
ELEM |
148,654.000
KWH |
159,058.000
KWH |
| PERRY
MIDDLE |
210,480.000
KWH |
111,360.000
KWH |
| PETERS
ELEM |
88,719.000
KWH |
97,302.000
KWH |
| PHYSICAL
PLANT OPERATIONS |
120,240.000
KWH |
121,440.000
KWH |
| PINE
RIDGE CTR |
87,840.000
KWH |
82,080.000
KWH |
| PINES
LAKES ELEM |
164,520.000
KWH |
108,480.000
KWH |
| PINES
MIDDLE |
290,271.000
KWH |
200,008.000
KWH |
| PINEWOOD
ELEM |
119,760.000
KWH |
120,960.000
KWH |
| PIONEER
MIDDLE |
201,074.000
KWH |
190,672.000
KWH |
| PIONEER
MIDDLE ANNEX |
31,740.000
KWH |
31,860.000
KWH |
| PIPER
HIGH |
560,258.000
KWH |
479,252.000
KWH |
| PLANTATION
ELEM |
166,055.000
KWH |
126,962.000
KWH |
| PLANTATION
HIGH |
422,203.000
KWH |
362,503.000
KWH |
| PLANTATION
MIDDLE |
216,576.000
KWH |
209,768.000
KWH |
| PLANTATION
PARK ELEM |
78,071.000
KWH |
66,837.000
KWH |
| POMPANO
BEACH ELEM |
154,680.000
KWH |
118,320.000
KWH |
| POMPANO
BEACH HIGH |
400,255.000
KWH |
337,379.000
KWH |
| POMPANO
BEACH MIDDLE |
256,896.000
KWH |
254,688.000
KWH |
| PPO
ZONE 2 - LEASED |
23,131.000
KWH |
20,917.000
KWH |
| QUIET
WATERS ELEM |
186,060.000
KWH |
136,320.000
KWH |
| RAMBLEWOOD
ELEM |
139,680.000
KWH |
112,080.000
KWH |
| RAMBLEWOOD
MIDDLE |
255,840.000
KWH |
318,960.000
KWH |
| RICKARDS
MIDDLE |
208,500.000
KWH |
193,007.000
KWH |
| RIVERGLADES
ELEM |
96,960.000
KWH |
94,560.000
KWH |
| RIVERLAND
ELEM |
82,440.000
KWH |
74,160.000
KWH |
| RIVERSIDE
ELEM |
140,880.000
KWH |
132,120.000
KWH |
| ROCK
ISLAND ADMIN |
109,992.000
KWH |
100,992.000
KWH |
| ROYAL
PALM ELEMENTARY |
171,350.000
KWH |
160,666.000
KWH |
| SANDERS
PARK ELEM |
101,600.000
KWH |
102,800.000
KWH |
| SANDPIPER
ELEM |
93,960.000
KWH |
151,320.000
KWH |
| SAWGRASS
ELEM |
144,360.000
KWH |
129,480.000
KWH |
| SAWGRASS
SPRINGS MIDDLE |
227,160.000
KWH |
154,680.000
KWH |
| SEA
CASTLE ELEM |
167,040.000
KWH |
168,480.000
KWH |
| SEAGULL
SCHOOL |
124,448.000
KWH |
114,800.000
KWH |
| SEMINOLE
MIDDLE |
201,000.000
KWH |
227,040.000
KWH |
| SHERIDAN
HILLS ELEM |
82,647.000
KWH |
94,374.000
KWH |
| SHERIDAN
PARK ELEM |
126,960.000
KWH |
109,920.000
KWH |
| SHERIDAN
VOCATIONAL |
461,040.000
KWH |
406,560.000
KWH |
| SILVER
LAKES ELEMENTARY |
188,760.000
KWH |
102,600.000
KWH |
| SILVER
LAKES MIDDLE |
202,200.000
KWH |
171,720.000
KWH |
| SILVER
PALMS ELEM |
132,000.000
KWH |
131,640.000
KWH |
| SILVER
RIDGE ELEM |
225,960.000
KWH |
194,640.000
KWH |
| SILVER
SHORES ELEMENTARY |
169,320.000
KWH |
112,320.000
KWH |
| SILVER
TRAIL MIDDLE |
288,480.000
KWH |
218,640.000
KWH |
| SOUTH
AREA BUS PARKING |
44,500.000
KWH |
37,993.000
KWH |
| SOUTH
AREA MAINTENANCE |
30,936.000
KWH |
22,104.000
KWH |
| SOUTH
BROWARD HIGH |
436,093.000
KWH |
517,800.000
KWH |
| SOUTH
PLANTATION HIGH |
494,733.000
KWH |
467,176.000
KWH |
| SOUTH
WEST BUS LOT |
5,066.000
KWH |
3,910.000
KWH |
| STEPHEN
FOSTER ELEM |
137,774.000
KWH |
123,737.000
KWH |
| STIRLING
ELEM |
91,560.000
KWH |
71,280.000
KWH |
| STONEMAN
DOUGLAS HIGH |
463,600.000
KWH |
516,400.000
KWH |
| STRANAHAN
HIGH |
575,487.000
KWH |
402,698.000
KWH |
| SUNLAND
PARK ELEM |
105,120.000
KWH |
107,640.000
KWH |
| SUNRISE
MIDDLE |
218,138.000
KWH |
194,310.000
KWH |
| SUNSET
LAKES ELEMENTARY |
44,280.000
KWH |
79,440.000
KWH |
| SUNSET
SCHOOL |
147,552.000
KWH |
113,352.000
KWH |
| SUNSHINE
ELEMENTARY |
115,622.000
KWH |
99,552.000
KWH |
| TAMARAC
ELEM |
258,510.000
KWH |
139,200.000
KWH |
| TARAVELLA
HIGH |
425,947.000
KWH |
444,382.000
KWH |
| TECHNOLOGY
AND SUPPORT SERVICE |
352,320.000
KWH |
379,440.000
KWH |
| TEDDER
ELEMENTARY SCHOOL |
165,474.000
KWH |
144,323.000
KWH |
| TEQUESTA
TRACE MIDDLE |
217,920.000
KWH |
213,000.000
KWH |
| THE
QUEST CENTER |
110,160.000
KWH |
111,000.000
KWH |
| THURGOOD
MARSHALL ELEM |
94,344.000
KWH |
96,264.000
KWH |
| TRADEWINDS
ELEM |
167,280.000
KWH |
155,640.000
KWH |
| TRANSPORTATION
SERVICES ANNEX |
.000
KWH |
6,360.000
KWH |
| TROPICAL
ELEM |
146,471.000
KWH |
115,257.000
KWH |
| TWIN
LAKES ADMIN |
76,560.000
KWH |
66,720.000
KWH |
| TWIN
LAKES ANNEX/NEW WHSE |
4,284.000
KWH |
3,682.000
KWH |
| TWIN
LAKES COMPLEX |
123,947.000
KWH |
118,540.000
KWH |
| VEHICLE
MAINTENANCE |
109,680.000
KWH |
98,880.000
KWH |
| VILLAGE
ELEM |
121,140.000
KWH |
141,420.000
KWH |
| VIRGINIA
YOUNG ELEM |
87,960.000
KWH |
67,320.000
KWH |
| WALKER
ELEM |
273,380.000
KWH |
198,929.000
KWH |
| WALTER
C YOUNG MIDDLE |
417,636.000
KWH |
471,392.000
KWH |
| WATKINS
ELEM |
156,360.000
KWH |
140,160.000
KWH |
| WELLEBY
ELEM |
98,880.000
KWH |
89,040.000
KWH |
| WEST
BROWARD HIG/LLL |
.000
KWH |
345,600.000
KWH |
| WEST
CENTRAL BUS COMPLEX |
65,962.000
KWH |
77,226.000
KWH |
| WEST
HOLLYWOOD ELEM |
82,680.000
KWH |
85,920.000
KWH |
| WESTCHESTER
ELEMENTARY |
119,530.000
KWH |
96,194.000
KWH |
| WESTERN
HIGH |
465,237.000
KWH |
440,968.000
KWH |
| WESTGLADES
MIDDLE |
229,920.000
KWH |
229,200.000
KWH |
| WESTPINE
MIDDLE |
169,920.000
KWH |
153,960.000
KWH |
| WESTWOOD
HEIGHTS ELEM |
192,167.000
KWH |
163,254.000
KWH |
| WHIDDON-ROGERS
ED CENTER |
140,400.000
KWH |
145,200.000
KWH |
| WHISPERING
PINES |
80,760.000
KWH |
75,000.000
KWH |
| WILLIAM
DANDY MIDDLE |
185,520.000
KWH |
129,240.000
KWH |
| WILTON
MANORS ELEM |
152,640.000
KWH |
145,680.000
KWH |
| WINGATE
OAKS CTR |
131,520.000
KWH |
98,400.000
KWH |
| WINSTON
PARK ELEM |
156,000.000
KWH |
130,800.000
KWH |
|