Utility Savings
Building Name
Jun-08
Jun-09
APOLLO MIDDLE 259,680.000 KWH 231,120.000 KWH
ARTHUR ASHE MIDDLE 289,600.000 KWH 280,400.000 KWH
ATLANTIC VOC CENTER 578,277.000 KWH 542,411.000 KWH
ATLANTIC WEST ELEM 141,000.000 KWH 151,680.000 KWH
ATTUCKS MIDDLE 221,040.000 KWH 225,120.000 KWH
BAIR MIDDLE 178,800.000 KWH 180,240.000 KWH
BANYAN ELEM 110,160.000 KWH 113,040.000 KWH
BAYVIEW ELEM 78,960.000 KWH 76,080.000 KWH
BECON 234,320.000 KWH 268,080.000 KWH
BENNETT ELEM 104,640.000 KWH 78,480.000 KWH
BETHUNE ELEM 208,200.000 KWH 185,400.000 KWH
BOULEVARD HEIGHTS ELEM 149,760.000 KWH 112,680.000 KWH
BOYD ANDERSON HIGH 398,556.000 KWH 464,029.000 KWH
BRIGHT HORIZONS CTR 128,400.000 KWH 113,280.000 KWH
BROADVIEW ELEM 141,991.000 KWH 110,215.000 KWH
BROWARD ESTATES ELEM 149,111.000 KWH 130,266.000 KWH
BROWARD FIRE ACADEMY 33,490.000 KWH 43,451.000 KWH
CASTLE HILL ELEM 125,400.000 KWH 125,940.000 KWH
CENTRAL PARK ELEM 147,960.000 KWH 145,680.000 KWH
CHALLENGER ELEMENTARY 141,240.000 KWH 134,760.000 KWH
CHAPEL TRAIL ELEM 232,093.000 KWH 140,543.000 KWH
CHARLES DREW ELEM 125,400.000 KWH 113,400.000 KWH
COCONUT CREEK ELEM 103,404.000 KWH 93,818.000 KWH
COCONUT CREEK HIGH 360,957.000 KWH 304,560.000 KWH
COCONUT PALM ELEMENTARY 165,720.000 KWH 130,560.000 KWH
COLBERT ELEM 116,400.000 KWH 119,040.000 KWH
COLLINS ELEM 61,680.000 KWH 70,080.000 KWH
COOPER CITY COMM 35,280.000 KWH 23,640.000 KWH
COMMUNITY SCHOOL NORTH .000 KWH 12,621.000 KWH
COMMUNITY SCHOOL SOUTH 7,002.000 KWH 5,644.000 KWH
COOPER CITY ELEM 91,680.000 KWH 106,080.000 KWH
COOPER CITY HIGH 685,753.000 KWH 513,317.000 KWH
CORAL COVE ELEMENTARY 109,920.000 KWH 93,120.000 KWH
CORAL GLADES HIGH 371,280.000 KWH 339,600.000 KWH
CORAL PARK ELEM 114,720.000 KWH 103,680.000 KWH
CORAL SPRINGS ELEM 118,320.000 KWH 101,520.000 KWH
CORAL SPRINGS HIGH 470,607.000 KWH 394,693.000 KWH
CORAL SPRINGS MIDDLE 225,640.000 KWH 207,240.000 KWH
COUNTRY HILLS ELEM 159,600.000 KWH 146,160.000 KWH
COUNTRY ISLES ELEM 166,440.000 KWH 235,320.000 KWH
CRESTHAVEN ELEM 88,560.000 KWH 101,760.000 KWH
CROISSANT PARK ELEM 124,847.000 KWH 124,092.000 KWH
CROSS CREEK 89,520.000 KWH 78,600.000 KWH
CRYSTAL LAKE COMM SCHOOL 11,554.000 KWH 11,889.000 KWH
CRYSTAL LAKE MIDDLE 218,754.000 KWH 200,172.000 KWH
CYPRESS BAY HIGH 518,800.000 KWH 513,200.000 KWH
CYPRESS BAY HIGH ANNEX 60,720.000 KWH 59,520.000 KWH
CYPRESS ELEM 87,120.000 KWH 103,920.000 KWH
CYPRESS RUN ALTERNATIVE 82,507.000 KWH 77,515.000 KWH
DANIA ELEM 113,438.000 KWH 101,149.000 KWH
DAVE THOMAS ED CENTER (WEST) 122,640.000 KWH 96,480.000 KWH
DAVE THOMAS EDUCATION CENTER 49,127.000 KWH 45,686.000 KWH
DAVIE ELEM 114,666.000 KWH 112,677.000 KWH
DEERFIELD BEACH ELEM 131,880.000 KWH 149,390.000 KWH
DEERFIELD BEACH HIGH 324,206.000 KWH 327,950.000 KWH
DEERFIELD BEACH MID 251,354.000 KWH 253,600.000 KWH
DEERFIELD PARK ELEM 96,240.000 KWH 117,960.000 KWH
DILLARD ELEM 123,720.000 KWH 152,040.000 KWH
DILLARD HIGH COMM 7,079.000 KWH .000 KWH
DILLARD HIGH SCHOOL 609,182.000 KWH 639,414.000 KWH
DOLPHIN BAY ELEMENTARY 112,080.000 KWH 101,760.000 KWH
DREW RESOURCE CTR 88,509.000 KWH 81,092.000 KWH
DRIFTWOOD ELEM 102,424.000 KWH 84,662.000 KWH
DRIFTWOOD MIDDLE 403,233.000 KWH 297,414.000 KWH
EAGLE POINT ELEM 217,680.000 KWH 188,040.000 KWH
EAGLE RIDGE ELEM 213,960.000 KWH 188,400.000 KWH
ECIA SPECIAL PROGRAMS 37,218.000 KWH 32,796.000 KWH
EDGEWOOD CENTER 60,616.000 KWH 76,936.000 KWH
ELY HIGH 556,893.000 KWH 549,337.000 KWH
EMBASSY CREEK ELEM 95,880.000 KWH 119,400.000 KWH
ENDEAVOR LEARNING CENTER 90,960.000 KWH 87,240.000 KWH
EVERGLADES ELEMENTARY 217,738.000 KWH 160,679.000 KWH
EVERGLADES HIGH 539,760.000 KWH 430,320.000 KWH
FAIRWAY ELEM 173,400.000 KWH 183,840.000 KWH
FALCON COVE MIDDLE 350,874.000 KWH 300,353.000 KWH
FLAMINGO ELEM 166,528.000 KWH 138,448.000 KWH
FLANAGAN HIGH 506,388.000 KWH 481,876.000 KWH
FLORANADA ELEM 109,056.000 KWH 102,096.000 KWH
FOREST GLEN MIDDLE 227,536.000 KWH 201,565.000 KWH
FOREST HILLS ELEM 130,320.000 KWH 119,760.000 KWH
FORT LAUDERDALE HIGH 528,527.000 KWH 456,439.000 KWH
FOX TRAIL ELEMENTARY 167,760.000 KWH 148,920.000 KWH
GATOR RUN ELEMENTARY 256,560.000 KWH 174,720.000 KWH
GLADES MIDDLE 325,600.000 KWH 233,200.000 KWH
GRIFFIN ELEM 94,560.000 KWH 89,400.000 KWH
GULFSTREAM MIDDLE SCHOOL 88,200.000 KWH 94,440.000 KWH
HALLANDALE ADULT CENTER 192,319.000 KWH 175,002.000 KWH
HALLANDALE ELEM 171,360.000 KWH 168,720.000 KWH
HALLANDALE HIGH 278,672.000 KWH 223,241.000 KWH
HARBORDALE ELEM 93,408.000 KWH 61,968.000 KWH
HAWKES BLUFF ELEM 137,293.000 KWH 129,123.000 KWH
HOLLYWOOD CENTRAL AUDITORIUM 47,160.000 KWH 45,600.000 KWH
HOLLYWOOD CENTRAL ELEM 82,680.000 KWH 79,680.000 KWH
HOLLYWOOD HILLS COMMUNITY 4,232.000 KWH 3,351.000 KWH
HOLLYWOOD HILLS ELEMENTARY 166,560.000 KWH 219,000.000 KWH
HOLLYWOOD HILLS HIGH 342,486.000 KWH 324,175.000 KWH
HOLLYWOOD PARK ELEM 96,480.000 KWH 77,520.000 KWH
HORIZON ELEM 112,320.000 KWH 83,520.000 KWH
HORTT ADMIN SITE 77,507.000 KWH 55,265.000 KWH
INDIAN RIDGE MIDDLE 312,795.000 KWH 262,879.000 KWH
INDIAN TRACE ELEM 128,040.000 KWH 95,760.000 KWH
JAMES HUNT ELEMENTARY 132,480.000 KWH 107,760.000 KWH
KATHLEEN WRIGHT ADMIN 447,416.000 KWH 406,393.000 KWH
LAKE FOREST ELEM 186,000.000 KWH 158,880.000 KWH
LAKESIDE ELEMENTARY 123,840.000 KWH 92,160.000 KWH
LANIER JAMES CENTER 60,000.000 KWH 65,280.000 KWH
LARKDALE ELEM 132,011.000 KWH 139,585.000 KWH
LAUDERDALE LAKES MIDDLE 156,680.000 KWH 149,410.000 KWH
LAUDERDALE MANORS ELEM 227,280.000 KWH 198,600.000 KWH
LAUDERHILL MIDDLE 168,840.000 KWH 145,560.000 KWH
LAUDERHILL MIDDLE/COMM 4,402.000 KWH 6,186.000 KWH
LAUDERHILL PT ELEM 154,800.000 KWH 108,960.000 KWH
LIBERTY ELEMENTARY 156,720.000 KWH 149,040.000 KWH
LLOYD ESTATES ELEM 119,520.000 KWH 103,320.000 KWH
LOCKHART STADIUM 77,631.000 KWH 72,444.000 KWH
LYONS CREEK MIDDLE 320,160.000 KWH 332,640.000 KWH
MANATEE BAY ELEMENTARY 187,632.000 KWH 157,390.000 KWH
MAPLEWOOD ELEM 119,760.000 KWH 106,200.000 KWH
MARGATE ELEM 196,800.000 KWH 155,760.000 KWH
MARGATE MIDDLE 236,700.000 KWH 197,725.000 KWH
MARKHAM ELEM 136,527.000 KWH 156,341.000 KWH
MARTIN LUTHER KING ELEM 142,283.000 KWH 165,020.000 KWH
MCARTHUR HIGH 477,106.000 KWH 407,388.000 KWH
MCFATTER VO TECH 343,920.000 KWH 358,080.000 KWH
MCNAB ELEMENTARY 124,800.000 KWH 116,760.000 KWH
MCNICOL MIDDLE 297,360.000 KWH 276,720.000 KWH
MEADOWBROOK ELEM 112,706.000 KWH 139,200.000 KWH
MILLENNIUM MIDDLE 288,480.000 KWH 307,200.000 KWH
MIRAMAR ELEM 144,000.000 KWH 109,320.000 KWH
MIRAMAR HIGH 534,156.000 KWH 413,719.000 KWH
MIRROR LAKE ELEM 90,240.000 KWH 83,040.000 KWH
MONARCH HIGH 402,000.000 KWH 314,400.000 KWH
MORROW ELEM 122,520.000 KWH 113,760.000 KWH
MULTICULTURAL CENTER 17,640.000 KWH 11,520.000 KWH
N ANDREWS GARDENS ELEM 180,624.000 KWH 186,744.000 KWH
NEW RENAISSANCE MIDDLE 199,047.000 KWH 196,938.000 KWH
NEW RIVER MIDDLE SCHOOL 177,024.000 KWH 86,484.000 KWH
NOB HILL ELEM 214,080.000 KWH 192,240.000 KWH
NORCREST ELEM 93,960.000 KWH 98,040.000 KWH
NORTH AREA MAINT/WHSE 141,166.000 KWH 144,307.000 KWH
NORTH AREA SUPERINTENDENT 40,140.000 KWH 34,740.000 KWH
NORTH BUS PARKING LOT 83,968.000 KWH 78,675.000 KWH
NORTH CENTRAL SUPERINTENDENT 103,860.000 KWH 84,180.000 KWH
NORTH FORK ELEM 164,880.000 KWH 141,840.000 KWH
NORTH LAUDERDALE ELEM 116,880.000 KWH 122,880.000 KWH
NORTH SIDE ELEMENTARY 141,600.000 KWH 117,720.000 KWH
NORTHEAST HIGH 373,621.000 KWH 297,937.000 KWH
NOVA BLANCHE FORMAN/EISENHOWER ELEM 309,600.000 KWH 230,400.000 KWH
NOVA EISENHOWER ELEMENTARY 10,437.000 KWH 10,181.000 KWH
NOVA HIGH 7,833.000 KWH 36,693.000 KWH
NOVA HIGH - MECH PLANT 638,400.000 KWH 704,000.000 KWH
OAKLAND PARK ELEM 146,400.000 KWH 97,920.000 KWH
OAKRIDGE ELEM 102,124.000 KWH 108,375.000 KWH
OLSEN MIDDLE 139,800.000 KWH 176,880.000 KWH
OLSEN MIDDLE ANNEX 154,760.000 KWH 144,680.000 KWH
ORANGEBROOK ELEM 106,320.000 KWH 100,560.000 KWH
ORIOLE ELEM 89,520.000 KWH 90,720.000 KWH
PALM COVE ELEM 139,560.000 KWH 117,480.000 KWH
PALMVIEW ELEM 127,440.000 KWH 117,600.000 KWH
PANTHER RUN ELEM 92,520.000 KWH 89,760.000 KWH
PARK LAKES ELEMENTARY 180,000.000 KWH 165,600.000 KWH
PARK LAKES ELEMENTARY ANNEX 23,128.000 KWH 4,768.000 KWH
PARK RIDGE ELEM 100,440.000 KWH 107,640.000 KWH
PARK SPRINGS ELEM 145,680.000 KWH 135,360.000 KWH
PARK TRAILS ELEMENTARY 182,280.000 KWH 184,080.000 KWH
PARKSIDE ELEMENTARY 169,680.000 KWH 153,840.000 KWH
PARKWAY MIDDLE 349,134.000 KWH 363,248.000 KWH
PASADENA LAKES ELEM 169,881.000 KWH 152,728.000 KWH
PEMBROKE LAKES ELEM 139,680.000 KWH 85,200.000 KWH
PEMBROKE PINES ELEM 91,343.000 KWH 96,708.000 KWH
PERRY ELEM 154,097.000 KWH 131,870.000 KWH
PERRY MIDDLE 229,920.000 KWH 153,360.000 KWH
PETERS ELEM 115,402.000 KWH 113,519.000 KWH
PHYSICAL PLANT OPERATIONS 123,930.000 KWH 108,510.000 KWH
PINE RIDGE CTR 88,560.000 KWH 72,000.000 KWH
PINES LAKES ELEM 141,120.000 KWH 150,480.000 KWH
PINES MIDDLE 235,528.000 KWH 238,648.000 KWH
PINEWOOD ELEM 118,200.000 KWH 109,440.000 KWH
PIONEER MIDDLE 227,570.000 KWH 191,770.000 KWH
PIONEER MIDDLE ANNEX 44,040.000 KWH 35,700.000 KWH
PIPER HIGH 471,371.000 KWH 444,950.000 KWH
PLANTATION ELEM 118,399.000 KWH 111,686.000 KWH
PLANTATION HIGH 420,702.000 KWH 383,747.000 KWH
PLANTATION MIDDLE 207,772.000 KWH 196,456.000 KWH
PLANTATION PARK ELEM 82,313.000 KWH 79,888.000 KWH
POMPANO BEACH ELEM 171,840.000 KWH 96,240.000 KWH
POMPANO BEACH HIGH 301,062.000 KWH 265,323.000 KWH
POMPANO BEACH MIDDLE 253,368.000 KWH 233,088.000 KWH
PPO ZONE 2 - LEASED 142,043.000 KWH 109,334.000 KWH
QUIET WATERS ELEM 24,003.000 KWH 22,741.000 KWH
RAMBLEWOOD ELEM 139,020.000 KWH 193,440.000 KWH
RAMBLEWOOD MIDDLE 139,200.000 KWH 118,560.000 KWH
RICKARDS MIDDLE 308,880.000 KWH 265,991.000 KWH
RIVERGLADES ELEM 207,991.000 KWH 182,803.000 KWH
RIVERLAND ELEM 108,000.000 KWH 99,000.000 KWH
RIVERSIDE ELEM 92,280.000 KWH 98,400.000 KWH
ROCK ISLAND ADMIN 137,280.000 KWH 139,440.000 KWH
ROYAL PALM ELEMENTARY 113,952.000 KWH 85,992.000 KWH
SAFETY DEPARTMENT 173,540.000 KWH 167,985.000 KWH
SANDERS PARK ELEM 124,000.000 KWH 117,600.000 KWH
SANDPIPER ELEM 157,320.000 KWH 157,800.000 KWH
SAWGRASS ELEM 166,200.000 KWH 151,080.000 KWH
SAWGRASS SPRINGS MIDDLE 190,440.000 KWH 190,920.000 KWH
SEA CASTLE ELEM 181,440.000 KWH 180,000.000 KWH
SEAGULL SCHOOL 132,620.000 KWH 111,399.000 KWH
SEMINOLE MIDDLE 228,120.000 KWH 216,840.000 KWH
SHERIDAN HILLS ELEM 92,851.000 KWH 78,875.000 KWH
SHERIDAN PARK ELEM 128,400.000 KWH 117,120.000 KWH
SHERIDAN VOCATIONAL 385,680.000 KWH 314,640.000 KWH
SILVER LAKES ELEMENTARY 116,280.000 KWH 96,600.000 KWH
SILVER LAKES MIDDLE 190,080.000 KWH 160,920.000 KWH
SILVER PALMS ELEM 122,160.000 KWH 138,600.000 KWH
SILVER RIDGE ELEM 213,000.000 KWH 201,840.000 KWH
SILVER SHORES ELEMENTARY 127,440.000 KWH 116,760.000 KWH
SILVER TRAIL MIDDLE 239,760.000 KWH 226,560.000 KWH
SOUTH AREA BUS PARKING 44,159.000 KWH 41,707.000 KWH
SOUTH AREA MAINTENANCE 21,514.000 KWH 21,018.000 KWH
SOUTH BROWARD HIGH 461,460.000 KWH 396,900.000 KWH
SOUTH PLANTATION HIGH 503,940.000 KWH 403,034.000 KWH
SOUTH WEST BUS LOT 2,982.000 KWH 47,978.000 KWH
STEPHEN FOSTER ELEM 116,716.000 KWH 82,593.000 KWH
STIRLING ELEM 100,560.000 KWH 91,920.000 KWH
STONEMAN DOUGLAS HIGH 523,200.000 KWH 484,800.000 KWH
STRANAHAN HIGH 416,500.000 KWH 415,056.000 KWH
SUNLAND PARK ELEM 111,960.000 KWH 82,440.000 KWH
SUNRISE MIDDLE 194,992.000 KWH 194,453.000 KWH
SUNSET LAKES ELEMENTARY 95,880.000 KWH 96,840.000 KWH
SUNSET SCHOOL 100,152.000 KWH 85,872.000 KWH
SUNSHINE ELEMENTARY 78,137.000 KWH 83,522.000 KWH
TAMARAC ELEM 166,320.000 KWH 166,080.000 KWH
TARAVELLA HIGH 474,707.000 KWH 395,024.000 KWH
TECHNOLOGY AND SUPPORT SERVICE 370,560.000 KWH 351,120.000 KWH
TEDDER ELEMENTARY SCHOOL 142,407.000 KWH 127,514.000 KWH
TEQUESTA TRACE MIDDLE 229,200.000 KWH 216,480.000 KWH
THE QUEST CENTER 126,960.000 KWH 93,000.000 KWH
THURGOOD MARSHALL ELEM 124,224.000 KWH 102,264.000 KWH
TRADEWINDS ELEM 190,200.000 KWH 209,760.000 KWH
TRANSPORTATION SERVICE ANNEX .000 KWH 9,120.000 KWH
TROPICAL ELEM 92,908.000 KWH 130,661.000 KWH
TWIN LAKES ADMIN 68,160.000 KWH 69,840.000 KWH
TWIN LAKES ANNEX/NEW WHSE 3,107.000 KWH 2,267.000 KWH
TWIN LAKES COMPLEX 124,098.000 KWH 111,946.000 KWH
VEHICLE MAINTENANCE 102,720.000 KWH 82,800.000 KWH
VILLAGE ELEM 182,520.000 KWH 159,120.000 KWH
VIRGINIA YOUNG ELEM 94,200.000 KWH 75,960.000 KWH
WALKER ELEM 230,005.000 KWH 230,577.000 KWH
WALTER C YOUNG MIDDLE 462,716.000 KWH 414,244.000 KWH
WATKINS ELEM 140,880.000 KWH 119,400.000 KWH
WELLEBY ELEM 108,960.000 KWH 95,040.000 KWH
WEST BROWARD HIG/LLL 229,600.000 KWH 372,800.000 KWH
WEST CENTRAL BUS COMPLEX 70,575.000 KWH 63,642.000 KWH
WEST HOLLYWOOD ELEM 154,440.000 KWH 97,560.000 KWH
WESTCHESTER ELEMENTARY 138,877.000 KWH 138,079.000 KWH
WESTERN HIGH 414,836.000 KWH 502,845.000 KWH
WESTGLADES MIDDLE 237,120.000 KWH 281,280.000 KWH
WESTPINE MIDDLE 165,000.000 KWH 146,280.000 KWH
WESTWOOD HEIGHTS ELEM 153,405.000 KWH 138,199.000 KWH
WHIDDON-ROGERS ED CENTER 176,000.000 KWH 161,200.000 KWH
WHISPERING PINES 76,800.000 KWH 78,240.000 KWH
WILLIAM DANDY MIDDLE 161,040.000 KWH 154,800.000 KWH
WILTON MANORS ELEM 163,740.000 KWH 106,320.000 KWH
WINGATE OAKS CTR 112,920.000 KWH 96,000.000 KWH
WINSTON PARK ELEM 174,480.000 KWH 156,720.000 KWH