Utility Savings
Building Name
Mar-08
Mar-09
APOLLO MIDDLE 207,600.000 KWH 190,800.000 KWH
ARTHUR ASHE MIDDLE 320,800.000 KWH 277,200.000 KWH
ATLANTIC VOC CENTER 508,427.000 KWH 468,072.000 KWH
ATLANTIC WEST ELEM 158,040.000 KWH 125,160.000 KWH
ATTUCKS MIDDLE 212,512.000 KWH 228,480.000 KWH
BAIR MIDDLE 179,520.000 KWH 177,840.000 KWH
BANYAN ELEM 132,720.000 KWH 127,440.000 KWH
BAYVIEW ELEM 69,240.000 KWH 76,560.000 KWH
BECON 254,440.000 KWH 234,400.000 KWH
BENNETT ELEM 74,400.000 KWH 90,240.000 KWH
BETHUNE ELEM 164,880.000 KWH 169,680.000 KWH
BOULEVARD HEIGHTS ELEM 100,680.000 KWH 111,600.000 KWH
BOYD ANDERSON HIGH 399,032.000 KWH 379,581.000 KWH
BRIGHT HORIZONS CTR 91,440.000 KWH 90,480.000 KWH
BROADVIEW ELEM 108,950.000 KWH 113,146.000 KWH
BROWARD EDUCATION FOUNDATION 1,169.000 KWH .000 KWH
BROWARD ESTATES ELEM 120,388.000 KWH 89,651.000 KWH
BROWARD FIRE ACADEMY 27,960.000 KWH 28,659.000 KWH
CASTLE HILL ELEM 120,840.000 KWH 131,400.000 KWH
CENTRAL PARK ELEM 150,720.000 KWH 134,280.000 KWH
CHALLENGER ELEMENTARY 126,120.000 KWH 154,200.000 KWH
CHAPEL TRAIL ELEM 171,820.000 KWH 163,827.000 KWH
CHARLES DREW ELEM 112,080.000 KWH 106,320.000 KWH
COCONUT CREEK ELEM 96,610.000 KWH 96,857.000 KWH
COCONUT CREEK HIGH 351,220.000 KWH 316,387.000 KWH
COCONUT PALM ELEMENTARY 144,360.000 KWH 126,360.000 KWH
COLBERT ELEM 129,360.000 KWH 91,680.000 KWH
COLLINS ELEM 72,000.000 KWH 59,040.000 KWH
COOPER CITY COMM 23,160.000 KWH 18,600.000 KWH
COMMUNITY SCHOOL NORTH .000 KWH 8,718.000 KWH
COMMUNITY SCHOOL SOUTH 4,667.000 KWH 5,552.000 KWH
COOPER CITY ELEM 116,400.000 KWH 107,520.000 KWH
COOPER CITY HIGH 537,561.000 KWH 450,605.000 KWH
CORAL COVE ELEMENTARY 116,400.000 KWH 105,600.000 KWH
CORAL GLADES HIGH 456,960.000 KWH 348,720.000 KWH
CORAL PARK ELEM 112,080.000 KWH 112,560.000 KWH
CORAL SPRINGS ELEM 116,400.000 KWH 113,040.000 KWH
CORAL SPRINGS HIGH 410,431.000 KWH 417,413.000 KWH
CORAL SPRINGS MIDDLE 206,871.000 KWH 202,840.000 KWH
COUNTRY HILLS ELEM 143,280.000 KWH 142,200.000 KWH
COUNTRY ISLES ELEM 161,040.000 KWH 165,600.000 KWH
CRESTHAVEN ELEM 90,600.000 KWH 102,600.000 KWH
CROISSANT PARK ELEM 124,483.000 KWH 108,292.000 KWH
CROSS CREEK 75,420.000 KWH 73,320.000 KWH
CRYSTAL LAKE COMM SCHOOL 6,635.000 KWH 7,050.000 KWH
CRYSTAL LAKE MIDDLE 185,277.000 KWH 191,756.000 KWH
CYPRESS BAY HIGH 488,800.000 KWH 537,600.000 KWH
CYPRESS BAY HIGH ANNEX 47,280.000 KWH 56,880.000 KWH
CYPRESS ELEM 82,320.000 KWH 90,720.000 KWH
CYPRESS RUN ALTERNATIVE 45,603.000 KWH 63,514.000 KWH
DANIA ELEM 104,610.000 KWH 115,478.000 KWH
DAVE THOMAS ED CENTER (WEST) 103,200.000 KWH 57,120.000 KWH
DAVE THOMAS EDUCATION CENTER 38,067.000 KWH 35,370.000 KWH
DAVIE ELEM 167,705.000 KWH 114,456.000 KWH
DEERFIELD BEACH ELEM 125,880.000 KWH 143,528.000 KWH
DEERFIELD BEACH HIGH 339,358.000 KWH 349,702.000 KWH
DEERFIELD BEACH MID 231,847.000 KWH 227,718.000 KWH
DEERFIELD PARK ELEM 99,360.000 KWH 109,800.000 KWH
DILLARD ELEM 123,720.000 KWH 123,480.000 KWH
DILLARD HIGH COMM 4,677.000 KWH .000 KWH
DILLARD HIGH SCHOOL 767,873.000 KWH 684,726.000 KWH
DOLPHIN BAY ELEMENTARY 116,880.000 KWH 100,560.000 KWH
DREW RESOURCE CTR 74,950.000 KWH 52,833.000 KWH
DRIFTWOOD ELEM 99,627.000 KWH 81,114.000 KWH
DRIFTWOOD MIDDLE 384,298.000 KWH 312,056.000 KWH
EAGLE POINT ELEM 215,880.000 KWH 194,400.000 KWH
EAGLE RIDGE ELEM 157,320.000 KWH 141,000.000 KWH
ECIA SPECIAL PROGRAMS 20,289.000 KWH 25,151.000 KWH
EDGEWOOD CENTER 42,256.000 KWH 42,736.000 KWH
ELY HIGH 583,917.000 KWH 644,600.000 KWH
EMBASSY CREEK ELEM 94,320.000 KWH 115,680.000 KWH
ENDEAVOR LEARNING CENTER 84,480.000 KWH 79,800.000 KWH
EVERGLADES ELEMENTARY 181,335.000 KWH 149,385.000 KWH
EVERGLADES HIGH 512,040.000 KWH 479,160.000 KWH
FAIRWAY ELEM 223,800.000 KWH 90,000.000 KWH
FALCON COVE MIDDLE 385,637.000 KWH 317,587.000 KWH
FLAMINGO ELEM 151,168.000 KWH 113,728.000 KWH
FLANAGAN HIGH 494,546.000 KWH 437,406.000 KWH
FLORANADA ELEM 116,496.000 KWH 115,296.000 KWH
FOREST GLEN MIDDLE 202,825.000 KWH 181,014.000 KWH
FOREST HILLS ELEM 111,480.000 KWH 113,280.000 KWH
FORT LAUDERDALE HIGH 495,106.000 KWH 452,007.000 KWH
FOX TRAIL ELEMENTARY 155,760.000 KWH 134,640.000 KWH
GATOR RUN ELEMENTARY 222,240.000 KWH 176,400.000 KWH
GLADES MIDDLE 261,600.000 KWH 246,000.000 KWH
GRIFFIN ELEM 107,280.000 KWH 109,680.000 KWH
GULFSTREAM MIDDLE SCHOOL 75,360.000 KWH 75,240.000 KWH
HALLANDALE ADULT CENTER 152,069.000 KWH 147,487.000 KWH
HALLANDALE ELEM 169,920.000 KWH 128,880.000 KWH
HALLANDALE HIGH 261,266.000 KWH 302,101.000 KWH
HARBORDALE ELEM 75,648.000 KWH 72,528.000 KWH
HAWKES BLUFF ELEM 147,608.000 KWH 155,284.000 KWH
HOLLYWOOD CENTRAL AUDITORIUM 34,080.000 KWH 31,500.000 KWH
HOLLYWOOD CENTRAL ELEM 89,280.000 KWH 90,000.000 KWH
HOLLYWOOD HILLS COMMUNITY 1,914.000 KWH 2,596.000 KWH
HOLLYWOOD HILLS ELEMENTARY 135,000.000 KWH 135,240.000 KWH
HOLLYWOOD HILLS HIGH 331,178.000 KWH 358,873.000 KWH
HOLLYWOOD PARK ELEM 98,400.000 KWH 75,120.000 KWH
HORIZON ELEM 119,400.000 KWH 96,480.000 KWH
HORTT ADMIN SITE 52,240.000 KWH 46,513.000 KWH
INDIAN RIDGE MIDDLE 277,877.000 KWH 265,594.000 KWH
INDIAN TRACE ELEM 120,000.000 KWH 117,840.000 KWH
JAMES HUNT ELEMENTARY 147,600.000 KWH 101,760.000 KWH
KATHLEEN WRIGHT ADMIN 409,182.000 KWH 379,759.000 KWH
LAKE FOREST ELEM 194,880.000 KWH 113,400.000 KWH
LAKESIDE ELEMENTARY 128,640.000 KWH 102,720.000 KWH
LANIER JAMES CENTER 54,480.000 KWH 59,040.000 KWH
LARKDALE ELEM 104,955.000 KWH 82,060.000 KWH
LAUDERDALE LAKES MIDDLE 141,360.000 KWH 157,857.000 KWH
LAUDERDALE MANORS ELEM 203,160.000 KWH 181,200.000 KWH
LAUDERHILL MIDDLE 142,920.000 KWH 146,640.000 KWH
LAUDERHILL MIDDLE/COMM 2,934.000 KWH 4,253.000 KWH
LAUDERHILL PT ELEM 122,640.000 KWH 134,880.000 KWH
LIBERTY ELEMENTARY 143,520.000 KWH 143,760.000 KWH
LLOYD ESTATES ELEM 91,200.000 KWH 110,720.000 KWH
LOCKHART STADIUM 51,144.000 KWH 39,209.000 KWH
LYONS CREEK MIDDLE 298,560.000 KWH 312,480.000 KWH
MANATEE BAY ELEMENTARY 159,899.000 KWH 146,016.000 KWH
MAPLEWOOD ELEM 125,520.000 KWH 123,240.000 KWH
MARGATE ELEM 165,420.000 KWH 142,320.000 KWH
MARGATE MIDDLE 241,880.000 KWH 200,421.000 KWH
MARKHAM ELEM 129,139.000 KWH 111,654.000 KWH
MARTIN LUTHER KING ELEM 135,968.000 KWH 117,583.000 KWH
MCARTHUR HIGH 453,916.000 KWH 407,635.000 KWH
MCFATTER VO TECH 344,160.000 KWH 318,000.000 KWH
MCNAB ELEMENTARY 139,200.000 KWH 125,908.000 KWH
MCNICOL MIDDLE 276,000.000 KWH 223,440.000 KWH
MEADOWBROOK ELEM 84,492.000 KWH 72,240.000 KWH
MILLENNIUM MIDDLE 269,040.000 KWH 268,800.000 KWH
MIRAMAR ELEM 138,720.000 KWH 112,320.000 KWH
MIRAMAR HIGH 482,658.000 KWH 360,508.000 KWH
MIRROR LAKE ELEM 90,720.000 KWH 82,080.000 KWH
MONARCH HIGH 350,400.000 KWH 327,600.000 KWH
MORROW ELEM 120,600.000 KWH 103,560.000 KWH
MULTICULTURAL CENTER 13,200.000 KWH 11,160.000 KWH
N ANDREWS GARDENS ELEM 169,344.000 KWH 164,064.000 KWH
NEW RENAISSANCE MIDDLE 215,154.000 KWH 224,268.000 KWH
NEW RIVER MIDDLE SCHOOL 120,504.000 KWH 37,764.000 KWH
NOB HILL ELEM 242,760.000 KWH 206,760.000 KWH
NORCREST ELEM 109,920.000 KWH 100,440.000 KWH
NORTH AREA MAINT/WHSE 114,347.000 KWH 180,714.000 KWH
NORTH AREA SUPERINTENDENT 30,720.000 KWH 30,840.000 KWH
NORTH BUS PARKING LOT 72,946.000 KWH 65,947.000 KWH
NORTH CENTRAL SUPERINTENDENT 91,740.000 KWH 80,820.000 KWH
NORTH FORK ELEM 113,160.000 KWH 98,040.000 KWH
NORTH LAUDERDALE ELEM 108,480.000 KWH 93,600.000 KWH
NORTH SIDE ELEMENTARY 115,560.000 KWH 98,160.000 KWH
NORTHEAST HIGH 348,809.000 KWH 313,568.000 KWH
NOVA BLANCHE FORMAN/EISENHOWER ELEM 268,000.000 KWH 199,200.000 KWH
NOVA EISENHOWER ELEMENTARY 9,356.000 KWH 7,339.000 KWH
NOVA HIGH 10,047.000 KWH 29,363.000 KWH
NOVA HIGH - MECH PLANT 536,000.000 KWH 598,400.000 KWH
NOVA HIGH COMM/GED 8.000 KWH .000 KWH
OAKLAND PARK ELEM 131,400.000 KWH 119,880.000 KWH
OAKRIDGE ELEM 110,539.000 KWH 120,980.000 KWH
OLSEN MIDDLE 149,160.000 KWH 163,680.000 KWH
OLSEN MIDDLE ANNEX 92,600.000 KWH 98,840.000 KWH
ORANGEBROOK ELEM 138,000.000 KWH 107,520.000 KWH
ORIOLE ELEM 85,920.000 KWH 100,560.000 KWH
PALM COVE ELEM 140,280.000 KWH 138,240.000 KWH
PALMVIEW ELEM 124,920.000 KWH 101,880.000 KWH
PANTHER RUN ELEM 116,400.000 KWH 95,760.000 KWH
PARK LAKES ELEMENTARY 161,520.000 KWH 169,200.000 KWH
PARK LAKES ELEMENTARY ANNEX 20,544.000 KWH 11,968.000 KWH
PARK RIDGE ELEM 86,760.000 KWH 82,080.000 KWH
PARK SPRINGS ELEM 147,120.000 KWH 140,160.000 KWH
PARK TRAILS ELEMENTARY 170,280.000 KWH 151,920.000 KWH
PARKSIDE ELEMENTARY 142,800.000 KWH 136,080.000 KWH
PARKWAY MIDDLE 322,197.000 KWH 332,213.000 KWH
PASADENA LAKES ELEM 153,988.000 KWH 121,361.000 KWH
PEMBROKE LAKES ELEM 108,720.000 KWH 103,020.000 KWH
PEMBROKE PINES ELEM 97,071.000 KWH 128,010.000 KWH
PERRY ELEM 140,146.000 KWH 78,004.000 KWH
PERRY MIDDLE 176,880.000 KWH 166,800.000 KWH
PETERS ELEM 99,644.000 KWH 106,536.000 KWH
PHYSICAL PLANT OPERATIONS 92,251.000 KWH 95,572.000 KWH
PINE RIDGE CTR 70,080.000 KWH 76,560.000 KWH
PINES LAKES ELEM 147,000.000 KWH 128,760.000 KWH
PINES MIDDLE 222,088.000 KWH 231,208.000 KWH
PINEWOOD ELEM 115,200.000 KWH 114,240.000 KWH
PIONEER MIDDLE 205,219.000 KWH 189,519.000 KWH
PIONEER MIDDLE ANNEX 33,600.000 KWH 30,360.000 KWH
PIPER HIGH 414,552.000 KWH 430,218.000 KWH
PLANTATION ELEM 134,814.000 KWH 128,760.000 KWH
PLANTATION HIGH 424,760.000 KWH 366,785.000 KWH
PLANTATION MIDDLE 204,045.000 KWH 175,758.000 KWH
PLANTATION PARK ELEM 93,744.000 KWH 78,602.000 KWH
POMPANO BEACH ELEM 110,880.000 KWH 124,920.000 KWH
POMPANO BEACH HIGH 270,945.000 KWH 281,790.000 KWH
POMPANO BEACH MIDDLE 198,168.000 KWH 195,648.000 KWH
PPO ZONE 2 - LEASED 131,814.000 KWH 48,046.000 KWH
QUIET WATERS ELEM 24,151.000 KWH 22,195.000 KWH
RAMBLEWOOD ELEM 125,520.000 KWH 94,500.000 KWH
RAMBLEWOOD MIDDLE 134,640.000 KWH 115,200.000 KWH
RICKARDS MIDDLE 289,200.000 KWH 222,286.000 KWH
RIVERGLADES ELEM 172,602.000 KWH 169,322.000 KWH
RIVERLAND ELEM 101,640.000 KWH 101,160.000 KWH
RIVERSIDE ELEM 95,280.000 KWH 108,960.000 KWH
ROCK ISLAND ADMIN 127,440.000 KWH 136,440.000 KWH
ROYAL PALM ELEMENTARY 67,992.000 KWH 55,632.000 KWH
SAFETY DEPARTMENT 143,125.000 KWH 152,881.000 KWH
SANDERS PARK ELEM 89,200.000 KWH 96,800.000 KWH
SANDPIPER ELEM 154,320.000 KWH 146,160.000 KWH
SAWGRASS ELEM 152,040.000 KWH 139,440.000 KWH
SAWGRASS SPRINGS MIDDLE 216,960.000 KWH 178,800.000 KWH
SEA CASTLE ELEM 164,880.000 KWH 159,840.000 KWH
SEAGULL SCHOOL 104,141.000 KWH 90,842.000 KWH
SEMINOLE MIDDLE 187,320.000 KWH 196,440.000 KWH
SHERIDAN HILLS ELEM 88,348.000 KWH 87,510.000 KWH
SHERIDAN PARK ELEM 123,120.000 KWH 103,440.000 KWH
SHERIDAN VOCATIONAL 326,880.000 KWH 296,640.000 KWH
SILVER LAKES ELEMENTARY 111,000.000 KWH 106,440.000 KWH
SILVER LAKES MIDDLE 197,160.000 KWH 136,200.000 KWH
SILVER PALMS ELEM 145,680.000 KWH 165,000.000 KWH
SILVER RIDGE ELEM 193,320.000 KWH 173,040.000 KWH
SILVER SHORES ELEMENTARY 122,760.000 KWH 121,560.000 KWH
SILVER TRAIL MIDDLE 246,240.000 KWH 234,720.000 KWH
SOUTH AREA BUS PARKING 34,264.000 KWH 34,270.000 KWH
SOUTH AREA MAINTENANCE 17,729.000 KWH 17,765.000 KWH
SOUTH BROWARD HIGH 389,051.000 KWH 392,220.000 KWH
SOUTH PLANTATION HIGH 514,037.000 KWH 375,577.000 KWH
SOUTH WEST BUS LOT 682.000 KWH 17,564.000 KWH
STEPHEN FOSTER ELEM 110,909.000 KWH 113,565.000 KWH
STIRLING ELEM 83,280.000 KWH 93,240.000 KWH
STONEMAN DOUGLAS HIGH 472,000.000 KWH 515,200.000 KWH
STRANAHAN HIGH 429,166.000 KWH 362,367.000 KWH
SUNLAND PARK ELEM 103,800.000 KWH 99,360.000 KWH
SUNRISE MIDDLE 201,516.000 KWH 206,347.000 KWH
SUNSET LAKES ELEMENTARY 102,960.000 KWH 139,680.000 KWH
SUNSET SCHOOL 93,312.000 KWH 100,152.000 KWH
SUNSHINE ELEMENTARY 88,719.000 KWH 104,442.000 KWH
TAMARAC ELEM 150,000.000 KWH 149,760.000 KWH
TARAVELLA HIGH 446,334.000 KWH 419,198.000 KWH
TECHNOLOGY AND SUPPORT SERVICE 350,880.000 KWH 336,240.000 KWH
TEDDER ELEMENTARY SCHOOL 126,951.000 KWH 125,648.000 KWH
TEQUESTA TRACE MIDDLE 225,600.000 KWH 205,800.000 KWH
THE QUEST CENTER 97,680.000 KWH 96,600.000 KWH
THURGOOD MARSHALL ELEM 118,584.000 KWH 114,024.000 KWH
TRADEWINDS ELEM 183,360.000 KWH 185,040.000 KWH
TRANSPORTATION SERVICE ANNEX .000 KWH 5,040.000 KWH
TROPICAL ELEM 90,898.000 KWH 108,609.000 KWH
TWIN LAKES ADMIN 53,040.000 KWH 60,720.000 KWH
TWIN LAKES ANNEX/NEW WHSE 2,589.000 KWH 2,518.000 KWH
TWIN LAKES COMPLEX 99,758.000 KWH 94,965.000 KWH
VEHICLE MAINTENANCE 78,000.000 KWH 81,840.000 KWH
VILLAGE ELEM 162,180.000 KWH 177,000.000 KWH
VIRGINIA YOUNG ELEM 93,480.000 KWH 93,480.000 KWH
WALKER ELEM 233,899.000 KWH 182,121.000 KWH
WALTER C YOUNG MIDDLE 416,669.000 KWH 371,835.000 KWH
WATKINS ELEM 135,840.000 KWH 98,280.000 KWH
WELLEBY ELEM 97,800.000 KWH 108,720.000 KWH
WEST BROWARD HIG/LLL .000 KWH 312,800.000 KWH
WEST CENTRAL BUS COMPLEX 67,211.000 KWH 68,385.000 KWH
WEST HOLLYWOOD ELEM 121,200.000 KWH 92,280.000 KWH
WESTCHESTER ELEMENTARY 140,633.000 KWH 138,002.000 KWH
WESTERN HIGH 391,231.000 KWH 495,836.000 KWH
WESTGLADES MIDDLE 270,000.000 KWH 289,680.000 KWH
WESTPINE MIDDLE 153,720.000 KWH 150,240.000 KWH
WESTWOOD HEIGHTS ELEM 155,698.000 KWH 139,493.000 KWH
WHIDDON-ROGERS ED CENTER 151,600.000 KWH 126,800.000 KWH
WHISPERING PINES 71,520.000 KWH 78,840.000 KWH
WILLIAM DANDY MIDDLE 181,560.000 KWH 179,160.000 KWH
WILTON MANORS ELEM 123,720.000 KWH 108,900.000 KWH
WINGATE OAKS CTR 94,920.000 KWH 100,080.000 KWH
WINSTON PARK ELEM 171,120.000 KWH 143,040.000 KWH