Utility Savings
Building Name
May-08
May-09
APOLLO MIDDLE 262,320.000 KWH 230,880.000 KWH
ARTHUR ASHE MIDDLE 314,400.000 KWH 313,200.000 KWH
ATLANTIC VOC CENTER 534,033.000 KWH 530,781.000 KWH
ATLANTIC WEST ELEM 149,640.000 KWH 152,880.000 KWH
ATTUCKS MIDDLE 294,240.000 KWH 283,200.000 KWH
BAIR MIDDLE 206,400.000 KWH 191,280.000 KWH
BANYAN ELEM 150,480.000 KWH 145,440.000 KWH
BAYVIEW ELEM 104,760.000 KWH 96,720.000 KWH
BECON 251,920.000 KWH 243,920.000 KWH
BENNETT ELEM 123,840.000 KWH 108,480.000 KWH
BETHUNE ELEM 237,720.000 KWH 209,760.000 KWH
BOULEVARD HEIGHTS ELEM 131,640.000 KWH 137,520.000 KWH
BOYD ANDERSON HIGH 494,996.000 KWH 422,820.000 KWH
BRIGHT HORIZONS CTR 134,400.000 KWH 120,480.000 KWH
BROADVIEW ELEM 154,220.000 KWH 140,600.000 KWH
BROWARD EDUCATION FOUNDATION 1,270.000 KWH .000 KWH
BROWARD ESTATES ELEM 128,924.000 KWH 126,919.000 KWH
BROWARD FIRE ACADEMY 30,720.000 KWH 36,222.000 KWH
CASTLE HILL ELEM 156,360.000 KWH 144,960.000 KWH
CENTRAL PARK ELEM 168,480.000 KWH 151,320.000 KWH
CHALLENGER ELEMENTARY 181,920.000 KWH 161,880.000 KWH
CHAPEL TRAIL ELEM 224,821.000 KWH 190,837.000 KWH
CHARLES DREW ELEM 123,480.000 KWH 124,680.000 KWH
COCONUT CREEK ELEM 103,263.000 KWH 102,629.000 KWH
COCONUT CREEK HIGH 370,922.000 KWH 369,346.000 KWH
COCONUT PALM ELEMENTARY 182,520.000 KWH 155,760.000 KWH
COLBERT ELEM 156,000.000 KWH 146,880.000 KWH
COLLINS ELEM 73,440.000 KWH 72,240.000 KWH
COOPER CITY COMM 29,160.000 KWH 24,480.000 KWH
COMMUNITY SCHOOL NORTH .000 KWH 11,085.000 KWH
COMMUNITY SCHOOL SOUTH 5,213.000 KWH 5,161.000 KWH
COOPER CITY ELEM 129,120.000 KWH 125,760.000 KWH
COOPER CITY HIGH 602,932.000 KWH 508,723.000 KWH
CORAL COVE ELEMENTARY 135,840.000 KWH 124,560.000 KWH
CORAL GLADES HIGH 420,960.000 KWH 377,760.000 KWH
CORAL PARK ELEM 164,040.000 KWH 142,680.000 KWH
CORAL SPRINGS ELEM 129,120.000 KWH 139,440.000 KWH
CORAL SPRINGS HIGH 476,442.000 KWH 498,132.000 KWH
CORAL SPRINGS MIDDLE 242,040.000 KWH 237,640.000 KWH
COUNTRY HILLS ELEM 179,280.000 KWH 158,400.000 KWH
COUNTRY ISLES ELEM 196,320.000 KWH 200,160.000 KWH
CRESTHAVEN ELEM 132,960.000 KWH 129,720.000 KWH
CROISSANT PARK ELEM 138,928.000 KWH 135,532.000 KWH
CROSS CREEK 90,420.000 KWH 86,580.000 KWH
CRYSTAL LAKE COMM SCHOOL 11,527.000 KWH 9,573.000 KWH
CRYSTAL LAKE MIDDLE 274,711.000 KWH 250,107.000 KWH
CYPRESS BAY HIGH 589,600.000 KWH 545,600.000 KWH
CYPRESS BAY HIGH ANNEX 60,720.000 KWH 65,040.000 KWH
CYPRESS ELEM 111,840.000 KWH 133,200.000 KWH
CYPRESS RUN ALTERNATIVE 97,138.000 KWH 72,978.000 KWH
DANIA ELEM 132,186.000 KWH 126,997.000 KWH
DAVE THOMAS ED CENTER (WEST) 94,080.000 KWH 101,760.000 KWH
DAVE THOMAS EDUCATION CENTER 49,230.000 KWH 43,416.000 KWH
DAVIE ELEM 187,431.000 KWH 127,050.000 KWH
DEERFIELD BEACH ELEM 152,160.000 KWH 191,814.000 KWH
DEERFIELD BEACH HIGH 412,794.000 KWH 373,086.000 KWH
DEERFIELD BEACH MID 291,776.000 KWH 311,332.000 KWH
DEERFIELD PARK ELEM 127,680.000 KWH 176,640.000 KWH
DILLARD ELEM 144,600.000 KWH 159,240.000 KWH
DILLARD HIGH COMM 6,533.000 KWH .000 KWH
DILLARD HIGH SCHOOL 711,724.000 KWH 643,616.000 KWH
DOLPHIN BAY ELEMENTARY 136,800.000 KWH 120,480.000 KWH
DREW RESOURCE CTR 85,726.000 KWH 78,105.000 KWH
DRIFTWOOD ELEM 106,456.000 KWH 97,581.000 KWH
DRIFTWOOD MIDDLE 379,344.000 KWH 330,306.000 KWH
EAGLE POINT ELEM 253,800.000 KWH 208,200.000 KWH
EAGLE RIDGE ELEM 185,520.000 KWH 161,520.000 KWH
ECIA SPECIAL PROGRAMS 34,499.000 KWH 30,783.000 KWH
EDGEWOOD CENTER 57,736.000 KWH 57,736.000 KWH
ELY HIGH 708,763.000 KWH 662,349.000 KWH
EMBASSY CREEK ELEM 105,960.000 KWH 130,440.000 KWH
ENDEAVOR LEARNING CENTER 95,640.000 KWH 88,200.000 KWH
EVERGLADES ELEMENTARY 202,718.000 KWH 171,201.000 KWH
EVERGLADES HIGH 557,400.000 KWH 528,000.000 KWH
FAIRWAY ELEM 166,320.000 KWH 180,240.000 KWH
FALCON COVE MIDDLE 352,670.000 KWH 373,550.000 KWH
FLAMINGO ELEM 180,328.000 KWH 135,568.000 KWH
FLANAGAN HIGH 600,927.000 KWH 546,916.000 KWH
FLORANADA ELEM 154,776.000 KWH 143,736.000 KWH
FOREST GLEN MIDDLE 227,117.000 KWH 228,393.000 KWH
FOREST HILLS ELEM 134,760.000 KWH 144,600.000 KWH
FORT LAUDERDALE HIGH 473,093.000 KWH 439,609.000 KWH
FOX TRAIL ELEMENTARY 170,880.000 KWH 167,040.000 KWH
GATOR RUN ELEMENTARY 266,520.000 KWH 217,440.000 KWH
GLADES MIDDLE 318,400.000 KWH 293,600.000 KWH
GRIFFIN ELEM 112,800.000 KWH 102,840.000 KWH
GULFSTREAM MIDDLE SCHOOL 99,600.000 KWH 101,040.000 KWH
HALLANDALE ADULT CENTER 190,893.000 KWH 182,435.000 KWH
HALLANDALE ELEM 165,600.000 KWH 142,320.000 KWH
HALLANDALE HIGH 331,054.000 KWH 316,035.000 KWH
HARBORDALE ELEM 92,208.000 KWH 94,368.000 KWH
HAWKES BLUFF ELEM 169,690.000 KWH 164,162.000 KWH
HOLLYWOOD CENTRAL AUDITORIUM 45,120.000 KWH 42,060.000 KWH
HOLLYWOOD CENTRAL ELEM 114,960.000 KWH 108,840.000 KWH
HOLLYWOOD HILLS COMMUNITY 2,314.000 KWH 2,273.000 KWH
HOLLYWOOD HILLS ELEMENTARY 190,200.000 KWH 162,600.000 KWH
HOLLYWOOD HILLS HIGH 448,311.000 KWH 406,926.000 KWH
HOLLYWOOD PARK ELEM 110,400.000 KWH 86,160.000 KWH
HORIZON ELEM 121,560.000 KWH 105,480.000 KWH
HORTT ADMIN SITE 68,769.000 KWH 56,233.000 KWH
INDIAN RIDGE MIDDLE 322,165.000 KWH 296,823.000 KWH
INDIAN TRACE ELEM 143,880.000 KWH 124,200.000 KWH
JAMES HUNT ELEMENTARY 155,880.000 KWH 137,640.000 KWH
KATHLEEN WRIGHT ADMIN 462,626.000 KWH 389,981.000 KWH
LAKE FOREST ELEM 195,480.000 KWH 158,040.000 KWH
LAKESIDE ELEMENTARY 157,440.000 KWH 120,720.000 KWH
LANIER JAMES CENTER 69,360.000 KWH 67,680.000 KWH
LARKDALE ELEM 108,360.000 KWH 120,911.000 KWH
LAUDERDALE LAKES MIDDLE 202,440.000 KWH 198,414.000 KWH
LAUDERDALE MANORS ELEM 201,840.000 KWH 212,280.000 KWH
LAUDERHILL MIDDLE 183,600.000 KWH 166,320.000 KWH
LAUDERHILL MIDDLE/COMM 4,543.000 KWH 5,101.000 KWH
LAUDERHILL PT ELEM 165,600.000 KWH 149,760.000 KWH
LIBERTY ELEMENTARY 167,760.000 KWH 162,480.000 KWH
LLOYD ESTATES ELEM 125,280.000 KWH 168,600.000 KWH
LOCKHART STADIUM 64,258.000 KWH 55,099.000 KWH
LYONS CREEK MIDDLE 336,240.000 KWH 321,360.000 KWH
MANATEE BAY ELEMENTARY 187,015.000 KWH 171,864.000 KWH
MAPLEWOOD ELEM 164,640.000 KWH 148,080.000 KWH
MARGATE ELEM 182,640.000 KWH 172,560.000 KWH
MARGATE MIDDLE 236,496.000 KWH 218,234.000 KWH
MARKHAM ELEM 114,183.000 KWH 125,008.000 KWH
MARTIN LUTHER KING ELEM 165,323.000 KWH 139,303.000 KWH
MCARTHUR HIGH 444,964.000 KWH 438,252.000 KWH
MCFATTER VO TECH 324,960.000 KWH 334,800.000 KWH
MCNAB ELEMENTARY 169,080.000 KWH 151,783.000 KWH
MCNICOL MIDDLE 306,240.000 KWH 266,880.000 KWH
MEADOWBROOK ELEM 123,827.000 KWH 140,880.000 KWH
MILLENNIUM MIDDLE 326,400.000 KWH 311,520.000 KWH
MIRAMAR ELEM 149,520.000 KWH 150,000.000 KWH
MIRAMAR HIGH 490,426.000 KWH 413,311.000 KWH
MIRROR LAKE ELEM 101,760.000 KWH 91,680.000 KWH
MONARCH HIGH 419,600.000 KWH 363,421.000 KWH
MORROW ELEM 122,280.000 KWH 123,720.000 KWH
MULTICULTURAL CENTER 17,160.000 KWH 10,200.000 KWH
N ANDREWS GARDENS ELEM 176,304.000 KWH 204,384.000 KWH
NEW RENAISSANCE MIDDLE 293,881.000 KWH 275,901.000 KWH
NEW RIVER MIDDLE SCHOOL 166,404.000 KWH 63,384.000 KWH
NOB HILL ELEM 267,360.000 KWH 243,480.000 KWH
NORCREST ELEM 134,520.000 KWH 119,760.000 KWH
NORTH AREA MAINT/WHSE 170,463.000 KWH 214,879.000 KWH
NORTH AREA SUPERINTENDENT 39,780.000 KWH 39,180.000 KWH
NORTH BUS PARKING LOT 72,706.000 KWH 80,064.000 KWH
NORTH CENTRAL SUPERINTENDENT 110,820.000 KWH 81,300.000 KWH
NORTH FORK ELEM 127,560.000 KWH 129,480.000 KWH
NORTH LAUDERDALE ELEM 117,360.000 KWH 107,520.000 KWH
NORTH SIDE ELEMENTARY 112,440.000 KWH 123,240.000 KWH
NORTHEAST HIGH 382,646.000 KWH 349,710.000 KWH
NOVA BLANCHE FORMAN/EISENHOWER ELEM 297,600.000 KWH 242,000.000 KWH
NOVA EISENHOWER ELEMENTARY 9,868.000 KWH 9,258.000 KWH
NOVA HIGH 8,000.000 KWH 34,830.000 KWH
NOVA HIGH - MECH PLANT 590,400.000 KWH 745,600.000 KWH
OAKLAND PARK ELEM 161,520.000 KWH 134,520.000 KWH
OAKRIDGE ELEM 156,231.000 KWH 129,992.000 KWH
OLSEN MIDDLE 196,800.000 KWH 225,480.000 KWH
OLSEN MIDDLE ANNEX 163,160.000 KWH 134,360.000 KWH
ORANGEBROOK ELEM 132,720.000 KWH 107,040.000 KWH
ORIOLE ELEM 128,880.000 KWH 109,920.000 KWH
PALM COVE ELEM 152,280.000 KWH 152,640.000 KWH
PALMVIEW ELEM 148,920.000 KWH 123,360.000 KWH
PANTHER RUN ELEM 124,320.000 KWH 111,480.000 KWH
PARK LAKES ELEMENTARY 223,200.000 KWH 214,080.000 KWH
PARK LAKES ELEMENTARY ANNEX 19,408.000 KWH 18,088.000 KWH
PARK RIDGE ELEM 117,600.000 KWH 105,000.000 KWH
PARK SPRINGS ELEM 168,240.000 KWH 166,800.000 KWH
PARK TRAILS ELEMENTARY 205,920.000 KWH 195,600.000 KWH
PARKSIDE ELEMENTARY 172,080.000 KWH 159,600.000 KWH
PARKWAY MIDDLE 376,737.000 KWH 364,436.000 KWH
PASADENA LAKES ELEM 156,412.000 KWH 156,519.000 KWH
PEMBROKE LAKES ELEM 120,480.000 KWH 115,860.000 KWH
PEMBROKE PINES ELEM 133,278.000 KWH 122,317.000 KWH
PERRY ELEM 144,985.000 KWH 140,169.000 KWH
PERRY MIDDLE 233,280.000 KWH 193,440.000 KWH
PETERS ELEM 122,751.000 KWH 117,514.000 KWH
PHYSICAL PLANT OPERATIONS 112,506.000 KWH 112,595.000 KWH
PINE RIDGE CTR 97,680.000 KWH 90,960.000 KWH
PINES LAKES ELEM 144,480.000 KWH 168,925.000 KWH
PINES MIDDLE 231,208.000 KWH 257,128.000 KWH
PINEWOOD ELEM 152,040.000 KWH 142,680.000 KWH
PIONEER MIDDLE 204,105.000 KWH 210,731.000 KWH
PIONEER MIDDLE ANNEX 37,980.000 KWH 41,640.000 KWH
PIPER HIGH 489,245.000 KWH 525,536.000 KWH
PLANTATION ELEM 161,968.000 KWH 152,516.000 KWH
PLANTATION HIGH 443,962.000 KWH 428,104.000 KWH
PLANTATION MIDDLE 205,678.000 KWH 209,624.000 KWH
PLANTATION PARK ELEM 118,965.000 KWH 102,566.000 KWH
POMPANO BEACH ELEM 140,760.000 KWH 133,440.000 KWH
POMPANO BEACH HIGH 329,142.000 KWH 344,322.000 KWH
POMPANO BEACH MIDDLE 259,008.000 KWH 255,168.000 KWH
PPO ZONE 2 - LEASED 151,954.000 KWH 73,010.000 KWH
QUIET WATERS ELEM 24,494.000 KWH 23,715.000 KWH
RAMBLEWOOD ELEM 178,980.000 KWH 247,560.000 KWH
RAMBLEWOOD MIDDLE 150,960.000 KWH 132,720.000 KWH
RICKARDS MIDDLE 292,080.000 KWH 256,863.000 KWH
RIVERGLADES ELEM 205,282.000 KWH 208,753.000 KWH
RIVERLAND ELEM 117,240.000 KWH 117,720.000 KWH
RIVERSIDE ELEM 136,920.000 KWH 124,800.000 KWH
ROCK ISLAND ADMIN 161,400.000 KWH 163,920.000 KWH
ROYAL PALM ELEMENTARY 91,392.000 KWH 82,152.000 KWH
SAFETY DEPARTMENT 172,216.000 KWH 185,416.000 KWH
SANDERS PARK ELEM 121,200.000 KWH 103,600.000 KWH
SANDPIPER ELEM 185,640.000 KWH 180,600.000 KWH
SAWGRASS ELEM 167,520.000 KWH 148,200.000 KWH
SAWGRASS SPRINGS MIDDLE 248,760.000 KWH 234,600.000 KWH
SEA CASTLE ELEM 169,680.000 KWH 169,200.000 KWH
SEAGULL SCHOOL 130,439.000 KWH 116,550.000 KWH
SEMINOLE MIDDLE 270,840.000 KWH 241,080.000 KWH
SHERIDAN HILLS ELEM 121,193.000 KWH 109,938.000 KWH
SHERIDAN PARK ELEM 133,680.000 KWH 126,720.000 KWH
SHERIDAN VOCATIONAL 396,480.000 KWH 329,040.000 KWH
SILVER LAKES ELEMENTARY 132,000.000 KWH 130,440.000 KWH
SILVER LAKES MIDDLE 218,040.000 KWH 158,160.000 KWH
SILVER PALMS ELEM 165,960.000 KWH 164,040.000 KWH
SILVER RIDGE ELEM 224,040.000 KWH 199,800.000 KWH
SILVER SHORES ELEMENTARY 157,800.000 KWH 150,480.000 KWH
SILVER TRAIL MIDDLE 280,080.000 KWH 273,840.000 KWH
SOUTH AREA BUS PARKING 38,125.000 KWH 39,671.000 KWH
SOUTH AREA MAINTENANCE 24,483.000 KWH 19,855.000 KWH
SOUTH BROWARD HIGH 513,654.000 KWH 456,779.000 KWH
SOUTH PLANTATION HIGH 472,600.000 KWH 408,420.000 KWH
SOUTH WEST BUS LOT 2,275.000 KWH 37,509.000 KWH
STEPHEN FOSTER ELEM 156,088.000 KWH 135,614.000 KWH
STIRLING ELEM 125,880.000 KWH 113,400.000 KWH
STONEMAN DOUGLAS HIGH 515,600.000 KWH 528,000.000 KWH
STRANAHAN HIGH 442,140.000 KWH 430,501.000 KWH
SUNLAND PARK ELEM 107,760.000 KWH 99,840.000 KWH
SUNRISE MIDDLE 233,513.000 KWH 241,554.000 KWH
SUNSET LAKES ELEMENTARY 141,720.000 KWH 160,440.000 KWH
SUNSET SCHOOL 123,192.000 KWH 100,632.000 KWH
SUNSHINE ELEMENTARY 119,472.000 KWH 133,220.000 KWH
TAMARAC ELEM 173,760.000 KWH 180,000.000 KWH
TARAVELLA HIGH 508,498.000 KWH 514,369.000 KWH
TECHNOLOGY AND SUPPORT SERVICE 394,320.000 KWH 360,000.000 KWH
TEDDER ELEMENTARY SCHOOL 166,097.000 KWH 156,545.000 KWH
TEQUESTA TRACE MIDDLE 235,560.000 KWH 237,720.000 KWH
THE QUEST CENTER 107,280.000 KWH 99,600.000 KWH
THURGOOD MARSHALL ELEM 115,704.000 KWH 117,504.000 KWH
TRADEWINDS ELEM 208,560.000 KWH 218,640.000 KWH
TRANSPORTATION SERVICE ANNEX .000 KWH 5,760.000 KWH
TROPICAL ELEM 130,784.000 KWH 121,518.000 KWH
TWIN LAKES ADMIN 64,320.000 KWH 71,760.000 KWH
TWIN LAKES ANNEX/NEW WHSE 2,922.000 KWH 2,908.000 KWH
TWIN LAKES COMPLEX 115,288.000 KWH 120,117.000 KWH
VEHICLE MAINTENANCE 95,520.000 KWH 88,080.000 KWH
VILLAGE ELEM 175,020.000 KWH 207,420.000 KWH
VIRGINIA YOUNG ELEM 97,560.000 KWH 110,040.000 KWH
WALKER ELEM 222,408.000 KWH 217,163.000 KWH
WALTER C YOUNG MIDDLE 514,380.000 KWH 445,276.000 KWH
WATKINS ELEM 168,240.000 KWH 147,000.000 KWH
WELLEBY ELEM 127,920.000 KWH 129,000.000 KWH
WEST BROWARD HIG/LLL 392,000.000 KWH 392,000.000 KWH
WEST CENTRAL BUS COMPLEX 64,459.000 KWH 65,631.000 KWH
WEST HOLLYWOOD ELEM 124,560.000 KWH 115,440.000 KWH
WESTCHESTER ELEMENTARY 184,567.000 KWH 165,974.000 KWH
WESTERN HIGH 456,183.000 KWH 526,009.000 KWH
WESTGLADES MIDDLE 294,000.000 KWH 337,200.000 KWH
WESTPINE MIDDLE 174,480.000 KWH 174,720.000 KWH
WESTWOOD HEIGHTS ELEM 187,292.000 KWH 149,177.000 KWH
WHIDDON-ROGERS ED CENTER 190,000.000 KWH 158,000.000 KWH
WHISPERING PINES 97,200.000 KWH 94,080.000 KWH
WILLIAM DANDY MIDDLE 209,640.000 KWH 219,120.000 KWH
WILTON MANORS ELEM 145,740.000 KWH 123,600.000 KWH
WINGATE OAKS CTR 129,960.000 KWH 107,760.000 KWH
WINSTON PARK ELEM 222,240.000 KWH 168,240.000 KWH