Building
Name |
Nov-07 |
Nov-08 |
| APOLLO
MIDDLE |
208,800.000
KWH |
223,440.000
KWH |
| ARTHUR
ASHE MIDDLE |
360,000.000
KWH |
303,600.000
KWH |
| ATLANTIC
VOC CENTER |
554,430.000
KWH |
525,601.000
KWH |
| ATLANTIC
WEST ELEM |
180,480.000
KWH |
132,120.000
KWH |
| ATTUCKS
MIDDLE |
279,390.000
KWH |
233,040.000
KWH |
| BAIR
MIDDLE |
199,200.000
KWH |
179,040.000
KWH |
| BANYAN
ELEM |
146,400.000
KWH |
138,960.000
KWH |
| BAYVIEW
ELEM |
99,720.000
KWH |
99,960.000
KWH |
| BECON |
210,800.000
KWH |
246,760.000
KWH |
| BENNETT
ELEM |
91,200.000
KWH |
104,640.000
KWH |
| BETHUNE
ELEM |
201,000.000
KWH |
185,760.000
KWH |
| BOULEVARD
HEIGHTS ELEM |
105,600.000
KWH |
128,760.000
KWH |
| BOYD
ANDERSON HIGH |
485,314.000
KWH |
431,309.000
KWH |
| BRIGHT
HORIZONS CTR |
129,600.000
KWH |
103,680.000
KWH |
| BROADVIEW
ELEM |
131,555.000
KWH |
119,664.000
KWH |
| BROWARD
EDUCATION FOUNDATION |
2,284.000
KWH |
.000
KWH |
| BROWARD
ESTATES ELEM |
190,660.000
KWH |
107,811.000
KWH |
| BROWARD
FIRE ACADEMY |
32,580.000
KWH |
31,727.000
KWH |
| CASTLE
HILL ELEM |
144,120.000
KWH |
154,440.000
KWH |
| CENTRAL
PARK ELEM |
24,000.000
KWH |
.000
KWH |
| CHALLENGER
ELEMENTARY |
161,400.000
KWH |
144,720.000
KWH |
| CHAPEL
TRAIL ELEM |
155,640.000
KWH |
134,160.000
KWH |
| CHARLES
DREW ELEM |
214,784.000
KWH |
172,336.000
KWH |
| COCONUT
CREEK ELEM |
118,560.000
KWH |
119,760.000
KWH |
| COCONUT
CREEK HIGH |
118,952.000
KWH |
106,349.000
KWH |
| COCONUT
PALM ELEMENTARY |
431,021.000
KWH |
350,663.000
KWH |
| COLBERT
ELEM |
171,720.000
KWH |
138,000.000
KWH |
| COLLINS
ELEM |
160,080.000
KWH |
124,320.000
KWH |
| COOPER
CITY COMM |
80,400.000
KWH |
60,000.000
KWH |
| COOPER
CITY ELEM |
.000
KWH |
7,384.000
KWH |
| COOPER
CITY HIGH |
7,975.000
KWH |
6,314.000
KWH |
| CORAL
COVE ELEMENTARY |
128,880.000
KWH |
117,840.000
KWH |
| CORAL
GLADES HIGH |
588,467.000
KWH |
518,980.000
KWH |
| CORAL
PARK ELEM |
124,320.000
KWH |
109,200.000
KWH |
| CORAL
SPRINGS ELEM |
483,360.000
KWH |
394,320.000
KWH |
| CORAL
SPRINGS COMMUNITY |
126,120.000
KWH |
131,760.000
KWH |
| CORAL
SPRINGS HIGH |
127,200.000
KWH |
113,040.000
KWH |
| CORAL
SPRINGS MIDDLE |
446,923.000
KWH |
434,373.000
KWH |
| COUNTRY
HILLS ELEM |
249,240.000
KWH |
199,640.000
KWH |
| COUNTRY
ISLES ELEM |
171,000.000
KWH |
149,040.000
KWH |
| CRESTHAVEN
ELEM |
184,080.000
KWH |
156,600.000
KWH |
| CROISSANT
PARK ELEM |
117,120.000
KWH |
106,560.000
KWH |
| CROSS
CREEK |
127,730.000
KWH |
118,380.000
KWH |
| CRYSTAL
LAKE COMM SCHOOL |
85,740.000
KWH |
75,720.000
KWH |
| CRYSTAL
LAKE MIDDLE |
7,512.000
KWH |
6,226.000
KWH |
| CYPRESS
BAY HIGH |
231,938.000
KWH |
203,154.000
KWH |
| CYPRESS
BAY HIGH ANNEX |
564,400.000
KWH |
554,800.000
KWH |
| CYPRESS
ELEM |
201,024.000
KWH |
67,440.000
KWH |
| CYPRESS
RUN ALTERNATIVE |
108,960.000
KWH |
97,920.000
KWH |
| DANIA
ELEM |
52,827.000
KWH |
67,851.000
KWH |
| DAVE
THOMAS ED CENTER (WEST) |
110,552.000
KWH |
129,785.000
KWH |
| DAVE
THOMAS EDUCATION CENTER |
148,080.000
KWH |
106,560.000
KWH |
| DAVIE
ELEM |
43,492.000
KWH |
41,484.000
KWH |
| DEERFIELD
BEACH ELEM |
133,518.000
KWH |
117,573.000
KWH |
| DEERFIELD
BEACH HIGH |
171,939.000
KWH |
138,000.000
KWH |
| DEERFIELD
BEACH MID |
442,083.000
KWH |
414,412.000
KWH |
| DEERFIELD
PARK ELEM |
268,177.000
KWH |
205,067.000
KWH |
| DILLARD
ELEM |
127,680.000
KWH |
110,880.000
KWH |
| DILLARD
HIGH COMM |
142,560.000
KWH |
133,440.000
KWH |
| DILLARD
HIGH SCHOOL |
6,062.000
KWH |
.000
KWH |
| DOLPHIN
BAY ELEMENTARY |
811,704.000
KWH |
608,317.000
KWH |
| DREW
RESOURCE CTR |
120,960.000
KWH |
106,560.000
KWH |
| DRIFTWOOD
ELEM |
90,012.000
KWH |
63,645.000
KWH |
| DRIFTWOOD
MIDDLE |
101,877.000
KWH |
97,787.000
KWH |
| EAGLE
POINT ELEM |
319,261.000
KWH |
357,513.000
KWH |
| EAGLE
RIDGE ELEM |
234,840.000
KWH |
207,360.000
KWH |
| ECIA
SPECIAL PROGRAMS |
168,720.000
KWH |
141,000.000
KWH |
| EDGEWOOD
CENTER |
24,040.000
KWH |
22,302.000
KWH |
| ELY
HIGH |
49,096.000
KWH |
54,016.000
KWH |
| EMBASSY
CREEK ELEM |
787,138.000
KWH |
764,126.000
KWH |
| ENDEAVOR
LEARNING CENTER |
99,960.000
KWH |
111,120.000
KWH |
| EVERGLADES
9TH GRADE ANNEX |
114,360.000
KWH |
85,920.000
KWH |
| EVERGLADES
ELEMENTARY |
123,785.000
KWH |
57,810.000
KWH |
| EVERGLADES
HIGH |
234,336.000
KWH |
198,703.000
KWH |
| FAIRWAY
ELEM |
626,520.000
KWH |
488,280.000
KWH |
| FALCON
COVE MIDDLE |
220,920.000
KWH |
185,040.000
KWH |
| FLAMINGO
ELEM |
427,185.000
KWH |
379,383.000
KWH |
| FLANAGAN
HIGH |
138,448.000
KWH |
114,088.000
KWH |
| FLORANADA
ELEM |
625,609.000
KWH |
499,185.000
KWH |
| FOREST
GLEN MIDDLE |
139,056.000
KWH |
123,456.000
KWH |
| FOREST
HILLS ELEM |
245,512.000
KWH |
189,359.000
KWH |
| FORT
LAUDERDALE HIGH |
119,640.000
KWH |
121,080.000
KWH |
| FORT
LAUDERDALE HIGH ANNEX |
568,727.000
KWH |
566,489.000
KWH |
| FOX
TRAIL ELEMENTARY |
162,000.000
KWH |
152,280.000
KWH |
| GATOR
RUN ELEMENTARY |
236,760.000
KWH |
129,840.000
KWH |
| GLADES
MIDDLE |
300,400.000
KWH |
300,000.000
KWH |
| GRIFFIN
ELEM |
111,720.000
KWH |
91,080.000
KWH |
| GULFSTREAM
MIDDLE SCHOOL |
97,440.000
KWH |
69,120.000
KWH |
| HALLANDALE
ADULT CENTER |
189,022.000
KWH |
156,569.000
KWH |
| HALLANDALE
ELEM |
193,200.000
KWH |
123,840.000
KWH |
| HALLANDALE
HIGH |
318,530.000
KWH |
291,276.000
KWH |
| HARBORDALE
ELEM |
106,536.000
KWH |
71,928.000
KWH |
| HAWKES
BLUFF ELEM |
170,886.000
KWH |
146,167.000
KWH |
| HOLLYWOOD
CENTRAL AUDITORIUM |
34,920.000
KWH |
34,980.000
KWH |
| HOLLYWOOD
CENTRAL ELEM |
100,920.000
KWH |
90,240.000
KWH |
| HOLLYWOOD
HILLS COMMUNITY |
3,270.000
KWH |
2,207.000
KWH |
| HOLLYWOOD
HILLS ELEMENTARY |
90,000.000
KWH |
150,480.000
KWH |
| HOLLYWOOD
HILLS HIGH |
397,187.000
KWH |
351,529.000
KWH |
| HOLLYWOOD
PARK ELEM |
105,120.000
KWH |
78,960.000
KWH |
| HORIZON
ELEM |
120,120.000
KWH |
318,000.000
KWH |
| HORTT
ADMIN SITE |
59,349.000
KWH |
53,550.000
KWH |
| INDIAN
RIDGE MIDDLE |
305,584.000
KWH |
274,217.000
KWH |
| INDIAN
TRACE ELEM |
126,240.000
KWH |
121,320.000
KWH |
| JAMES
HUNT ELEMENTARY |
137,520.000
KWH |
120,840.000
KWH |
| KATHLEEN
WRIGHT ADMIN |
477,642.000
KWH |
414,973.000
KWH |
| LAKE
FOREST ELEM |
176,448.000
KWH |
138,000.000
KWH |
| LAKESIDE
ELEMENTARY |
144,240.000
KWH |
117,840.000
KWH |
| LANIER
JAMES CENTER |
62,400.000
KWH |
56,160.000
KWH |
| LARKDALE
ELEM |
57,267.000
KWH |
79,090.000
KWH |
| LAUDERDALE
LAKES MIDDLE |
168,480.000
KWH |
173,400.000
KWH |
| LAUDERDALE
MANORS ELEM |
242,400.000
KWH |
189,840.000
KWH |
| LAUDERHILL
MIDDLE |
165,840.000
KWH |
146,880.000
KWH |
| LAUDERHILL
MIDDLE/COMM |
3,752.000
KWH |
3,810.000
KWH |
| LAUDERHILL
PT ELEM |
166,800.000
KWH |
141,240.000
KWH |
| LIBERTY
ELEMENTARY |
148,560.000
KWH |
152,880.000
KWH |
| LLOYD
ESTATES ELEM |
100,080.000
KWH |
90,240.000
KWH |
| LOCKHART
STADIUM |
79,408.000
KWH |
69,707.000
KWH |
| LYONS
CREEK MIDDLE |
327,600.000
KWH |
289,920.000
KWH |
| MANATEE
BAY ELEMENTARY |
179,150.000
KWH |
162,915.000
KWH |
| MAPLEWOOD
ELEM |
144,840.000
KWH |
124,080.000
KWH |
| MARGATE
ELEM |
168,300.000
KWH |
182,880.000
KWH |
| MARGATE
MIDDLE |
260,754.000
KWH |
204,247.000
KWH |
| MARKHAM
ELEM |
127,480.000
KWH |
100,006.000
KWH |
| MARTIN
LUTHER KING ELEM |
161,197.000
KWH |
176,898.000
KWH |
| MCARTHUR
HIGH |
447,506.000
KWH |
451,829.000
KWH |
| MCFATTER
VO TECH |
366,480.000
KWH |
315,360.000
KWH |
| MCNAB
ELEMENTARY |
169,200.000
KWH |
129,892.000
KWH |
| MCNICOL
MIDDLE |
322,560.000
KWH |
242,880.000
KWH |
| MEADOWBROOK
ELEM |
110,008.000
KWH |
128,773.000
KWH |
| MILLENNIUM
MIDDLE |
353,520.000
KWH |
281,760.000
KWH |
| MIRAMAR
ELEM |
141,360.000
KWH |
137,880.000
KWH |
| MIRAMAR
HIGH |
597,302.000
KWH |
499,213.000
KWH |
| MIRROR
LAKE ELEM |
97,200.000
KWH |
89,040.000
KWH |
| MONARCH
HIGH |
390,400.000
KWH |
390,800.000
KWH |
| MORROW
ELEM |
135,720.000
KWH |
138,240.000
KWH |
| MULTICULTURAL
CENTER |
21,480.000
KWH |
13,080.000
KWH |
| N
ANDREWS GARDENS ELEM |
182,424.000
KWH |
187,104.000
KWH |
| NEW
RENAISSANCE MIDDLE |
252,845.000
KWH |
225,235.000
KWH |
| NEW
RIVER MIDDLE SCHOOL |
139,824.000
KWH |
50,304.000
KWH |
| NOB
HILL ELEM |
273,000.000
KWH |
214,680.000
KWH |
| NORCREST
ELEM |
121,320.000
KWH |
120,840.000
KWH |
| NORTH
AREA MAINT/WHSE |
139,022.000
KWH |
248,644.000
KWH |
| NORTH
AREA SUPERINTENDENT |
34,140.000
KWH |
32,400.000
KWH |
| NORTH
BUS PARKING LOT |
8,219.000
KWH |
10,382.000
KWH |
| NORTH
CENTRAL SUPERINTENDENT |
76,244.000
KWH |
70,075.000
KWH |
| NORTH
FORK ELEM |
104,160.000
KWH |
86,400.000
KWH |
| NORTH
LAUDERDALE ELEM |
168,960.000
KWH |
126,000.000
KWH |
| NORTH
SIDE ELEMENTARY |
132,240.000
KWH |
104,400.000
KWH |
| NORTH
WEST TRANSPORTATION |
137,520.000
KWH |
112,440.000
KWH |
| NORTHEAST
HIGH |
336,908.000
KWH |
362,698.000
KWH |
| NOVA
BLANCHE FORMAN/EISENHOWER ELEM |
288,800.000
KWH |
248,800.000
KWH |
| NOVA
EISENHOWER ELEMENTARY |
11,346.000
KWH |
9,687.000
KWH |
| NOVA
HIGH |
7,383.000
KWH |
31,770.000
KWH |
| NOVA
HIGH - MECH PLANT |
731,200.000
KWH |
753,600.000
KWH |
| NOVA
HIGH COMM/GED |
149,280.000
KWH |
121,920.000
KWH |
| OAKLAND
PARK ELEM |
138,449.000
KWH |
130,318.000
KWH |
| OAKRIDGE
ELEM |
179,040.000
KWH |
167,040.000
KWH |
| OLSEN
MIDDLE |
111,320.000
KWH |
102,920.000
KWH |
| OLSEN
MIDDLE ANNEX |
154,560.000
KWH |
114,720.000
KWH |
| ORANGEBROOK
ELEM |
108,000.000
KWH |
95,280.000
KWH |
| ORIOLE
ELEM |
189,960.000
KWH |
139,200.000
KWH |
| PALM
COVE ELEM |
164,760.000
KWH |
137,160.000
KWH |
| PALMVIEW
ELEM |
120,840.000
KWH |
95,160.000
KWH |
| PANTHER
RUN ELEM |
200,880.000
KWH |
183,360.000
KWH |
| PARK
LAKES ELEMENTARY |
41,664.000
KWH |
19,048.000
KWH |
| PARK
LAKES ELEMENTARY ANNEX |
104,520.000
KWH |
93,480.000
KWH |
| PARK
RIDGE ELEM |
165,360.000
KWH |
137,040.000
KWH |
| PARK
SPRINGS ELEM |
193,680.000
KWH |
162,360.000
KWH |
| PARK
TRAILS ELEMENTARY |
167,760.000
KWH |
125,280.000
KWH |
| PARKSIDE
ELEMENTARY |
448,132.000
KWH |
333,365.000
KWH |
| PARKWAY
MIDDLE |
199,901.000
KWH |
151,258.000
KWH |
| PASADENA
LAKES ELEM |
114,900.000
KWH |
100,920.000
KWH |
| PEMBROKE
LAKES ELEM |
107,431.000
KWH |
105,433.000
KWH |
| PEMBROKE
PINES ELEM |
147,493.000
KWH |
116,685.000
KWH |
| PERRY
ELEM |
222,240.000
KWH |
222,480.000
KWH |
| PERRY
MIDDLE |
150,950.000
KWH |
166,000.000
KWH |
| PETERS
ELEM |
104,760.000
KWH |
95,280.000
KWH |
| PHYSICAL
PLANT OPERATIONS |
83,760.000
KWH |
76,080.000
KWH |
| PINE
RIDGE CTR |
141,480.000
KWH |
131,400.000
KWH |
| PINES
LAKES ELEM |
503,464.000
KWH |
232,648.000
KWH |
| PINES
MIDDLE |
137,520.000
KWH |
177,360.000
KWH |
| PINEWOOD
ELEM |
208,575.000
KWH |
198,685.000
KWH |
| PIONEER
MIDDLE |
38,400.000
KWH |
34,860.000
KWH |
| PIONEER
MIDDLE ANNEX |
494,601.000
KWH |
425,452.000
KWH |
| PIPER
HIGH |
137,793.000
KWH |
130,582.000
KWH |
| PLANTATION
ELEM |
446,751.000
KWH |
403,965.000
KWH |
| PLANTATION
HIGH |
233,490.000
KWH |
202,485.000
KWH |
| PLANTATION
MIDDLE |
87,697.000
KWH |
77,468.000
KWH |
| PLANTATION
PARK ELEM |
119,160.000
KWH |
154,680.000
KWH |
| POMPANO
BEACH ELEM |
354,408.000
KWH |
282,027.000
KWH |
| POMPANO
BEACH HIGH |
232,056.000
KWH |
198,408.000
KWH |
| POMPANO
BEACH MIDDLE |
25,000.000
KWH |
23,681.000
KWH |
| PPO
ZONE 2 - LEASED |
174,420.000
KWH |
133,320.000
KWH |
| QUIET
WATERS ELEM |
145,200.000
KWH |
158,880.000
KWH |
| RAMBLEWOOD
ELEM |
322,080.000
KWH |
240,065.000
KWH |
| RAMBLEWOOD
MIDDLE |
190,878.000
KWH |
175,928.000
KWH |
| RICKARDS
MIDDLE |
120,240.000
KWH |
100,800.000
KWH |
| RIVERGLADES
ELEM |
114,360.000
KWH |
113,160.000
KWH |
| RIVERLAND
ELEM |
147,360.000
KWH |
137,760.000
KWH |
| RIVERSIDE
ELEM |
85,272.000
KWH |
67,992.000
KWH |
| ROCK
ISLAND ADMIN |
158,371.000
KWH |
157,460.000
KWH |
| ROYAL
PALM ELEMENTARY |
108,400.000
KWH |
103,200.000
KWH |
| SAFETY
DEPARTMENT |
173,040.000
KWH |
135,360.000
KWH |
| SANDERS
PARK ELEM |
167,280.000
KWH |
143,400.000
KWH |
| SANDPIPER
ELEM |
251,040.000
KWH |
198,360.000
KWH |
| SAWGRASS
ELEM |
168,000.000
KWH |
171,120.000
KWH |
| SAWGRASS
SPRINGS MIDDLE |
121,152.000
KWH |
97,864.000
KWH |
| SEA
CASTLE ELEM |
240,360.000
KWH |
205,200.000
KWH |
| SEAGULL
SCHOOL |
102,941.000
KWH |
89,962.000
KWH |
| SEMINOLE
MIDDLE |
145,440.000
KWH |
119,520.000
KWH |
| SHERIDAN
HILLS ELEM |
392,640.000
KWH |
328,080.000
KWH |
| SHERIDAN
PARK ELEM |
122,400.000
KWH |
101,400.000
KWH |
| SHERIDAN
VOCATIONAL |
237,000.000
KWH |
166,080.000
KWH |
| SILVER
LAKES ELEMENTARY |
161,880.000
KWH |
135,600.000
KWH |
| SILVER
LAKES MIDDLE |
214,560.000
KWH |
180,840.000
KWH |
| SILVER
PALMS ELEM |
148,800.000
KWH |
125,160.000
KWH |
| SILVER
RIDGE ELEM |
278,400.000
KWH |
241,680.000
KWH |
| SILVER
SHORES ELEMENTARY |
39,320.000
KWH |
33,866.000
KWH |
| SILVER
TRAIL MIDDLE |
18,884.000
KWH |
17,211.000
KWH |
| SOUTH
AREA BUS PARKING |
455,733.000
KWH |
428,779.000
KWH |
| SOUTH
AREA MAINTENANCE |
584,196.000
KWH |
502,707.000
KWH |
| SOUTH
BROWARD HIGH |
1,397.000
KWH |
22,501.000
KWH |
| SOUTH
PLANTATION HIGH |
129,994.000
KWH |
128,028.000
KWH |
| SOUTH
WEST BUS LOT |
105,240.000
KWH |
99,360.000
KWH |
| STEPHEN
FOSTER ELEM |
532,800.000
KWH |
496,000.000
KWH |
| STIRLING
ELEM |
464,661.000
KWH |
412,125.000
KWH |
| STONEMAN
DOUGLAS HIGH |
117,600.000
KWH |
109,080.000
KWH |
| STRANAHAN
HIGH |
247,269.000
KWH |
242,268.000
KWH |
| SUNLAND
PARK ELEM |
133,560.000
KWH |
120,840.000
KWH |
| SUNRISE
MIDDLE |
124,392.000
KWH |
107,832.000
KWH |
| SUNSET
LAKES ELEMENTARY |
126,857.000
KWH |
145,198.000
KWH |
| SUNSET
SCHOOL |
169,440.000
KWH |
154,800.000
KWH |
| SUNSHINE
ELEMENTARY |
469,299.000
KWH |
425,696.000
KWH |
| TAMARAC
ELEM |
394,320.000
KWH |
342,480.000
KWH |
| TARAVELLA
HIGH |
150,523.000
KWH |
127,393.000
KWH |
| TECHNOLOGY
AND SUPPORT SERVICE |
245,160.000
KWH |
222,240.000
KWH |
| TEDDER
ELEMENTARY SCHOOL |
109,080.000
KWH |
100,920.000
KWH |
| TEQUESTA
TRACE MIDDLE |
139,224.000
KWH |
116,184.000
KWH |
| THE
QUEST CENTER |
200,160.000
KWH |
154,680.000
KWH |
| THURGOOD
MARSHALL ELEM |
7,920.000
KWH |
7,920.000
KWH |
| TRADEWINDS
ELEM |
116,675.000
KWH |
115,899.000
KWH |
| TROPICAL
ELEM |
60,240.000
KWH |
58,080.000
KWH |
| TWIN
LAKES ANNEX/NEW WHSE |
3,180.000
KWH |
2,458.000
KWH |
| TWIN
LAKES COMPLEX |
105,810.000
KWH |
87,513.000
KWH |
| VEHICLE
MAINTENANCE |
86,880.000
KWH |
80,640.000
KWH |
| VILLAGE
ELEM |
143,940.000
KWH |
172,680.000
KWH |
| VIRGINIA
YOUNG ELEM |
131,280.000
KWH |
89,040.000
KWH |
| WALKER
ELEM |
257,567.000
KWH |
197,753.000
KWH |
| WALTER
C YOUNG MIDDLE |
464,542.000
KWH |
431,123.000
KWH |
| WATKINS
ELEM |
135,360.000
KWH |
117,720.000
KWH |
| WELLEBY
ELEM |
112,680.000
KWH |
112,200.000
KWH |
| WEST
BROWARD HIG/LLL |
.000
KWH |
367,200.000
KWH |
| WEST
CENTRAL BUS COMPLEX |
59,098.000
KWH |
71,983.000
KWH |
| WEST
HOLLYWOOD ELEM |
111,960.000
KWH |
124,560.000
KWH |
| WESTCHESTER
ELEMENTARY |
155,655.000
KWH |
134,555.000
KWH |
| WESTERN
HIGH |
483,249.000
KWH |
424,572.000
KWH |
| WESTGLADES
MIDDLE |
287,040.000
KWH |
298,320.000
KWH |
| WESTPINE
MIDDLE |
179,880.000
KWH |
145,800.000
KWH |
| WESTWOOD
HEIGHTS ELEM |
172,015.000
KWH |
138,066.000
KWH |
| WHIDDON-ROGERS
ED CENTER |
147,600.000
KWH |
139,200.000
KWH |
| WHISPERING
PINES |
79,680.000
KWH |
77,160.000
KWH |
| WILLIAM
DANDY MIDDLE |
254,400.000
KWH |
185,880.000
KWH |
| WILTON
MANORS ELEM |
156,660.000
KWH |
128,640.000
KWH |
| WINGATE
OAKS CTR |
105,600.000
KWH |
94,080.000
KWH |
| WINSTON
PARK ELEM |
190,800.000
KWH |
168,480.000
KWH |
|