Building |
Sep-08 |
Sep-09 |
| APOLLO MIDDLE |
288,480.000 KWH |
277,920.000 KWH |
| ARTHUR ASHE MIDDLE |
346,000.000 KWH |
349,200.000 KWH |
| ATLANTIC VOC CENTER |
636,716.000 KWH |
604,252.000 KWH |
| ATLANTIC WEST ELEM |
168,960.000 KWH |
151,440.000 KWH |
| ATTUCKS MIDDLE |
295,200.000 KWH |
306,019.000 KWH |
| BAIR MIDDLE |
214,080.000 KWH |
207,120.000 KWH |
| BANYAN ELEM |
160,560.000 KWH |
142,560.000 KWH |
| BAYVIEW ELEM |
113,640.000 KWH |
101,040.000 KWH |
| BECON |
246,080.000 KWH |
194,600.000 KWH |
| BENNETT ELEM |
125,280.000 KWH |
112,320.000 KWH |
| BETHUNE ELEM |
226,440.000 KWH |
214,200.000 KWH |
| BOULEVARD HEIGHTS ELEM |
171,720.000 KWH |
142,560.000 KWH |
| BOYD ANDERSON HIGH |
519,419.000 KWH |
512,520.000 KWH |
| BRIGHT HORIZONS CTR |
164,880.000 KWH |
133,440.000 KWH |
| BROADVIEW ELEM |
161,646.000 KWH |
159,483.000 KWH |
| BROWARD ESTATES ELEM |
148,333.000 KWH |
155,953.000 KWH |
| BROWARD FIRE ACADEMY |
33,259.000 KWH |
47,119.000 KWH |
| CASTLE HILL ELEM |
158,640.000 KWH |
146,160.000 KWH |
| CENTRAL PARK ELEM |
185,400.000 KWH |
187,200.000 KWH |
| CHALLENGER ELEMENTARY |
198,240.000 KWH |
178,560.000 KWH |
| CHAPEL TRAIL ELEM |
255,017.000 KWH |
197,152.000 KWH |
| CHARLES DREW ELEM |
142,440.000 KWH |
129,120.000 KWH |
| COCONUT CREEK ELEM |
126,733.000 KWH |
110,588.000 KWH |
| COCONUT CREEK HIGH |
428,110.000 KWH |
374,713.000 KWH |
| COCONUT PALM ELEMENTARY |
196,560.000 KWH |
160,800.000 KWH |
| COLBERT ELEM |
128,640.000 KWH |
167,760.000 KWH |
| COLLINS ELEM |
87,120.000 KWH |
84,720.000 KWH |
| COMMUNITY SCHOOL NORTH |
34,080.000 KWH |
27,960.000 KWH |
| COMMUNITY SCHOOL SOUTH |
4,851.000 KWH |
12,288.000 KWH |
| COOPER CITY COMM |
9,232.000 KWH |
8,909.000 KWH |
| COOPER CITY ELEM |
148,320.000 KWH |
135,600.000 KWH |
| COOPER CITY HIGH |
675,386.000 KWH |
546,446.000 KWH |
| CORAL COVE ELEMENTARY |
151,200.000 KWH |
136,080.000 KWH |
| CORAL GLADES HIGH |
535,920.000 KWH |
455,520.000 KWH |
| CORAL PARK ELEM |
200,640.000 KWH |
156,240.000 KWH |
| CORAL SPRINGS ELEM |
154,800.000 KWH |
144,000.000 KWH |
| CORAL SPRINGS HIGH |
560,293.000 KWH |
512,823.000 KWH |
| CORAL SPRINGS MIDDLE |
267,240.000 KWH |
253,240.000 KWH |
| COUNTRY HILLS ELEM |
177,360.000 KWH |
204,960.000 KWH |
| COUNTRY ISLES ELEM |
218,520.000 KWH |
208,800.000 KWH |
| CRESTHAVEN ELEM |
144,240.000 KWH |
136,440.000 KWH |
| CROISSANT PARK ELEM |
162,263.000 KWH |
155,675.000 KWH |
| CROSS CREEK |
131,820.000 KWH |
99,840.000 KWH |
| CRYSTAL LAKE COMM SCHOOL |
10,978.000 KWH |
11,291.000 KWH |
| CRYSTAL LAKE MIDDLE |
271,051.000 KWH |
278,824.000 KWH |
| CYPRESS BAY HIGH |
638,000.000 KWH |
597,600.000 KWH |
| CYPRESS BAY HIGH ANNEX |
93,120.000 KWH |
75,840.000 KWH |
| CYPRESS ELEM |
171,600.000 KWH |
119,760.000 KWH |
| CYPRESS RUN ALTERNATIVE |
102,410.000 KWH |
80,245.000 KWH |
| DANIA ELEM |
171,439.000 KWH |
141,587.000 KWH |
| DAVE THOMAS ED CENTER (WEST) |
116,880.000 KWH |
108,480.000 KWH |
| DAVE THOMAS EDUCATION CENTER |
44,258.000 KWH |
46,490.000 KWH |
| DAVIE ELEM |
147,010.000 KWH |
140,551.000 KWH |
| DEERFIELD BEACH ELEM |
216,000.000 KWH |
190,672.000 KWH |
| DEERFIELD BEACH HIGH |
484,274.000 KWH |
451,037.000 KWH |
| DEERFIELD BEACH MID |
336,428.000 KWH |
334,385.000 KWH |
| DEERFIELD PARK ELEM |
143,520.000 KWH |
139,320.000 KWH |
| DILLARD ELEM |
177,600.000 KWH |
152,040.000 KWH |
| DILLARD HIGH SCHOOL |
829,799.000 KWH |
676,659.000 KWH |
| DISCOVERY ELEMENTARY |
.000 KWH |
189,360.000 KWH |
| DOLPHIN BAY ELEMENTARY |
141,600.000 KWH |
129,120.000 KWH |
| DREW RESOURCE CTR |
95,032.000 KWH |
101,640.000 KWH |
| DRIFTWOOD ELEM |
116,384.000 KWH |
116,947.000 KWH |
| DRIFTWOOD MIDDLE |
463,013.000 KWH |
457,250.000 KWH |
| EAGLE POINT ELEM |
253,680.000 KWH |
256,320.000 KWH |
| EAGLE RIDGE ELEM |
204,600.000 KWH |
174,960.000 KWH |
| ECIA SPECIAL PROGRAMS |
30,233.000 KWH |
34,018.000 KWH |
| EDGEWOOD CENTER |
62,536.000 KWH |
65,056.000 KWH |
| ELY HIGH |
771,244.000 KWH |
726,830.000 KWH |
| EMBASSY CREEK ELEM |
134,040.000 KWH |
153,480.000 KWH |
| ENDEAVOR LEARNING CENTER |
118,680.000 KWH |
99,240.000 KWH |
| EVERGLADES ELEMENTARY |
274,342.000 KWH |
188,030.000 KWH |
| EVERGLADES HIGH |
669,480.000 KWH |
541,920.000 KWH |
| FAIRWAY ELEM |
234,120.000 KWH |
207,480.000 KWH |
| FALCON COVE MIDDLE |
417,884.000 KWH |
396,023.000 KWH |
| FLAMINGO ELEM |
159,688.000 KWH |
155,008.000 KWH |
| FLANAGAN HIGH |
590,765.000 KWH |
580,571.000 KWH |
| FLORANADA ELEM |
163,536.000 KWH |
159,576.000 KWH |
| FOREST GLEN MIDDLE |
262,017.000 KWH |
240,958.000 KWH |
| FOREST HILLS ELEM |
158,880.000 KWH |
153,120.000 KWH |
| FORT LAUDERDALE HIGH |
647,513.000 KWH |
501,861.000 KWH |
| FOX TRAIL ELEMENTARY |
200,640.000 KWH |
206,040.000 KWH |
| GATOR RUN ELEMENTARY |
378,960.000 KWH |
218,880.000 KWH |
| GLADES MIDDLE |
384,800.000 KWH |
349,200.000 KWH |
| GRIFFIN ELEM |
149,400.000 KWH |
111,960.000 KWH |
| GULFSTREAM MIDDLE SCHOOL |
96,240.000 KWH |
109,440.000 KWH |
| HALLANDALE ADULT CENTER |
201,369.000 KWH |
197,436.000 KWH |
| HALLANDALE ELEM |
156,720.000 KWH |
150,480.000 KWH |
| HALLANDALE HIGH |
339,931.000 KWH |
381,844.000 KWH |
| HARBORDALE ELEM |
86,328.000 KWH |
90,408.000 KWH |
| HAWKES BLUFF ELEM |
221,773.000 KWH |
165,842.000 KWH |
| HERON HEIGHTS ELEMENTARY |
.000 KWH |
156,240.000 KWH |
| HOLLYWOOD CENTRAL AUDITORIUM |
46,320.000 KWH |
46,500.000 KWH |
| HOLLYWOOD CENTRAL ELEM |
117,240.000 KWH |
123,120.000 KWH |
| HOLLYWOOD HILLS COMMUNITY |
4,188.000 KWH |
4,008.000 KWH |
| HOLLYWOOD HILLS ELEMENTARY |
173,280.000 KWH |
190,440.000 KWH |
| HOLLYWOOD HILLS HIGH |
436,127.000 KWH |
430,257.000 KWH |
| HOLLYWOOD PARK ELEM |
134,160.000 KWH |
99,120.000 KWH |
| HORIZON ELEM |
137,880.000 KWH |
106,800.000 KWH |
| HORTT ADMIN SITE |
85,861.000 KWH |
61,211.000 KWH |
| INDIAN RIDGE MIDDLE |
358,656.000 KWH |
348,278.000 KWH |
| INDIAN TRACE ELEM |
144,840.000 KWH |
147,480.000 KWH |
| JAMES HUNT ELEMENTARY |
166,920.000 KWH |
144,480.000 KWH |
| KATHLEEN WRIGHT ADMIN |
424,906.000 KWH |
395,152.000 KWH |
| LAKE FOREST ELEM |
224,280.000 KWH |
171,600.000 KWH |
| LAKESIDE ELEMENTARY |
157,200.000 KWH |
140,640.000 KWH |
| LANIER JAMES CENTER |
69,600.000 KWH |
76,560.000 KWH |
| LARKDALE ELEM |
159,973.000 KWH |
170,883.000 KWH |
| LAUDERDALE LAKES MIDDLE |
207,240.000 KWH |
211,731.000 KWH |
| LAUDERDALE MANORS ELEM |
266,760.000 KWH |
221,400.000 KWH |
| LAUDERHILL MIDDLE |
187,080.000 KWH |
176,640.000 KWH |
| LAUDERHILL MIDDLE/COMM |
5,591.000 KWH |
4,888.000 KWH |
| LAUDERHILL PT ELEM |
170,520.000 KWH |
160,320.000 KWH |
| LIBERTY ELEMENTARY |
212,640.000 KWH |
194,160.000 KWH |
| LLOYD ESTATES ELEM |
117,840.000 KWH |
155,280.000 KWH |
| LOCKHART STADIUM |
89,044.000 KWH |
97,371.000 KWH |
| LYONS CREEK MIDDLE |
363,840.000 KWH |
376,080.000 KWH |
| MANATEE BAY ELEMENTARY |
221,687.000 KWH |
209,892.000 KWH |
| MAPLEWOOD ELEM |
163,320.000 KWH |
159,120.000 KWH |
| MARGATE ELEM |
231,960.000 KWH |
207,480.000 KWH |
| MARGATE MIDDLE |
185,818.000 KWH |
257,406.000 KWH |
| MARKHAM ELEM |
144,143.000 KWH |
134,367.000 KWH |
| MARTIN LUTHER KING ELEM |
205,981.000 KWH |
165,714.000 KWH |
| MCARTHUR HIGH |
495,714.000 KWH |
515,033.000 KWH |
| MCFATTER VO TECH |
373,200.000 KWH |
384,240.000 KWH |
| MCNAB ELEMENTARY |
169,265.000 KWH |
142,477.000 KWH |
| MCNICOL MIDDLE |
296,160.000 KWH |
297,840.000 KWH |
| MEADOWBROOK ELEM |
203,888.000 KWH |
196,560.000 KWH |
| MILLENNIUM MIDDLE |
337,920.000 KWH |
340,320.000 KWH |
| MIRAMAR ELEM |
149,040.000 KWH |
150,120.000 KWH |
| MIRAMAR HIGH |
508,777.000 KWH |
491,980.000 KWH |
| MIRROR LAKE ELEM |
110,400.000 KWH |
106,800.000 KWH |
| MONARCH HIGH |
527,200.000 KWH |
423,600.000 KWH |
| MORROW ELEM |
147,600.000 KWH |
135,360.000 KWH |
| MULTICULTURAL CENTER |
18,240.000 KWH |
23,040.000 KWH |
| N ANDREWS GARDENS ELEM |
287,064.000 KWH |
215,184.000 KWH |
| NEW RENAISSANCE MIDDLE |
322,685.000 KWH |
276,647.000 KWH |
| NEW RIVER CIRCLE SITE |
96,384.000 KWH |
86,064.000 KWH |
| NEW RIVER MIDDLE SCHOOL |
229,080.000 KWH |
280,320.000 KWH |
| NOB HILL ELEM |
158,400.000 KWH |
118,560.000 KWH |
| NORCREST ELEM |
299,528.000 KWH |
162,887.000 KWH |
| NORTH AREA MAINT/WHSE |
43,980.000 KWH |
38,580.000 KWH |
| NORTH BUS PARKING LOT |
96,798.000 KWH |
89,368.000 KWH |
| NORTH CENTRAL SUPERINTENDENT |
111,180.000 KWH |
87,900.000 KWH |
| NORTH FORK ELEM |
58,320.000 KWH |
160,800.000 KWH |
| NORTH LAUDERDALE ELEM |
155,280.000 KWH |
114,720.000 KWH |
| NORTH SIDE ELEMENTARY |
147,720.000 KWH |
125,280.000 KWH |
| NORTHEAST HIGH |
445,744.000 KWH |
331,945.000 KWH |
| NOVA BLANCHE FORMAN/EISENHOWER ELEM |
309,200.000 KWH |
294,000.000 KWH |
| NOVA CENTER - NOVA MIDDLE |
45,480.000 KWH |
45,480.000 KWH |
| NOVA EISENHOWER ELEMENTARY |
13,836.000 KWH |
10,493.000 KWH |
| NOVA HIGH |
14,074.000 KWH |
43,985.000 KWH |
| NOVA HIGH - MECH PLANT |
726,400.000 KWH |
880,000.000 KWH |
| OAKLAND PARK ELEM |
164,400.000 KWH |
202,320.000 KWH |
| OAKRIDGE ELEM |
156,562.000 KWH |
124,451.000 KWH |
| OFF CAMPUS ALTERNATIVE CENTER |
.000 KWH |
1,870.000 KWH |
| OLSEN MIDDLE |
195,120.000 KWH |
229,920.000 KWH |
| OLSEN MIDDLE ANNEX |
153,560.000 KWH |
167,480.000 KWH |
| ORANGE BROOK ELEM |
136,800.000 KWH |
137,760.000 KWH |
| ORIOLE ELEM |
139,680.000 KWH |
126,960.000 KWH |
| PALM COVE ELEM |
177,360.000 KWH |
164,520.000 KWH |
| PALMVIEW ELEM |
160,080.000 KWH |
132,840.000 KWH |
| PANTHER RUN ELEM |
128,040.000 KWH |
118,200.000 KWH |
| PARK LAKES ELEMENTARY |
227,520.000 KWH |
221,040.000 KWH |
| PARK LAKES ELEMENTARY ANNEX |
18,328.000 KWH |
62,488.000 KWH |
| PARK RIDGE ELEM |
131,040.000 KWH |
117,600.000 KWH |
| PARK SPRINGS ELEM |
191,280.000 KWH |
174,000.000 KWH |
| PARK TRAILS ELEMENTARY |
256,080.000 KWH |
201,000.000 KWH |
| PARKSIDE ELEMENTARY |
195,360.000 KWH |
175,440.000 KWH |
| PARKWAY MIDDLE |
376,323.000 KWH |
370,260.000 KWH |
| PASADENA LAKES ELEM |
211,682.000 KWH |
185,351.000 KWH |
| PEMBROKE LAKES ELEM |
141,120.000 KWH |
121,500.000 KWH |
| PEMBROKE PINES ELEM |
127,322.000 KWH |
139,138.000 KWH |
| PERRY ELEM |
167,473.000 KWH |
161,550.000 KWH |
| PERRY MIDDLE |
216,720.000 KWH |
214,800.000 KWH |
| PETERS ELEM |
170,954.000 KWH |
148,187.000 KWH |
| PHYSICAL PLANT OPERATIONS |
124,445.000 KWH |
121,894.000 KWH |
| PINE RIDGE CTR |
100,320.000 KWH |
98,640.000 KWH |
| PINES LAKES ELEM |
161,400.000 KWH |
195,840.000 KWH |
| PINES MIDDLE |
265,048.000 KWH |
254,008.000 KWH |
| PINEWOOD ELEM |
218,760.000 KWH |
141,720.000 KWH |
| PIONEER MIDDLE |
234,217.000 KWH |
226,475.000 KWH |
| PIONEER MIDDLE ANNEX |
50,820.000 KWH |
34,740.000 KWH |
| PIPER HIGH |
609,301.000 KWH |
549,809.000 KWH |
| PLANTATION ELEM |
161,109.000 KWH |
160,887.000 KWH |
| PLANTATION HIGH |
487,557.000 KWH |
463,510.000 KWH |
| PLANTATION MIDDLE |
251,884.000 KWH |
313,444.000 KWH |
| PLANTATION PARK ELEM |
114,957.000 KWH |
109,200.000 KWH |
| POMPANO BEACH ELEM |
150,000.000 KWH |
150,480.000 KWH |
| POMPANO BEACH HIGH |
355,823.000 KWH |
387,473.000 KWH |
| POMPANO BEACH MIDDLE |
288,408.000 KWH |
323,808.000 KWH |
| PORTABLE AT PINES |
121,286.000 KWH |
117,122.000 KWH |
| PPO ZONE 2 - LEASED |
27,225.000 KWH |
24,511.000 KWH |
| QUIET WATERS ELEM |
182,700.000 KWH |
223,320.000 KWH |
| RAMBLEWOOD ELEM |
204,240.000 KWH |
162,960.000 KWH |
| RAMBLEWOOD MIDDLE |
333,894.000 KWH |
294,906.000 KWH |
| RICKARDS MIDDLE |
239,444.000 KWH |
223,724.000 KWH |
| RIVERGLADES ELEM |
132,240.000 KWH |
114,720.000 KWH |
| RIVERLAND ELEM |
130,680.000 KWH |
128,160.000 KWH |
| RIVERSIDE ELEM |
208,800.000 KWH |
190,200.000 KWH |
| ROCK ISLAND ADMIN |
100,992.000 KWH |
96,672.000 KWH |
| ROYAL PALM ELEMENTARY |
207,767.000 KWH |
234,322.000 KWH |
| SANDERS PARK ELEM |
125,200.000 KWH |
120,800.000 KWH |
| SANDPIPER ELEM |
214,560.000 KWH |
205,080.000 KWH |
| SAWGRASS ELEM |
180,480.000 KWH |
173,640.000 KWH |
| SAWGRASS SPRINGS MIDDLE |
286,560.000 KWH |
266,040.000 KWH |
| SEA CASTLE ELEM |
205,680.000 KWH |
187,440.000 KWH |
| SEAGULL SCHOOL |
176,354.000 KWH |
144,901.000 KWH |
| SEMINOLE MIDDLE |
261,960.000 KWH |
241,440.000 KWH |
| SHERIDAN HILLS ELEM |
124,594.000 KWH |
118,136.000 KWH |
| SHERIDAN PARK ELEM |
114,240.000 KWH |
144,000.000 KWH |
| SHERIDAN VOCATIONAL |
379,680.000 KWH |
338,160.000 KWH |
| SILVER LAKES ELEMENTARY |
149,880.000 KWH |
138,120.000 KWH |
| SILVER LAKES MIDDLE |
217,920.000 KWH |
221,400.000 KWH |
| SILVER PALMS ELEM |
185,280.000 KWH |
257,520.000 KWH |
| SILVER RIDGE ELEM |
254,040.000 KWH |
241,200.000 KWH |
| SILVER SHORES ELEMENTARY |
182,400.000 KWH |
160,800.000 KWH |
| SILVER TRAIL MIDDLE |
303,360.000 KWH |
318,240.000 KWH |
| SOUTH AREA BUS PARKING |
50,267.000 KWH |
49,573.000 KWH |
| SOUTH AREA MAINTENANCE |
21,251.000 KWH |
23,218.000 KWH |
| SOUTH BROWARD HIGH |
484,882.000 KWH |
465,142.000 KWH |
| SOUTH PLANTATION HIGH |
505,874.000 KWH |
481,463.000 KWH |
| Southwest Area Bus Complex |
34,071.000 KWH |
42,598.000 KWH |
| STEPHEN FOSTER ELEM |
171,140.000 KWH |
151,289.000 KWH |
| STIRLING ELEM |
132,840.000 KWH |
125,040.000 KWH |
| STONEMAN DOUGLAS HIGH |
544,800.000 KWH |
631,200.000 KWH |
| STRANAHAN HIGH |
497,055.000 KWH |
555,943.000 KWH |
| SUNLAND PARK ELEM |
124,320.000 KWH |
109,080.000 KWH |
| SUNRISE MIDDLE |
282,105.000 KWH |
249,073.000 KWH |
| SUNSET LAKES ELEMENTARY |
164,400.000 KWH |
179,880.000 KWH |
| SUNSET SCHOOL |
128,352.000 KWH |
126,192.000 KWH |
| SUNSHINE ELEMENTARY |
125,015.000 KWH |
142,162.000 KWH |
| TAMARAC ELEM |
200,640.000 KWH |
198,480.000 KWH |
| TARAVELLA HIGH |
644,941.000 KWH |
540,470.000 KWH |
| TECHNOLOGY AND SUPPORT SERVICE |
387,360.000 KWH |
380,160.000 KWH |
| TEDDER ELEMENTARY SCHOOL |
182,682.000 KWH |
179,583.000 KWH |
| TEQUESTA TRACE MIDDLE |
258,120.000 KWH |
257,640.000 KWH |
| THE QUEST CENTER |
107,520.000 KWH |
104,520.000 KWH |
| THURGOOD MARSHALL ELEM |
146,424.000 KWH |
124,104.000 KWH |
| TRADEWINDS ELEM |
186,240.000 KWH |
208,560.000 KWH |
| Transportation Services Annex |
14,280.000 KWH |
9,840.000 KWH |
| TROPICAL ELEM |
169,407.000 KWH |
187,669.000 KWH |
| TWIN LAKES ADMIN |
72,720.000 KWH |
80,160.000 KWH |
| TWIN LAKES ANNEX/NEW WHSE |
3,387.000 KWH |
2,294.000 KWH |
| TWIN LAKES COMPLEX |
131,243.000 KWH |
127,234.000 KWH |
| VEHICLE MAINTENANCE |
106,080.000 KWH |
95,280.000 KWH |
| VILLAGE ELEM |
222,540.000 KWH |
171,000.000 KWH |
| VIRGINIA YOUNG ELEM |
114,120.000 KWH |
124,680.000 KWH |
| WALKER ELEM |
245,264.000 KWH |
248,178.000 KWH |
| WALTER C YOUNG MIDDLE |
513,082.000 KWH |
478,886.000 KWH |
| WATKINS ELEM |
180,480.000 KWH |
188,880.000 KWH |
| WELLEBY ELEM |
154,560.000 KWH |
131,760.000 KWH |
| WEST BROWARD HIG/LLL |
518,400.000 KWH |
496,000.000 KWH |
| WEST CENTRAL BUS COMPLEX |
70,872.000 KWH |
66,906.000 KWH |
| WEST HOLLYWOOD ELEM |
130,440.000 KWH |
128,640.000 KWH |
| WESTCHESTER ELEMENTARY |
185,528.000 KWH |
184,026.000 KWH |
| WESTERN HIGH |
563,631.000 KWH |
651,108.000 KWH |
| WESTGLADES MIDDLE |
326,400.000 KWH |
324,480.000 KWH |
| WESTPINE MIDDLE |
200,880.000 KWH |
196,920.000 KWH |
| WESTWOOD HEIGHTS ELEM |
210,532.000 KWH |
159,569.000 KWH |
| WHIDDON-ROGERS ED CENTER |
203,200.000 KWH |
189,200.000 KWH |
| WHISPERING PINES |
90,840.000 KWH |
100,680.000 KWH |
| WILLIAM DANDY MIDDLE |
237,360.000 KWH |
216,720.000 KWH |
| WILTON MANORS ELEM |
163,500.000 KWH |
145,860.000 KWH |
| WINGATE OAKS CTR |
127,320.000 KWH |
117,360.000 KWH |
| WINSTON PARK ELEM |
200,880.000 KWH |
188,640.000 KWH |
|