Utility Savings
Building
Sep-08
Sep-09
APOLLO MIDDLE 288,480.000 KWH 277,920.000 KWH
ARTHUR ASHE MIDDLE 346,000.000 KWH 349,200.000 KWH
ATLANTIC VOC CENTER 636,716.000 KWH 604,252.000 KWH
ATLANTIC WEST ELEM 168,960.000 KWH 151,440.000 KWH
ATTUCKS MIDDLE 295,200.000 KWH 306,019.000 KWH
BAIR MIDDLE 214,080.000 KWH 207,120.000 KWH
BANYAN ELEM 160,560.000 KWH 142,560.000 KWH
BAYVIEW ELEM 113,640.000 KWH 101,040.000 KWH
BECON 246,080.000 KWH 194,600.000 KWH
BENNETT ELEM 125,280.000 KWH 112,320.000 KWH
BETHUNE ELEM 226,440.000 KWH 214,200.000 KWH
BOULEVARD HEIGHTS ELEM 171,720.000 KWH 142,560.000 KWH
BOYD ANDERSON HIGH 519,419.000 KWH 512,520.000 KWH
BRIGHT HORIZONS CTR 164,880.000 KWH 133,440.000 KWH
BROADVIEW ELEM 161,646.000 KWH 159,483.000 KWH
BROWARD ESTATES ELEM 148,333.000 KWH 155,953.000 KWH
BROWARD FIRE ACADEMY 33,259.000 KWH 47,119.000 KWH
CASTLE HILL ELEM 158,640.000 KWH 146,160.000 KWH
CENTRAL PARK ELEM 185,400.000 KWH 187,200.000 KWH
CHALLENGER ELEMENTARY 198,240.000 KWH 178,560.000 KWH
CHAPEL TRAIL ELEM 255,017.000 KWH 197,152.000 KWH
CHARLES DREW ELEM 142,440.000 KWH 129,120.000 KWH
COCONUT CREEK ELEM 126,733.000 KWH 110,588.000 KWH
COCONUT CREEK HIGH 428,110.000 KWH 374,713.000 KWH
COCONUT PALM ELEMENTARY 196,560.000 KWH 160,800.000 KWH
COLBERT ELEM 128,640.000 KWH 167,760.000 KWH
COLLINS ELEM 87,120.000 KWH 84,720.000 KWH
COMMUNITY SCHOOL NORTH 34,080.000 KWH 27,960.000 KWH
COMMUNITY SCHOOL SOUTH 4,851.000 KWH 12,288.000 KWH
COOPER CITY COMM 9,232.000 KWH 8,909.000 KWH
COOPER CITY ELEM 148,320.000 KWH 135,600.000 KWH
COOPER CITY HIGH 675,386.000 KWH 546,446.000 KWH
CORAL COVE ELEMENTARY 151,200.000 KWH 136,080.000 KWH
CORAL GLADES HIGH 535,920.000 KWH 455,520.000 KWH
CORAL PARK ELEM 200,640.000 KWH 156,240.000 KWH
CORAL SPRINGS ELEM 154,800.000 KWH 144,000.000 KWH
CORAL SPRINGS HIGH 560,293.000 KWH 512,823.000 KWH
CORAL SPRINGS MIDDLE 267,240.000 KWH 253,240.000 KWH
COUNTRY HILLS ELEM 177,360.000 KWH 204,960.000 KWH
COUNTRY ISLES ELEM 218,520.000 KWH 208,800.000 KWH
CRESTHAVEN ELEM 144,240.000 KWH 136,440.000 KWH
CROISSANT PARK ELEM 162,263.000 KWH 155,675.000 KWH
CROSS CREEK 131,820.000 KWH 99,840.000 KWH
CRYSTAL LAKE COMM SCHOOL 10,978.000 KWH 11,291.000 KWH
CRYSTAL LAKE MIDDLE 271,051.000 KWH 278,824.000 KWH
CYPRESS BAY HIGH 638,000.000 KWH 597,600.000 KWH
CYPRESS BAY HIGH ANNEX 93,120.000 KWH 75,840.000 KWH
CYPRESS ELEM 171,600.000 KWH 119,760.000 KWH
CYPRESS RUN ALTERNATIVE 102,410.000 KWH 80,245.000 KWH
DANIA ELEM 171,439.000 KWH 141,587.000 KWH
DAVE THOMAS ED CENTER (WEST) 116,880.000 KWH 108,480.000 KWH
DAVE THOMAS EDUCATION CENTER 44,258.000 KWH 46,490.000 KWH
DAVIE ELEM 147,010.000 KWH 140,551.000 KWH
DEERFIELD BEACH ELEM 216,000.000 KWH 190,672.000 KWH
DEERFIELD BEACH HIGH 484,274.000 KWH 451,037.000 KWH
DEERFIELD BEACH MID 336,428.000 KWH 334,385.000 KWH
DEERFIELD PARK ELEM 143,520.000 KWH 139,320.000 KWH
DILLARD ELEM 177,600.000 KWH 152,040.000 KWH
DILLARD HIGH SCHOOL 829,799.000 KWH 676,659.000 KWH
DISCOVERY ELEMENTARY .000 KWH 189,360.000 KWH
DOLPHIN BAY ELEMENTARY 141,600.000 KWH 129,120.000 KWH
DREW RESOURCE CTR 95,032.000 KWH 101,640.000 KWH
DRIFTWOOD ELEM 116,384.000 KWH 116,947.000 KWH
DRIFTWOOD MIDDLE 463,013.000 KWH 457,250.000 KWH
EAGLE POINT ELEM 253,680.000 KWH 256,320.000 KWH
EAGLE RIDGE ELEM 204,600.000 KWH 174,960.000 KWH
ECIA SPECIAL PROGRAMS 30,233.000 KWH 34,018.000 KWH
EDGEWOOD CENTER 62,536.000 KWH 65,056.000 KWH
ELY HIGH 771,244.000 KWH 726,830.000 KWH
EMBASSY CREEK ELEM 134,040.000 KWH 153,480.000 KWH
ENDEAVOR LEARNING CENTER 118,680.000 KWH 99,240.000 KWH
EVERGLADES ELEMENTARY 274,342.000 KWH 188,030.000 KWH
EVERGLADES HIGH 669,480.000 KWH 541,920.000 KWH
FAIRWAY ELEM 234,120.000 KWH 207,480.000 KWH
FALCON COVE MIDDLE 417,884.000 KWH 396,023.000 KWH
FLAMINGO ELEM 159,688.000 KWH 155,008.000 KWH
FLANAGAN HIGH 590,765.000 KWH 580,571.000 KWH
FLORANADA ELEM 163,536.000 KWH 159,576.000 KWH
FOREST GLEN MIDDLE 262,017.000 KWH 240,958.000 KWH
FOREST HILLS ELEM 158,880.000 KWH 153,120.000 KWH
FORT LAUDERDALE HIGH 647,513.000 KWH 501,861.000 KWH
FOX TRAIL ELEMENTARY 200,640.000 KWH 206,040.000 KWH
GATOR RUN ELEMENTARY 378,960.000 KWH 218,880.000 KWH
GLADES MIDDLE 384,800.000 KWH 349,200.000 KWH
GRIFFIN ELEM 149,400.000 KWH 111,960.000 KWH
GULFSTREAM MIDDLE SCHOOL 96,240.000 KWH 109,440.000 KWH
HALLANDALE ADULT CENTER 201,369.000 KWH 197,436.000 KWH
HALLANDALE ELEM 156,720.000 KWH 150,480.000 KWH
HALLANDALE HIGH 339,931.000 KWH 381,844.000 KWH
HARBORDALE ELEM 86,328.000 KWH 90,408.000 KWH
HAWKES BLUFF ELEM 221,773.000 KWH 165,842.000 KWH
HERON HEIGHTS ELEMENTARY .000 KWH 156,240.000 KWH
HOLLYWOOD CENTRAL AUDITORIUM 46,320.000 KWH 46,500.000 KWH
HOLLYWOOD CENTRAL ELEM 117,240.000 KWH 123,120.000 KWH
HOLLYWOOD HILLS COMMUNITY 4,188.000 KWH 4,008.000 KWH
HOLLYWOOD HILLS ELEMENTARY 173,280.000 KWH 190,440.000 KWH
HOLLYWOOD HILLS HIGH 436,127.000 KWH 430,257.000 KWH
HOLLYWOOD PARK ELEM 134,160.000 KWH 99,120.000 KWH
HORIZON ELEM 137,880.000 KWH 106,800.000 KWH
HORTT ADMIN SITE 85,861.000 KWH 61,211.000 KWH
INDIAN RIDGE MIDDLE 358,656.000 KWH 348,278.000 KWH
INDIAN TRACE ELEM 144,840.000 KWH 147,480.000 KWH
JAMES HUNT ELEMENTARY 166,920.000 KWH 144,480.000 KWH
KATHLEEN WRIGHT ADMIN 424,906.000 KWH 395,152.000 KWH
LAKE FOREST ELEM 224,280.000 KWH 171,600.000 KWH
LAKESIDE ELEMENTARY 157,200.000 KWH 140,640.000 KWH
LANIER JAMES CENTER 69,600.000 KWH 76,560.000 KWH
LARKDALE ELEM 159,973.000 KWH 170,883.000 KWH
LAUDERDALE LAKES MIDDLE 207,240.000 KWH 211,731.000 KWH
LAUDERDALE MANORS ELEM 266,760.000 KWH 221,400.000 KWH
LAUDERHILL MIDDLE 187,080.000 KWH 176,640.000 KWH
LAUDERHILL MIDDLE/COMM 5,591.000 KWH 4,888.000 KWH
LAUDERHILL PT ELEM 170,520.000 KWH 160,320.000 KWH
LIBERTY ELEMENTARY 212,640.000 KWH 194,160.000 KWH
LLOYD ESTATES ELEM 117,840.000 KWH 155,280.000 KWH
LOCKHART STADIUM 89,044.000 KWH 97,371.000 KWH
LYONS CREEK MIDDLE 363,840.000 KWH 376,080.000 KWH
MANATEE BAY ELEMENTARY 221,687.000 KWH 209,892.000 KWH
MAPLEWOOD ELEM 163,320.000 KWH 159,120.000 KWH
MARGATE ELEM 231,960.000 KWH 207,480.000 KWH
MARGATE MIDDLE 185,818.000 KWH 257,406.000 KWH
MARKHAM ELEM 144,143.000 KWH 134,367.000 KWH
MARTIN LUTHER KING ELEM 205,981.000 KWH 165,714.000 KWH
MCARTHUR HIGH 495,714.000 KWH 515,033.000 KWH
MCFATTER VO TECH 373,200.000 KWH 384,240.000 KWH
MCNAB ELEMENTARY 169,265.000 KWH 142,477.000 KWH
MCNICOL MIDDLE 296,160.000 KWH 297,840.000 KWH
MEADOWBROOK ELEM 203,888.000 KWH 196,560.000 KWH
MILLENNIUM MIDDLE 337,920.000 KWH 340,320.000 KWH
MIRAMAR ELEM 149,040.000 KWH 150,120.000 KWH
MIRAMAR HIGH 508,777.000 KWH 491,980.000 KWH
MIRROR LAKE ELEM 110,400.000 KWH 106,800.000 KWH
MONARCH HIGH 527,200.000 KWH 423,600.000 KWH
MORROW ELEM 147,600.000 KWH 135,360.000 KWH
MULTICULTURAL CENTER 18,240.000 KWH 23,040.000 KWH
N ANDREWS GARDENS ELEM 287,064.000 KWH 215,184.000 KWH
NEW RENAISSANCE MIDDLE 322,685.000 KWH 276,647.000 KWH
NEW RIVER CIRCLE SITE 96,384.000 KWH 86,064.000 KWH
NEW RIVER MIDDLE SCHOOL 229,080.000 KWH 280,320.000 KWH
NOB HILL ELEM 158,400.000 KWH 118,560.000 KWH
NORCREST ELEM 299,528.000 KWH 162,887.000 KWH
NORTH AREA MAINT/WHSE 43,980.000 KWH 38,580.000 KWH
NORTH BUS PARKING LOT 96,798.000 KWH 89,368.000 KWH
NORTH CENTRAL SUPERINTENDENT 111,180.000 KWH 87,900.000 KWH
NORTH FORK ELEM 58,320.000 KWH 160,800.000 KWH
NORTH LAUDERDALE ELEM 155,280.000 KWH 114,720.000 KWH
NORTH SIDE ELEMENTARY 147,720.000 KWH 125,280.000 KWH
NORTHEAST HIGH 445,744.000 KWH 331,945.000 KWH
NOVA BLANCHE FORMAN/EISENHOWER ELEM 309,200.000 KWH 294,000.000 KWH
NOVA CENTER - NOVA MIDDLE 45,480.000 KWH 45,480.000 KWH
NOVA EISENHOWER ELEMENTARY 13,836.000 KWH 10,493.000 KWH
NOVA HIGH 14,074.000 KWH 43,985.000 KWH
NOVA HIGH - MECH PLANT 726,400.000 KWH 880,000.000 KWH
OAKLAND PARK ELEM 164,400.000 KWH 202,320.000 KWH
OAKRIDGE ELEM 156,562.000 KWH 124,451.000 KWH
OFF CAMPUS ALTERNATIVE CENTER .000 KWH 1,870.000 KWH
OLSEN MIDDLE 195,120.000 KWH 229,920.000 KWH
OLSEN MIDDLE ANNEX 153,560.000 KWH 167,480.000 KWH
ORANGE BROOK ELEM 136,800.000 KWH 137,760.000 KWH
ORIOLE ELEM 139,680.000 KWH 126,960.000 KWH
PALM COVE ELEM 177,360.000 KWH 164,520.000 KWH
PALMVIEW ELEM 160,080.000 KWH 132,840.000 KWH
PANTHER RUN ELEM 128,040.000 KWH 118,200.000 KWH
PARK LAKES ELEMENTARY 227,520.000 KWH 221,040.000 KWH
PARK LAKES ELEMENTARY ANNEX 18,328.000 KWH 62,488.000 KWH
PARK RIDGE ELEM 131,040.000 KWH 117,600.000 KWH
PARK SPRINGS ELEM 191,280.000 KWH 174,000.000 KWH
PARK TRAILS ELEMENTARY 256,080.000 KWH 201,000.000 KWH
PARKSIDE ELEMENTARY 195,360.000 KWH 175,440.000 KWH
PARKWAY MIDDLE 376,323.000 KWH 370,260.000 KWH
PASADENA LAKES ELEM 211,682.000 KWH 185,351.000 KWH
PEMBROKE LAKES ELEM 141,120.000 KWH 121,500.000 KWH
PEMBROKE PINES ELEM 127,322.000 KWH 139,138.000 KWH
PERRY ELEM 167,473.000 KWH 161,550.000 KWH
PERRY MIDDLE 216,720.000 KWH 214,800.000 KWH
PETERS ELEM 170,954.000 KWH 148,187.000 KWH
PHYSICAL PLANT OPERATIONS 124,445.000 KWH 121,894.000 KWH
PINE RIDGE CTR 100,320.000 KWH 98,640.000 KWH
PINES LAKES ELEM 161,400.000 KWH 195,840.000 KWH
PINES MIDDLE 265,048.000 KWH 254,008.000 KWH
PINEWOOD ELEM 218,760.000 KWH 141,720.000 KWH
PIONEER MIDDLE 234,217.000 KWH 226,475.000 KWH
PIONEER MIDDLE ANNEX 50,820.000 KWH 34,740.000 KWH
PIPER HIGH 609,301.000 KWH 549,809.000 KWH
PLANTATION ELEM 161,109.000 KWH 160,887.000 KWH
PLANTATION HIGH 487,557.000 KWH 463,510.000 KWH
PLANTATION MIDDLE 251,884.000 KWH 313,444.000 KWH
PLANTATION PARK ELEM 114,957.000 KWH 109,200.000 KWH
POMPANO BEACH ELEM 150,000.000 KWH 150,480.000 KWH
POMPANO BEACH HIGH 355,823.000 KWH 387,473.000 KWH
POMPANO BEACH MIDDLE 288,408.000 KWH 323,808.000 KWH
PORTABLE AT PINES 121,286.000 KWH 117,122.000 KWH
PPO ZONE 2 - LEASED 27,225.000 KWH 24,511.000 KWH
QUIET WATERS ELEM 182,700.000 KWH 223,320.000 KWH
RAMBLEWOOD ELEM 204,240.000 KWH 162,960.000 KWH
RAMBLEWOOD MIDDLE 333,894.000 KWH 294,906.000 KWH
RICKARDS MIDDLE 239,444.000 KWH 223,724.000 KWH
RIVERGLADES ELEM 132,240.000 KWH 114,720.000 KWH
RIVERLAND ELEM 130,680.000 KWH 128,160.000 KWH
RIVERSIDE ELEM 208,800.000 KWH 190,200.000 KWH
ROCK ISLAND ADMIN 100,992.000 KWH 96,672.000 KWH
ROYAL PALM ELEMENTARY 207,767.000 KWH 234,322.000 KWH
SANDERS PARK ELEM 125,200.000 KWH 120,800.000 KWH
SANDPIPER ELEM 214,560.000 KWH 205,080.000 KWH
SAWGRASS ELEM 180,480.000 KWH 173,640.000 KWH
SAWGRASS SPRINGS MIDDLE 286,560.000 KWH 266,040.000 KWH
SEA CASTLE ELEM 205,680.000 KWH 187,440.000 KWH
SEAGULL SCHOOL 176,354.000 KWH 144,901.000 KWH
SEMINOLE MIDDLE 261,960.000 KWH 241,440.000 KWH
SHERIDAN HILLS ELEM 124,594.000 KWH 118,136.000 KWH
SHERIDAN PARK ELEM 114,240.000 KWH 144,000.000 KWH
SHERIDAN VOCATIONAL 379,680.000 KWH 338,160.000 KWH
SILVER LAKES ELEMENTARY 149,880.000 KWH 138,120.000 KWH
SILVER LAKES MIDDLE 217,920.000 KWH 221,400.000 KWH
SILVER PALMS ELEM 185,280.000 KWH 257,520.000 KWH
SILVER RIDGE ELEM 254,040.000 KWH 241,200.000 KWH
SILVER SHORES ELEMENTARY 182,400.000 KWH 160,800.000 KWH
SILVER TRAIL MIDDLE 303,360.000 KWH 318,240.000 KWH
SOUTH AREA BUS PARKING 50,267.000 KWH 49,573.000 KWH
SOUTH AREA MAINTENANCE 21,251.000 KWH 23,218.000 KWH
SOUTH BROWARD HIGH 484,882.000 KWH 465,142.000 KWH
SOUTH PLANTATION HIGH 505,874.000 KWH 481,463.000 KWH
Southwest Area Bus Complex 34,071.000 KWH 42,598.000 KWH
STEPHEN FOSTER ELEM 171,140.000 KWH 151,289.000 KWH
STIRLING ELEM 132,840.000 KWH 125,040.000 KWH
STONEMAN DOUGLAS HIGH 544,800.000 KWH 631,200.000 KWH
STRANAHAN HIGH 497,055.000 KWH 555,943.000 KWH
SUNLAND PARK ELEM 124,320.000 KWH 109,080.000 KWH
SUNRISE MIDDLE 282,105.000 KWH 249,073.000 KWH
SUNSET LAKES ELEMENTARY 164,400.000 KWH 179,880.000 KWH
SUNSET SCHOOL 128,352.000 KWH 126,192.000 KWH
SUNSHINE ELEMENTARY 125,015.000 KWH 142,162.000 KWH
TAMARAC ELEM 200,640.000 KWH 198,480.000 KWH
TARAVELLA HIGH 644,941.000 KWH 540,470.000 KWH
TECHNOLOGY AND SUPPORT SERVICE 387,360.000 KWH 380,160.000 KWH
TEDDER ELEMENTARY SCHOOL 182,682.000 KWH 179,583.000 KWH
TEQUESTA TRACE MIDDLE 258,120.000 KWH 257,640.000 KWH
THE QUEST CENTER 107,520.000 KWH 104,520.000 KWH
THURGOOD MARSHALL ELEM 146,424.000 KWH 124,104.000 KWH
TRADEWINDS ELEM 186,240.000 KWH 208,560.000 KWH
Transportation Services Annex 14,280.000 KWH 9,840.000 KWH
TROPICAL ELEM 169,407.000 KWH 187,669.000 KWH
TWIN LAKES ADMIN 72,720.000 KWH 80,160.000 KWH
TWIN LAKES ANNEX/NEW WHSE 3,387.000 KWH 2,294.000 KWH
TWIN LAKES COMPLEX 131,243.000 KWH 127,234.000 KWH
VEHICLE MAINTENANCE 106,080.000 KWH 95,280.000 KWH
VILLAGE ELEM 222,540.000 KWH 171,000.000 KWH
VIRGINIA YOUNG ELEM 114,120.000 KWH 124,680.000 KWH
WALKER ELEM 245,264.000 KWH 248,178.000 KWH
WALTER C YOUNG MIDDLE 513,082.000 KWH 478,886.000 KWH
WATKINS ELEM 180,480.000 KWH 188,880.000 KWH
WELLEBY ELEM 154,560.000 KWH 131,760.000 KWH
WEST BROWARD HIG/LLL 518,400.000 KWH 496,000.000 KWH
WEST CENTRAL BUS COMPLEX 70,872.000 KWH 66,906.000 KWH
WEST HOLLYWOOD ELEM 130,440.000 KWH 128,640.000 KWH
WESTCHESTER ELEMENTARY 185,528.000 KWH 184,026.000 KWH
WESTERN HIGH 563,631.000 KWH 651,108.000 KWH
WESTGLADES MIDDLE 326,400.000 KWH 324,480.000 KWH
WESTPINE MIDDLE 200,880.000 KWH 196,920.000 KWH
WESTWOOD HEIGHTS ELEM 210,532.000 KWH 159,569.000 KWH
WHIDDON-ROGERS ED CENTER 203,200.000 KWH 189,200.000 KWH
WHISPERING PINES 90,840.000 KWH 100,680.000 KWH
WILLIAM DANDY MIDDLE 237,360.000 KWH 216,720.000 KWH
WILTON MANORS ELEM 163,500.000 KWH 145,860.000 KWH
WINGATE OAKS CTR 127,320.000 KWH 117,360.000 KWH
WINSTON PARK ELEM 200,880.000 KWH 188,640.000 KWH